Cameroon: Poverty Reduction Strategy Paper Implementation Progress Report

Author(s):
International Monetary Fund
Published Date:
October 2004
Share
  • ShareShare
Information about Sub-Saharan Africa África subsahariana
Show Summary Details

ANNEXE 1: IMPLEMENTATION MATRIX OF THE PRSP

Core area 1: Promotion of a stable macro-economic framework
Measures/actionsFollow-up indicatorsPeriod of executionAssigned institutionLevel of executionObservations
1.1 Macro-economic and budgetary framework
Maintaining a stable macro economic framework and implementing, in a satisfactory way, the final year of the second three-year economic and financial programme under PRGFSatisfactory execution of the third year of the PRGF2003MINFIMINEPATCCS/PPTEThe first two years of the programme (October 2000-September 2001 and 1 October 2001-30 September 2002) were globally satisfactory. There were however some technical problems encountered during the 2002 second semester which delayed the final establishment of the budgetary statement towards the end of December 2002, as well as the overall performance for the second semester of the second annual agreement. These problems were however overcome during the 2003 first semester thanks to the strict implementation of corrective measures taken by the authorities who also pursued the implementation of reforms in budget management and in the real sectors of the economy.



The Prime Minister, Head of Government signed on 2 December 2003, the letter of intent of Cameroon for the fourth review of the Medium-Term Economic and Financial Programme backed by the Poverty Reduction and Growth Facility (PRGF).



During its 17 December 2003 session, the Board of Directors of the IMF examined Cameroon’s file and took key decisions at the end of its meeting. As a matter of fact, the board

(i) approved the fourth review of the medium-term programme;

(ii) extended the duration of the PRGF programme to 20 December 2004;

(iii) authorized the disbursement of a sum of USD 27.4 million, representing (i) USD 23 million (about CFAF 14 thousand million) of the close of the fourth review, and (ii) USD 4.4 million (about CFAF 2.7 thousand million) of interim assistance under HIPC initiative.



The Government has embarked on the implementation of execution criteria, as well as quantitative and structural benchmarks of the third and last annual programme under the agreement backed by the PRFG.
Using budget savings derived from the debt relief, in conformity with criteria set out in the decision point document (control and monitoring mechanisms)Satisfactory execution of projects deemed eligible by the CCS/PPTE and approved by the Government2003MINFI

MINEPAT

CCS/PPTE
  • A special account earmarked for HIPC funds was opened at BEAC in October 2000. As of 10 January 2004, a sum of CFAF 156 thousand million was deposited in this account.
  • An Advisory and Follow-up Committee for the management of HIPC resources was set up by Decree N°2000/960/PM of 1 December 2000. The Committee comprises 19 members including: 6 government officials, 5 representatives of donor agencies, 1 representative of the private sector, 3 representatives of religious groups, 1 representative of professional micro-finance associations, 2 representatives of NGOs and associations.
  • Resident representatives of the IMF and the World Bank took part in working sessions organised by the Committee as observers.
  • The implementation of the first set of programmes and projects approved by the CCS/PPTE got off on a slow and difficult start due to technical problems linked to the establishment of transparent disbursement mechanisms within the budget procedures and processes in place.


Moreover, the preparation of good quality programmes and projects by promoters took a longer period of time due to the following problems: (1) poor technical capacities of promoters both from the private and public sectors, (2) poor institutional capacities and (3) problems of organisation and functioning at the level of the CCS/PPTE which are currently being overcome. The Government had taken appropriate measures to secure and speed up the disbursement of HIPC resources. With the support of the UNDP, a national sensitisation and information campaign was organised for the preparation of programmes and projects to be submitted to the CCS/PPTE before adoption by the Government. The Government is also preparing to launch the first technical and financial audit of projects financed under HIPC funds.

Projects validated during the transitional period are being executed.
  • A surplus sum of CFAF 27 thousand million which was recorded for the 2003 financial year will be carry over to the 2004 financial year whose package amounts to CFAF 90 thousand million.


The Prime Minister, Head of Government signed Decree N°2004/0556/PM of 23 February 2004 relating to the distribution of HIPC resources listed in the 2004 budget representing recurrent and investment budget. The priority here was given to social sectors, rural development and infrastructure.
Executing in a satisfactory manner the Third Structural Adjustment Credit (CAS III) and observing the closing date of the credit (30 June 2003)Disbursement conditionalities of the floating bracket earmarked for the implementation of reforms of the port sector;

Drawing up of the CDC privatisation strategy for the following sectors: banana, rubber and palm oil; preparation of tender documents for this purpose Preparation of CAMTEL preliminary business plan and specifications; Finalisation of transaction documents for SNEC concession.
2003MINFI

MINEPAT
The overall conditionalities related to the remaining floating brackets (second privatisation and transport brackets) were realised as of 13 December 2003. The close of CAS III was extended to 31 March 2004 with regard to deadline for domestic review and disbursement by the IDA.

CDC

As concerns the drawing up of the privatisation strategy for banana, rubber and palm oil sections, the plan of action is being executed notably as concerns banana. Consultants were recruited for the privatisation of rubber and palm oil, and the plan of action for the revival of these products was prepared and adopted.

A consultant was recruited in October 2003 to evaluate the banana sector. As concerns rubber and palm oil sectors, actions took off in December 2003. What is expected now is: the preparation of reports on (i) evaluation of the banana sector, (ii) judicial studies of agreements on the banana sector signed by the CDC and (iv) reference benchmark.

The convention on the take over of the tea sector was signed by the buyer BROBON FTNEX PT Y Ltd-Cameroon Tea Estate.

Government consultants in the privatisation process of banana, rubber and palm oil sector were recruited and a plan of action to revive these sectors was adopted: an interministerial committee will establish the new core areas for privatisation by the end of March 2004. Terms of reference for the recruitment of a business bank in charge of preparing tender documents were formulated.

CAMTEL

The invitation to tender for the execution of the minimum investment plan was launched.

With the consent of donor agencies, CAMTEL and the Government signed a provisional concession convention on 4 January 2004. The convention which has a duration of 2 (two) years renewable is accompanied with specifications. The convention allows for an investment of CFAF 26 thousand million within the framework of a minimum investment programme. The convention can be substituted any time by a final concession convention that could be granted to CAMTEL upon completion of the privatisation process.

The business plan was signed in December 2003.

The plan on tariff adjustment was adopted and implemented in December 2003.

Within the framework of the privatisation process at CAMTEL, MINFI launched an invitation to submit an expression of interest on 25 January 2004 for consultants and renowned business banks in view of delivering the following services: (i) audit of CAMTEL financial statements, (ii) drawing up of a privatisation strategy, and (iii) implementation of the privatisation strategy adopted by the Government.

SNEC

As concerns the privatisation of SNEC:

-Negotiations with the provisional bidder “La Lyonnaise des Eaux” were not satisfactory and the invitation to tender was declared unsuccessful in September 2003.

A plan of action for the revival of the privatisation process was discussed and prepared by MTNMEE, CTPL, the provisional management of SNEC and the World Bank. This plan which runs from October 2003 and June 2005 includes 5 phases: (i) a preliminary phase for the validation of the option to be retained and SNEC audits, (ii) a phase for the validation of missions of the potential partner, (iii) a phase for the pre selection of partners and preparation of draft tender documents, (iv) a phase for the finalisation of tender documents and creation of a new public body (since SNEC is to be liquidated) and (v) a phase for the selection and establishment of the bidder retained.

The invitation to submit an expression of interest for the recruitment of a consultant in charge of supporting the process to revive SNEC privatisation was launched early in January 2004.
1.2 Pursue the implementation of the plan of action for the improvement of public expenditure management
Continuing the establishment of the SIGEFI systemEstablishment of interfaces; Regular production of summary tables on the execution of the State’s budget.2003MINFI

MINEPAT
All interfaces were prepared and are now functional.

The automatic table of indicators is under validation on the basis of data transmitted by the various sources of information
Improving the quality of public investment expenditureFormulation of quality of expenditure criteria: preparation of periodic reports on the physical and financial execution of the budgetPermanentMINEPAT
Ensuring the production of a full and reliable balance of the Treasury accountRegular preparation of reliable balancesPermanentMINFIBalances of the Treasury account are regularly produced.

Reliability and comprehensiveness of data are possible thanks to the local network at the treasury, and central and local committees for the use of the CADRE/DEPMI integrated SYSTEM
Rendering audits of public expenditure systematicMethodology and procedures of audits were determined and published;

Regular publication of audit reports
PermanentMINFI

MINEPAT
Systematic conduct of audits on the basis of a well defined and published methodology. Preparation works aimed at ensuring a regular publication of audit reports are on a good track.
Pursuing the preparation of an objective-based budgetObjective-based budget prepared and presented to MPs in the National AssemblyAs from 2005
Pursuing a prudent debt policy that allows for concessional loansLevel of concessionality of loans approved by the GovernmentPermanentMINFI

MINEPAT

CAA
Ongoing preparation of a circular that makes the CAA a compulsory agent for the examination of loan requests formulated by corporations.
Regular preparation of reports on the physical and financial execution of the budget of priority ministries in poverty reduction (Education, Health, Public works, Agriculture, Finance and the Budget, Economic Affairs, Mines, Power and Water Resources, Transport, Social Affairs, Justice and Women’s Affairs)Publication of quarterly reports on the physical and financial execution of the budget of the concerned ministriesPermanentSector ministriesThe Ministry of Agriculture prepared reports whose layout is still to be improved.



MINEDUC regularly prepares and forwards reports on the physical and financial execution of its budget to MINEPAT.



MINTP prepared monthly reports on the progress of road maintenance and investment projects, as well as bi annual reports on the balance sheet of activities carried out.



MINMEE prepared reports on the physical and financial execution of its budget for the 2nd and 3 rd quarters.



MINTRANS prepared the bi annual financial report on the execution of its public investment budget.



MINCOF prepared periodic statements of its budget but reports on the physical and periodic execution of the budget are not prepared.
Building institutional capacities of spending ministries in programming, monitoring and execution of operations and in the quality of public expenditureThe programme on institutional capacity building was drawn up and implemented; Organisation of budgetary conferences; Organisation of seminars and training sessions2003/05MINFI

MINEPAT
2004 budgets were prepared within the framework of budgetary conferences and after the conduct of regional seminars on the budget nomenclature.
Implementing Medium-Term Expenditure Frameworks (MTEF) within social ministries (education and health)Updated MTEF; Annual budgets prepared on the basis of MTEF2004MINFI

MINEPAT
MINEDUC and MINSANTE have their MTEF which are on a good track.
Completing the establishment of pillars of the reform on public contracts and satisfactory conduct of the reformAdoption of the Code on public contractsJune 2003SPM/ARMPThe reform on the award and control of the execution of contracts is on a good track:
  • Tender boards and specialized control tender boards are now functional;
  • Independent observers take part in sessions organised by these tender boards;
  • The ARMP is fully operational;
  • The Prime Mnister, Head of Government presided over an interministerial meeting on 29 April 2004 to revise the draft code on public contracts before forwarding to the Presidency of the Republic for the Head of State’s approval.
Functioning of tender boards and specialized control boards in conformity with the regulation in forcePermanentSPM/ARMPThe summary report on audits of public contracts for the 2000/2001 financial year (June/July) was adopted by the board of directors of the ARMP; it is now available for consultation. A consultant (Cabinet 2 AC/ACP) was recruited in April 2003 to audit public contracts for the period running from 1 July 2001 to 31 December 2002. The report was submitted in February 2004. The final report on the audit of contracts covering the 2001 and 2002 period, and the transitional period was submitted by the auditor and approved. The report was available since March 2004 and was forwarded to Resident Representations of the World Bank and the IMF on 26 and 27 April 2004.

The final report on the evaluation of the transitional phase of the reform was submitted by the consultant on 23 April 2004 and forwarded to Resident Representations of the World Bank and the IMF on 26 and 27 April 2004 respectively. A round table for discussions on this report and the above mentioned reports was scheduled on 13 and 14 May 2004.
Participation of independent observers recruited by way of competition in sessions organised by tender boardsPermanentSPM/ARMP31 independent observers were recruited for the period running from 1 November 2002 to 31 December 2003. They prepared 1900 reports.

A consultant was recruited to evaluate the transitional period; independent observers were recruited for the 2004 financial year. They took part in a training session organised on 13 April 2003. The independent auditor for the 2004 financial year is being recruited. The invitation to tender for this purpose was launched in 27 April 2004 and the procedure should end on 26 May 2004 at latest.
1.3 Pursue structural reforms
Completing the privatisation process of SNEC, CDC, and CAMTELClose of the privatisation of SNEC, CDC, and CAMTEL2003/05MINFIPlans of action were prepared with the support of the World Bank; execution has taken off.
Reducing time period at portProgress made in the reduction of time period at port2OO3/04MINTRANSMechanisms and actions in favour of the reduction of time period at port were put in place: FAL committee, committee for the reform of customs services, steering committee of the port reform, follow-up committee of the matrix of actions for the reduction of time period at port, green channel, unique check point, one-stop service.

Thanks to these actions, it was possible to: ensure an automatic custom targeting system, restructure and reduce the number of registered custom auditors, reduce the time period for the validation of cargo manifests, and rationalise technical controls.

For the first ten months of 2003, thanks to the progress made, port operations could last:

  • - from one and half to 2 and a half days for exports, depending on the type of good;
  • - 7 and half days for imports (depending on the harmonic average).




It should also be pointed out that this time period has considerably changed recently. As a matter of fact, it has moved from 25 and half days to almost 16 days between June and October 2003, which represents a steady decrease of close to 10 days for 4 successive months. Great efforts are thus made to attain a maximum of seven days for imports and two days for imports for the withdrawal of goods at the Douala port.
Additional measures are being taken, including permanent sensitisation of shippers, effective link between SYDONIA and GUCE, migration of PAGODE to SYDONIA and computerisation of the GUCE.
1.4 Mobilise non-petroleum domestic resources
Pursuing the second phase on the modernisation of the tax system; notably through the personal income revenueNew general code on the income tax prepared and published2003/04MINFIThe legislation was voted; and implementation is underway
Pursuing the implementation of the programme on the security of customs revenue; notably through the security and limitation of customs exemptionsReinforcement of the security; Publication of the restricted list of exemptions; Control of the observation of the list of exceptional exemptionsAs from 2003MINFIThe programme to secure customs revenue is implemented since 1995. It is being executed and consolidated by specific actions.

For the restricted list of exemptions, see act II CEMAC

Prudent application of conventional exemptions and limitation of exceptional exemptions
Core area 2: consolidation of growth through economic diversification
Measures/actionsFollow-up indicatorsPeriod of executionAssigned institutionLevel of executionObservations
2.1 Development of the rural sector
Improving farmers’ access to new and high yielding agricultural methods through the dissemination of research resultsIdentification of research results;

Extension and dissemination of research results;

Many farmer associations benefited from research results
PermanentMINAGRI

MINEPIA

MINEF

MINREST
Award of contracts to agricultural research services through a research funds on a competitive basis: 27 contracts with research teams are being executed

206 technical and economic fact sheets were put at the disposal of extension agents and producers at the end of training sessions organised for specialised technicians. These fact sheets are being consolidated per agricultural and ecologic zone.

A harmonised framework for the preparation of tests in a farmer environment was devised for the use of researchers and extension agents.

Support to the development of 6 sectors, including 5 for vegetables (maize, onion, Irish potato, plantain, and cassava) and 1 for animal production (milk, fish, fowl). To this end,

  • - 297 contracts were signed between producer associations and economic operators


Support to producer associations (equipment and infrastructure for the production, processing-socking, marketing and management of natural resources. To this end:

  • - 740 projects out of the 1300 projects approved received CFAF 700 694 046 worth of support in infrastructure and production equipment.


Promotion and development of private extension services:

  1. - 16 partnership and subcontracting conventions are being executed. These conventions concern 3 NGOs, 4 professional producer associations and 8 rural radios
  2. -44 rural communities were empowered in the area of follow-up and evaluation of extension activities.


13317 producer associations were backed in the execution of micro-projects and protective management of natural resources. More specifically, 143843 producers received direct support. 1795 hectares were developed, 102 micro infrastructure were constructed and 16 village planning officers received training. There was a significant increase in the output, as well as in quality and quantity of marketed products. So far, no study has been programmed to assess the impact of these actions. However, the first results are presented in the analysis section.
Promoting community developmentImplementation of PNDP and PADC programmesPermanentMINAGRI

MINEPIA

MINEF
PNDP

  • - Preparation of the programme is completed (basic documents are finalised: programme paper, manual of execution, manual of administrative and financial procedures, follow-up and evaluation manual);
  • - Reception of an advance sum of USD 1.3 million from the World Bank for the PPF preparation and a Japanese grant worth USD 713000;
  • - Institutional preparation and financial circuits defined;
  • - Budget for the first phase prepared;
  • - Financing plan and position of donor agencies specified;
  • - Feasibility study conducted by the World Bank in June 2003;
  • - National Coordination unit operational since April 2003;
  • - Process to set up the four provincial units almost completed;
  • - Pilot operations underway: 40 villages have been selected in 10 councils including 2 in the North province (Guider and Figuil), 3 in the South (Campo, Ma’an and Akom II), 3 in the West province (Koutaba, Foumban and Kouop Tamo) and 2 in the Centre Province (Akono and Meigang);
  • - 20 micro-projects submitted to the National Coordination Unit by rural communities and pilot councils in view of receiving financing;
  • - 11 micro projects for equipment and public infrastructure are pending financing and received the non objection of the World Bank for a global amount of roughly CFAF 60 million;
  • - Request for HIPC fund approved by the CCS/PPTE for a sum of CFAF 16 thousand million for 4 years.
Promoting community developmentImplementation of PNDP and PADC programmes.PermanentMINAGRI

MINEPIA

MINEF
PADC

Enforcement 25/05/2003;

Acquisition of equipment and logistics;

Loan funds available (end of August 2003);

Preparation of technical tools (manual of financial and accounting procedures, manual on the technical execution);

Preparation of methodological tools for village selection, village planning and selection of contractors;

3 pilot villages per province and the village development committee legalised and operational;

Participation in the determination of a ceiling budget for village planning (January 2004) activities;

Contacts with the ARMP in view of gathering specific instruments relating to community contracts owned by development committees (January 2004);

Award of contracts concerning the first lots of village for the implementation of the process on village planning (January 2004);

Supervision of negotiations with contractors selected at the end of restricted consultations (January 2004);

Supervision of the drafting of conventions and contracts (end of January 2004);

Negotiations between MINAGRI and MINEPAT in view of a potential increase of Government contribution to the project (end of January 2004);

Signature of conventions and contracts: for the Centre province early in February 2004 and Far North province in March 2004;

Discussion on the AIDS pandemic with FID A experts who should draw up a strategy in view of considering AIDS issues within the framework of projects and programmed financed by FIDA (end of March 2004);

Follow-up of the execution of village development plans in the 3 pilot villages of the Centre province (end of February-beginning of April). In the Far North province, emphasis was first laidon the building of capacities of pilot villages before initiating the execution of their development;

3 (three components):
  • - capacity building of village committees, councils support bodies and the concerned ministries as well as external services;
  • - support to income generating activities: counselling and training in micro enterprise management specific technical training, establishment of a rotating guarantee;
  • - micro infrastructure: potable water supply; health, education, building of community infrastructure, road infrastructure, development of basic seeds and seedlings and installation of solar energy.


Component “capacity building”

  • - Organisation of a national workshop to harmonise village planning approaches and methods (19 June-23 June 2003)
  • - Organisation of provincial training workshops on village planning (23 July 11 August 2003: which brought together 17 structures from the Centre province and 15 from the Far North which were selected by way of invitation to submit an expression of interest on a competitive basis; Provincial workshops to build the capacity of committees and councils (8-12 September for the Far North and 8-11 December in the Centre)
  • - Continued preparation of villages in view of village planning with the collaboration of PGP A and PAAR, two structures that were in charge of selecting pilot villages in the two provinces concerned; Award of contracts for the first lots of villages in view of the execution of the village planning process (January 2004);
  • - Negotiations with bidders selected for village planning whose bids were close to the ceiling projected (January 2004);
  • - Launching of the second tender documents for village planning only for villages that were not programmed at the end of results of previous tenders
  • - Drafting of conventions of a year duration between PADC and contractors for other capacity
  • - building activities and contracts for village planning (end of Jan. 2004)
  • - Opening and analysis of bids of the 2nd tender for village planning (end of January 2004)
A provisional ceiling cost was determined for village planning while waiting for the conduct of a study on the real costs of the project. This will be done in collaboration with the GTZ Current instruments relating to public contracts are not adapted to community contracts (guideline of execution observed by the PADC), reflection with ARMP. Village blocks that hadnon objection were revived following the same procedures on the restricted consultation. Mobilisation of FIDA funds somehow. depends on the counterpart funds. For micro infrastructure specifically, FIDA does not bear taxes which are the sole responsibility of the Government





These pilot villages had a non objection for the execution of income generating g activities and micro infrastructure.



Health: rehabilitation and construction of health centres;

Education:rehabilitation, construction and equipment of classrooms, development of playing grounds;

Community construction:rehabilitation and construction of warehouses, community houses and granaries;

Road infrastructure:permanent and punctual maintenance, construction of bridges.



6 development plans in pilot villages (Elessongué, Eyene and Nkol Awono in the Centre; Gabaraye, Kartowa and Vélé-Guémé in the Far North province)



There is a serious problem with village planning bids which vary from one structure to another. There is the need to determine a price lag to be submitted during the competition.
Promoting community developmentImplementation of PNDP and PADC programmes.PermanentMINAGRI

MINEPIA

MINEF
PADC

Component “capacitv buildins” (continued)

Meeting with bidders retained for village planning_(February 2004)

Consultation with bidders retained for village planning (February 2004)



Component «income generating activities »»(IGA)

- Selection of contractors in charge of the implementation of this component, including 22 in the Centre province and 9 in the Far North

- Organisation of workshops at the provincial level to harmonise tools, approaches and methodology (September 2003)

- Partnership convention with PPME, CECPROM Mature and the PCRD for the establishment and domiciliation of rotating guaranties, financing of IGA

- Finalisation of the process on the recruitment of contractors in charge of the support of pilot villages

- Monitoring IGA in the 3 pilot villages. A programme on the implementation of activities was drawn up between producer groups, the PADC and the contractor. Thus, after expressing the need for training, 6 sessions were organised from 10 to 30 March. These sessions which brought together 57 representatives of producer groups focused on technical methods for the cultivation of cassava, yam,, maize, groundnut and soya bean. Three plots are being prepared to test and ensure the effectiveness of these training sessions: a plot for maize at Elessogue, a plot for yam at Eyene and a plot for cassava at Nkol Awono (January-March 2004)

- Rotating guarantee: 2 partnership conventions were prepared and submitted for the signature of the Minister of State in charge of Agriculture: one of the conventions concerns the collaboration with the PPMF project and the other concerns the Decentralised Rural Credit project Moreover, arrangements were made with the CVECA of Nkol Awono for the signature of a convention in view of the domiciliation of their rotating guarantee account (March 2004).

- Data base: terms of reference for the execution of a reference benchmark of pilot villages were prepared The first phase of the study which concerns the typology of groupings is completed The next phase will concern the preparation of reference accounts for the exploitation of the main agricultural activities, processing and marketing (March 2004)



Component Socio-economic micro infrastructure »



Establishment of a collaboration platform with similar projects (PPDR Sa ‘a) and the technical ministries concerned (July 2003)

-Preparation of a directory of technical norms of infrastructure being constructed

Designing plans and estimates of the costs of infrastructure and technical specifications

- Finalisation of the process to recruit contractors for pilot villages on the good track

Non objection for the execution of infrastructure retained in the three pilot villages: EYENE, NKOL-AWONO, ELESSOGUE (January 2004)

- Preparation and signature of documents relating to the execution of micro projects: publication of results, notification letter, service order, convention, contract (Mid January-mid February 2004)

- Preparation of practical modalities for the execution phase:

Sensitisation and mobilisation of contribution of beneficiaries (10 %), - Preparation of operation sites (mid February mid March 2004)

- Effective take off of works: rehabilitation and equipment of classrooms, health centres at Nkol Awono (mid March 2004)

- Take off of the construction of Eyene community house

- Take off of the rehabilitation and equipment of the Elessogue library (from 15 April 2004)
Results of the invitation to tender were forwarded to UNOPS to request for non objection. Globally, there was a considerable improvement in the preparation of bids and a reduction in financial bids which are getting close to the financial ceiling set for village planning.



Capitalisation of PPDR experience in the following areas:
  • - Intervention approach in the construction of infrastructure
  • - harmonisation and preparation of certain documents
  • - establishment of a consultation framework


The 2004 plan of action allows for 50 villages instead of 100 per province due to budget limits, notably limits of the amount programmed for the counterpart fund



- All contributions from beneficiaries are available; operation sites have been prepared;

- rehabilitation works and equipment of the classroom are being completed

- The Construction of the health centre will take off while awaiting for the conclusion of negotiations with the Ministry of Health
Promoting and supporting the development of professional and inter professional associationsPreparation of a combined strategy for the promotion and development of farmer groups;



Number of groups given support
PermanentMINAGRI

MINEPIA

MINEF

MINAT
- Guiding principles set out in the Rural Sector Development Strategy Paper



- Combined strategy being completed



* The first results of the study conducted by the consultant on the feasibility of the programme on agricultural professional organisation (OPA) were not satisfactory. Thus, a task force made up of officials from MINAGRI, MINEPIA and the Chamber of Agriculture was designated to prepare a detailed programme by the end of April 2004. The programme will be financed by C2D.

* Nevertheless, the first study led to the following achievements:
  • 10 provincial workshops organised with the stakeholders and other ministries concerned;
  • 4 regional workshops organised;
  • creation of a pilot committee


* Drawing up of a certain number of projects to test the mechanism put in place within the framework of the sector strategy

  • Agricultural professionalism and institutional consolidation project (PARI): CFAF 1.7 thousand million under the French FSP for a 3 year period (take off: June 2004)
  • Pilot project to support producer organisations (PPAOP) under Japanese grant administered by the World Bank: CFAF 900 million for a 2 year period (take off: 4thquarter 2004)
  • Existence of specific projects on the development of sectors that have components on the support of farmer associations (PNVRA, PPD, HIPC: fight against major pests that affect plants and crops: cocoa, coffee, plantain palm oil…)
  • The Programme to support the structuring of professional agriculture in Cameroon (PASPA) under C2D financing is being prepared; implementation projected after attainment of the completion point for HIPC initiative;
  • Projects geared specifically towards the support to rural organisations:40 000 rural organisations, all categories including the 25 000 that are not registered;
  • Projects for the development of branches that have a component on the support of producer organisations (PO): 25000 PO including 10000 that are not registered
  • Permanent support actions by traditional services: 1000 PO including 500 non registered




Total: 66 000 PO including 35 000 non registered
Promoting and supporting the development of professional and inter professional associationsPreparation of a combined strategy for the promotion and development of farmer groups;



Number of groups given support
PermanentMINAGRI

MINEPIA

MINEF

MINAT
- Guiding principles set out in the Rural Sector Development Strategy Paper

- Combined strategy being completed



* The first results of the study conducted by the consultant on the feasibility of the programme on agricultural professional organisation (OPA) were not satisfactory. Thus, a task force made up of officials from MINAGRI, MINEPIA and the Chamber of Agriculture was designated to prepare a detailed programme by the end of April 2004. The programme will be financed by C2D.

* Nevertheless, the first study led to the following achievements:
  • 10 provincial workshops organised with the stakeholders and other ministries concerned;
  • 4 regional workshops organised;
  • creation of a pilot committee




*Drawing up of a certain number of projects to test the mechanism put in place within the framework of the sector strategy

  • Agricultural professionalism and institutional consolidation project (PARI): CFAF 1.7 thousand million under the French FSP for a 3 year period (take off: June 2004)
  • Pilot project to support producer organisations (PPAOP) under Japanese grant administered by the World Bank: CFAF 900 million for a 2 year period (take off: 4thquarter 2004)
  • Existence of specific projects on the development of sectors that have components on the support of farmer associations (PNVRA, PPD, HIPC: fight against major pests that affect plants and crops: cocoa, coffee, plantain palm oil…)
  • The Programme to support the structuring of professional agriculture in Cameroon (PASPA) under C2D financing is being prepared; implementation projected after attainment of the completion point for HIPC initiative;
  • Projects geared specifically towards the support to rural organisations:40 000 rural organisations, all categories including the 25 000 that are not registered;
  • Projects for the development of branches that have a component on the support of producer organisations (PO): 25000 PO including 10000 that are not registered
  • Permanent support actions by traditional services: 1000 PO including 500 non registered


Total: 66 000 PO including 35 000 non registered
Launching specific priority support programmes for the development and organisation of priorityTake off of the implementation of specific programmes2003MINAGRITuber and root branches:



National Programme for the Development of Roots and Tubers (PNDRT) financed by FIDA from 2004 to 2011



Among the outcomes expected from this programme: 20 % of the 600 000 households currently involved in the project, representing 120 000 households will adopt the recommendations and the income derived in one way or the other will double in the long term.



Actions completed:



- Steering committee set up (30/06/2003)

- Unit in charge of the management of the project set up (30/06/2003)

- Loan agreement signed on 23July 2003

- Consultation committee set up (04/09/2003)

- Regional branches set up (04/09/2003)

- counterpart account opened (11/09/2003)

- Special account opened (23/10/2003)

- MINER AT legal opinion on the loan agreement (26/9/2003)

- Partial selection of personnel

- Provision of premises



Actions underway:

- Preparation of the manual on administrative and financial procedures

- Selection of personnel (underway)

- Preparation of the draft manual of technical operations

- Preparation of the programme of activities and annual budget (PTBA)

- Negotiations for the provision of counterpart funds which will trigger the enforcement of the loan agreement

- the workshop to launch activities is being prepared and it is scheduled as soon as the loan agreement is enforced

A project to develop Irish potatoes is being examined in view of HIPC financing
Among the outcomes expected from this programme: 20 % of the 600 000 households currently involved in the project, representing 120 000 households will adopt the recommendations and the income derived in one way or the other will double in the long term.









Total cost of the project: CFAF 9.17 thousand million.
Cocoa and coffee branches





Project: support to the protection of cocoa and coffee orchards, under HIPC



Actions completed:



- Identification of support (PO) in six provinces

- Identification of contractors and award of zones

- Inventory of control material in 6 provinces

- Inventory of needs in terms of material and pesticides in 6 provinces

- Acquisition of pesticides and vehicles

- Selection of contractors in view of the execution of information and sensitisation activities, as well as structuring, training of producers and reference situation of farms

- Preparation of specifications between beneficiaries, contractors and the Ministry of Agriculture

- Training of rural phytosanitary brigades in the Centre and North-West provinces

- Follow-up of rural phytosanitary brigades in the Centre and North-West provinces



Actions underway



- Identification of beneficiaries of support in the East province

- Identification of phytosanitary personnel for training

- Acquisition of phytosanitary equipment

- Signing of contracts

- Signing of specifications

- Official launching of the programme

- Distribution of pesticides to selected PO

- Phytosanitary control



Identification of revival and development support actions



Actions completed:

- consultation between the Government and private operators



Actions underway:

- Setting up of an ad hoc committee Government-private operators in view of finalising the revival programme

- Drafting of proceedings of the consultation
  • Difficulties in disbursing funds earmarked for sensitisation, information and structuring activities for PO
  • Delivery of atomiser still awaited
  • Training pre financed by contractors to reduce delays in the disbursement of funds




2003 budset

Package allocated: CFAF 867 000 000

Amount committed: CFAF 658 800 058

Amount disbursed: CFAF 603 020 862
Rice branch:



Project: revival of rice culture in the Logone Valley, HIPC financing



Actions completed:



- Identification of beneficiaries of the support in the 4 districts concerned (Yagoua, Maga, Kakai, Vele)

- Acquisition of motor pumps and vehicles

- Signing of contracts with contractors for the execution of activities related to the information and sensitisation, structuring and training of producers, provision of funds for the acquisition of inputs and support fund for the marketing of products

- Signing of specifications between beneficiaries, contractors and the Ministry of Agriculture

- Official launching of the programme on 22 May 2003 in Maroua

- Renovation of the Vounaloum training centre

- Preparation of mechanisms for the constitution of a working capital for the support of marketing and acquisition of inputs



Actions underway:

- Information and sensitisation of producers

- Structuring of farmers and training of producers

- Other actions in favour of the revival of rice culture are underway in the North-West, West, East and North provinces.
Palm oil branch



Project “Development of small-scale palm fields”, financed under HIPC resources



Actions completed:



- Signing of the general collaboration agreement between the Ministry of Agriculture and the Union of Cameroon Palm Oil Producers (UNEXPALM) on 22 May 2003

- Award of contracts for the acquisition of vehicles

- Preparation of tender documents for the acquisition of seedlings and transmission to the special tender board of the Prime Minister’s office

- Official launching of the project since January 2004



Actions underway:



- Sensitisation and selection of producers

- Extension of UNIPALM network to different branches

- Preparation of follow-up mechanisms

At the provincial level:

In the Centre province, 2.055 farmers received 180.000 palm oil seedlings
Two branches of UNEXPALM have been set up
Plantain



Project revival of plantain culture, under HIPC financing



Actions completed:

- Identification of beneficiaries of the support in 7 provinces

- Preparation of forms for the selection of producers

- Identification of plantain species per agro-ecologic zone

- Award of contracts for the acquisition of vehicles

- Invitation to submit an expression of interest for the production of seedlings

- Preparation of a shortlist of contractors for the execution of activities related to the production of seedlings

- Preparation of an agreement between CARBAP and the IITA, as well as a model of convention with nurserymen

- Official launching of the project on 19 June 2003 in Ebolowa and appointment of officials in charge of the programme

- Preparation of terms of reference for the media plan

- Establishment of a management software and a computerised system for the follow-up and evaluation of the programme

- Provincial committees for technical orientation

- Divisional committees for the selection of producers



Actions underway:

- Award of contracts for the acquisition of pesticides and nematicides

- Invitation to submit an expression of interest for the reference study

- Signing of a research convention

- Signing of convention with nurserymen

-An economic programme for the restructuring of the plantain branch (component production) is being formulated in collaboration with MINDIC
Horticulture and gardening:



Project to develop basic seeds and seedlings, financed under HIPC



Actions completed:



- Short listing of NGOs and consultants in view of the establishment of a data base in 8 provinces

- Award of contracts for the acquisition of irrigation equipment and vehicles

- Information of contractors by an invitation to submit an expression of interest and MINAGRI’s external services by a circular letter to the attention of provincial and divisional delegates

- Preparation of conventions, contracts and specifications between beneficiaries, contractors and MINAGI

- Missions for the preparation of the official launching of the project



Actions underway:



- Short listing in the remaining provinces

- Award of contracts for the conduct of the reference study

- Award of contracts for the conduct of the audit and control

- Short listing of contractors in the Adamawa and the North provinces

- Signing of conventions with NGOs and consultants for the execution of development activities

- Identification and selection of beneficiaries

- Official launching as soon as funds are available





Studies are underway to determine agricultural potentials of the East Adamawa and Far North provinces in terms of fruits and vegetable production.
Maize:

Actions completed:

- consultation among the major stakeholders in the sector for the finalisation of the programme

- Programme to revive the project was declared eligible for HIPC financing



Tobacco

- project “support to tobacco culture in the East province”



Cucumber: project “development of cucumber” declared eligible for HIPC financing
Take off projected for July 2004 following a special ordinance by the Prime Minister (June 2004 )
Pineapple

Conventions signed in the Centre and Littoral provinces. Selection of candidates completed and resumption of service at CETAC (Club for Technical Supervision of Pineapple in the Centre) and at CETAL (Club for Technical Supervision of Pineapple in the Littoral)
Preparing and executing the rural water supply master planPreparation and publication of the rural water supply master plan2004MINAGRIActions completed:



Discussions between MINAGRI, MINMEE and MINEPIA led to the identification of components of rural water supply: agricultural water supply (MINAGRI), rural water supply (MINMEE), pastoral water supply (MINEPIA). Secondary components were also identified: river and fish culture

Estimate cost for the preparation of the rural water supply master plan (PDHR) stood at CFAF 300 million. The PDHR will lead to programmes which will be implemented for about 50 years.

The 2004 PIB allows for 20 million for the financing of the study in view of the preparation of the agricultural master plan (PDHA). The financing concerns the diagnosis phase of this study.



Actions underway:

An invitation to tender is currently being prepared for the conduct of a study on the preparation of the agricultural water supply master plan (PDHA). It will pave the way for the preparation of the rural water supply master scheme with the involvement of the two other ministries concerned.

Consultations are revived to combine all the components of rural water supply. They will require additional resources that can be provided by the budget line “Studies of HIPC funds” or by MINEPAT.
Rendering the Forestry/environment sector programme operational (PSFE)Implementation of the (PSFE) programme2003MINEFThe paper was validated in June 2003

The follow-up and implementation committee (COMREM) was set up by Decision N°0037/D/MINEF/SG of 19 June 2003 by the Minister of Forestry and the Environment. The committee is chaired by the Secretary General of MINEF.

Members of this committee were appointed and commissioned

The committee has prepared a plan on the institutional reform of MINEF; the programme is under validation.

The study of the socio economic impact of the PSFE was conducted but it is still to be validated. The methodology was presented and the medium term evaluation was conducted.

A socio environmental study was conducted and examined by the environmental interministerial committee.

Terms of reference of the complementary institutional review of the PSFE on the grey environment were prepared and the study is completed.

A socio-environmental study was conducted, results examined and adopted by the environmental interministerial committee.
The next evaluation mission of the PSFE programme is scheduled for April 2004; the mission will set the amount of contributions of donor agencies
Enforcing instruments relating to community forestsInstrument adopted, published and implemented2003-2004MINEF1-Instruments on the pre-emption right:
  • Decision adopted, signed and published in December 2001
  • En for cement since February 2001
  • Rural communities exerted their pre-emption right over 82 forests
2- Revision of the manual procedures for award and for management norms of community forests:
  • First version published in January 2003;
  • Several workshops held to improve on this version
  • The process to adopt the final version was initiated in December 2003 and the manual was adopted
3- Decision relating to modalities for controlled exploitation within the framework of the implementation of streamlined plans of community forest management:
  • Decision adopted, signed and published
  • Effective implementation after signature
4- Management framework established: coordinator was designated, the committee has been set up and equipment purchased
Finalising and implementing the instrument relating to the equalisation fundInstrument finalised, published and implemented2003-2004MINEF

MINAT

MINFI
Ongoing study for the establishment of the equalisation fundThe draft decree prepared is being examined by the relevant ministries
Regulating the exploitation of non -timber forest productsInstrument published and disseminated.2003-2004MINEFA convention was signed to this effect between MINEF and FAO

The coordinator of the project has been designated

The coordinator has 18 months to submit the instruments for adoption
The coordinator has 18 months to submit the instruments for adoption
Improving fishery productivity with the introduction of new restocking fishesNumber of restocking fishes introduced2003-2005MINEPIARural extension of the “oreochromis niloticus tilapaia” of the Sanaga

-Negotiations with the FAO for a TCP on the formulation of a strategy for the development of a sustainable aquaculture in Cameroon

-Missions are conducted in the field within the framework of the TCP relating to the revision of the legal framework for fishery and aquaculture
2.2- Development of the industrial sector
Finalising the industrial development strategyFinalisation and publication of the strategy2003MINDICThe sector strategy paper was worked out during the seminar organised in Bamenda from 10 to 12 December 2003 and forwarded to MINEPAT.
Conducting a reference study on the industrial sector in view of identifying and selecting sectors with growth potentialsPublication of the report on the study; Identification of sectors with growth potentials2004MINDICThe following sectors were identified: Textile, Timber, Energy and Hydrocarbons, sectors undergoing changes (plantain, maize, oleaginous plants), configuration sectors (cocoa, coffee, rubber), high technology sectors (shipbuilding, ICT, pharmaceuticals). As concerns textile, a strategic audit was conducted in the structures of CICAM. The related report was approved by the Prime Minister, Head of Government. Some of the actions recommended in the short term in the report are being carried out (sensitisation campaigns against fraud, counterfeiting and smuggling, and creation of a Special Control Brigade). As concerns the other sectors, the formulation of terms of reference is hampered by unavailability of financial resources.
Elaborating a specific policy for the promotion of local sub contractingPublication of a policy paper on sub contracting promotion2004-2005MINDICThe Chamber of Commerce, Industry, Mines and Handicraft launched a study on the potentials of industrial sub contracting in Cameroon in May 2004.A committee created by MINDIC will be set up to finalised the policy paper for the promotion of sub contracting. The committee will comprise CCIMA, GICAM, SYND USTRICAM, and FENAP. The sub contracting stock exchange will be created in Douala in 2005 under the auspices of CCIMA.
Establishing consultation mechanisms between research institutions, universities, vocational schools and enterprises in view of developing research results- Establishment of consultation mechanisms between research institutes, universities, professional schools and enterprises in view of developing research results;

- Use of research results by Cameroonian enterprises.
2004-2005MINDIC

MINETFOP

MINESUP
- Combined preparation of the cartography of technical and professional branches and a project on the professionalism of teaching programmes with MINESUP (validation by April 2004);

- Evaluation of the compatibility between training in technical secondary and higher schools and jobs offered by the various business persons operating in Cameroon: Survey “2000 generation” of2000 graduates of MINETFOP and MINESUP working in enterprises and in the informal sector (Terms of reference and tools available, survey underway, report validated in 2004 at latest;

- Partnership framework MINDIC/MINETFOP to be determined;

- Participation at meetings and mixed commissions with foreign economic operators (French cooperation, India, Tunisia, Turkey, TICAD, NEPAD, Canada, … )

Publication of proceedings of University Forum on Science and Technology (JUST) that brought together the Government, Universities, the private sector and foreign partners and which held in 2003; preparation of the next forum scheduled for February 2005;

-Existence of board of directors within institutes of technology; universities and the private sector are also involved in view of searching relevant programmes and identifying new branches: a draft instrument relating to the organisation of these boards has been forwarded to the Prime Minister’s office:

- process to identify research projects underway; it aimed at taking stock of problems encountered by enterprises and at seeking appropriate solutions;

- Creation of interface centres with the industrial world in Technology Institutes and engineering schools with the collaboration of France (COMETES project);

- Ongoing finalisation of proceedings of the seminar on the construction management with experts from both the public and private sectors;

- Institution of a training programme on Research and Development. Effective award of scholarships by the Brasseries du Cameroun (Cameroon brewery).

A project to develop medicinal plants is underway within the framework of the Cameroon-Chinese partnership Effective intervention of university researchers in ICT in national enterprises (software, software package, computer equipment)
- Ongoing consultation for the institution of doctoral schools



- Finalisation of MINESUP-MINREST joined invitation to submit a candidature within the framework of research projects on development



- Finalisation of MINESUP-SABC joined invitation to submit a candidature within the framework of development research programmes
Implementing the industrialisation plan of the timber branchImplementation of the industrialisation plan.from 2003MINDICAction to be carried out within the framework of the Investment Charter (Preparation of sector codes)
Promoting the creation of services of information and communication technologiesPreparation and implementation of a common strategyfrom 2003MINDIC
Promoting the creation of enterprises for 2nd and 3rd processing of timber sectorPreparation and implementation of a common strategy for the creation of enterprises; Incentives for the creation of enterprises in the sectorFrom 2003MINDICAction to be carried out within the framework of implementation of the Investment Charter and preparation of sector codes, notably the code on the industrialisation of the timber branch
Promoting the standardisation and quality controlPublication and enforcement of instruments relating to standardisation Number of norms adopted; mechanisms for the control of norms prepared, and control agents trained and equipped2003-2004MINDICProject is being finalised

- 250 national norms were prepared with 6 of them being compulsory. 34 enterprises were given a certification of conformity to these norms. 13 enterprises were certified on the basis of the system applied by foreign bodies given the conformity of their products to international standards. National enterprises are sensitised on the stakes of quality on a permanent basis. To this effect a national week on quality is organised by MINDIC on a yearly basis. Activities to control the respect of norms focused on two products, namely sheet metals and milk.

- Application of the norm on wheat flour led to the decrease in imports of this product: as a matter of fact it helped to save about CFAF 6 thousand million per year and create 7 new flour-mills and generate 600 new jobs. Cameroon has thus moved from the status of gross importer of flour to that of producer, then exporter of this product.

- Revision of the norm on cooking gas bottles, which aligned this product to the international norm helped reduce speculations on this product which led to constant shortages.

- Locally manufactured sheet metals were withdrawn from the market and sold in regional markets because they do not confirm to the international norm. Similarly, 15,000 imported sheet metals were withdrawn from the market Sanctions were meted on incriminated enterprises according to the law. Like for wheat flour, sheet metals are no longer imported by Cameroon since 2003 which led to an additional increase in currency.

- Lastly, 8 brands of milk were withdrawn from the market as a result of the application of the norm.
Preparation and implementation of a combined strategy for the promotion of SMEs/SMIs2003-2005MINDICA reference document was prepared by a consultant in 2003 (cost: 15 million). The study for this purpose is not yet completed due to lack of financing.
2.3- Development of tourism, cultural and support services to the production sector
Promotion of the tourist sector and cultural services
Finalising the tourist sector strategyFinalisation, publication, dissemination and implementation of a common strategy for the development of tourism; Incentives to the creation of tourist enterprises identified and implemented2003MINTOUR-Draft document available; finalisation underway
Organising sensitisation seminars on the insertion of young graduates in tourism jobsOrganisation of sensitisation seminars in provinces2003-2005MINTOUR14 university lecturers received training in the teaching of tourism in vocational schools within the framework of the programme on the tourist culture
Standardising tourism establishments and agenciesNumber of tourism establishments and agencies normalised2004-2005MINTOUR
Making an inventory of cultural heritage (fixed and movable assets)Publication of a detailed report on the inventory.2003-2004MINCULTThe inventory process took off in 2001 /2002 in the Fang Beti and Grassfields cultural areas; the following actors were sensitised: institutional and non institutional partners, administrative and municipal authorities, religious leaders, traditional rulers, artists and men of culture. The first lot of equipment was purchased (4*4 vehicles (3), video cameras, video recorders and accessories); then the first survey agents were recruited, followed by the organisation of training workshops and data collection.

The process to secure data took off in 2003. An international training seminar on the inventory of the cultural heritage was organised from 30 July to 25 July in Bafoussam. Participants were drawn from UNESCO, ICCROM, CRATER -AEG and from 17 French-speaking countries south of the Sahara
Drawing up and implementing a strategy for the development of film and video productionDrawing up and implementation of a common strategy for the development of film production2003-2004MINCULT MINCOMWhile awaiting for the drawing up and implementation of this common strategy, MINCULT contributed to the development of film production through:

Support to the training of young producers;

Support to film creation by providing financial support for movie production thanks to the special account earmarked for the cultural policy (CFAF 37 million)

Implementation of co-production agreements with friendly countries such as France
Creating the National MuseumMuseum created and equipped2003-2005MINCULT MINTOUR UNESCORehabilitation of the front side and the exposition room located in the first floor (main block) completed Launching of an invitation to tender for the continuation of works concerning: rehabilitation of the basement, upperfloor, backside, adjoined gardens, laboratory for the treatment and rehabilitation of works of art. The invitation to tender also concerned the rehabilitation of the fence, installation of a security system and acquisition of a generator.

About a hundred of pieces were acquired thanks to the initial fund earmarked for these works of art.
Creating a National Institute of Arts and CultureNational Institute of Arts and Culture has been created and is now operational2003-2005MINCULT MINEDUC UNESCOThe project is still to take off
Promotion of finance intermadiation
Rendering the Cameroon finance market operational (Douala Stock Exchange)Effective operationalisation of the Douala Stock Exchange2003MINFIAll the technical components are ready. Two banks have been registered as intermediary service providers (PSI); approval of the 3rd bank is underway.

Quotations tools have been put in place: take off bonds have been identified (Government and private bonds earmarked for the public within the framework of privatisation)
Making an inventory of cultural heritage (fixed and movable assets)Publication of a detailed report on the inventory.2003-2004MINCULTThe inventory process took off in 2001 /2002 in the Fang Beti and Grassfields cultural areas; the following actors were sensitised: institutional and non institutional partners, administrative and municipal authorities, religious leaders, traditional rulers, artists and men of culture. The first lot of equipment was purchased (4*4 vehicles (3), video cameras, video recorders and accessories); then the first survey agents were recruited, followed by the organisation of training workshops and data collection.

The process to secure data took off in 2003. An international training seminar on the inventory of the cultural heritage was organised from 30 July to 25 July in Bafoussam. Participants were drawn from UNESCO, ICCROM, CPA TER -AEG and from 17 French-speaking countries south of the Sahara.
Drawing up and implementing a strategy for the development of film and video productionDrawing up and implementation of a common strategy for the development of film production2003-2004MINCULT

MINCOM
While awaiting for the drawing up and implementation of this common strategy, MINCULT contributed to the development of film production through: Support to the training of young producers;

Support to film creation by providing financial support for movie production thanks to the special account earmarked for the cultural policy (CFAF 37 million)

Implementation of co-production agreements with friendly countries such as France
Creating the National MuseumMuseum created and equipped2003-2005MINCULT

MINTOUR

UNESCO
Rehabilitation of the front side and the exposition room located in the first floor (main block) completed Launching of an invitation to tender for the continuation of works concerning: rehabilitation of the basement, upperfloor, backside, adjoined gardens, laboratory for the treatment and rehabilitation of works of art. The invitation to tender also concerned the rehabilitation of the fence, installation of a security system and acquisition of a generator.

About a hundred of pieces were acquired thanks to the initial fund earmarked for these works of art.
Creating a National Institute of Arts and CultureNational Institute of Arts and Culture has been created and is now operational2003-2005MINCULT

MINEDUC

UNESCO
The project is still to take off
Promotion of finance intermadiation
Rendering the Cameroon finance market operational (Douala Stock Exchange)Effective operationalisation of the Douala Stock Exchange2003MINFIAll the technical components are ready. Two banks have been registered as intermediary service providers (PSI); approval of the 3rd bank is underway.

Quotations tools have been put in place: take off bonds have been identified (Government and private bonds earmarked for the public within the framework of privatisation)
Pursuing the restructuring of savings and credit cooperatives (COOPEC)Existing COOPEC abide by the regulation in forceFrom 2003MINFI PPMF COBACMeasures are taken to ensure the respect of the regulation; an inventory and evaluation mission is programmed to take stock of the progress made
Promoting relations between MFI and commercial banks in order to provide them with micro credits for the funding of their activitiesDrawing up and implementing a common strategy for the promotion of relations between MFI and commercial banks2003-2005MINFI

MINAGRI
Taking measures in view of consolidating the national banking coverageDrawing up and implementation of a common strategy for the development of the banking system.2003-2005MINFI,

APECCAM
Promoting the development of financing structures and mechanisms suitable for the rural sectorDrawing up and implementing a common strategy for the development of financing structures and mechanisms suitable for the rural sector;



Incentive measures for the development of financing structures and mechanisms identified and implemented
2003-2005MINAGRIStudy of the financing policy of the agro-pastoral sector (structures and financing) conducted by BERET consultancy in September 2001.

The study was examined by the Economic and financial Committee of the National Credit Council on 5 March 2003 and a restricted committee made up of representatives of MINAGRI, MINEPIA, the Chamber of Commerce, MINFIB and the National Credit Committee was set up to revise the proposed study.



Validation of the final report on 28 March 2003 which recommended the preparation of a project to finance agriculture. The project has a lifespan of 8 years and it will be located at BEAC.



Mesures identified:
  • - A regime of tax and customs duty relief
  • - Establishment of a task force within the structures in view of following-up and supervising beneficiaries of credit
  • - Establishment of an agro-pastoral insurance structure
  • - Tax exemption for agro-pastoral inputs
  • - Tax exemption for agricultural pastoral and fishery equipment
  • - Subsidisation of interest to be renewed
The project will be examined in the upcoming sessions of the National Credit Council
Promoting decentralised finance systemsDrawing up and implementing a common strategy for the development of suitable financing structures and mechanisms;



Incentive measures for the development of financing structures and mechanisms identified and implemented
2003-2005MINAGRI

MINFI
- Micro finance policy letter prepared

- Implementation of MINAGRI specifications within the framework of the PPMF (national micro finance programme) project

- Professionalism and consolidation of MFI networks in rural areas (MINAGRI/MIFED Convention for P CRD) Financing the extension of networks to rural areas that do not have MFI (PCRD and MC2 financed under HIPC fund)

- Registration of COOPEC before approval by MINFIB and COBAC

- National micro finance committee set up and commissioned



Implementation of phase III of the Decentralised Rural Credit Project (CFAF 3 721 700 000 for 5 years) financed under HIPC and FIDA (PPMF)

Implementation of phase III of the Decentralised Rural Credit

(CFAF 372 700 000for 5 years) financed under HIPC and FIDA (PPMF)

Actions completed:

- Signing of a general collaboration convention between MINAGRI and the Micro Finance Association

- Acquisition of vehicles

- Disbursement of the first instalment for activities programmed during the first semester of2004

- Signing of contracts with operators in the field

- Validation of the internal manual of procedures

- Capacity building of senior staff

Onsoins actions:

- Award of contracts for acquisition of safes

- Official launching of the project as soon as funds are available

- Opening of new accounts

Launching of studies on extensions

Implementing FIMAC new axes

« Consolidating the financing of rural micro projects »
  • Gradual withdrawal of FIMAC from the process on the management of the Rural Development Fund which is made up of first generation credits
  • Preparing FIMAC to become a counselling and support structure to rural credit
  • Promotion of finance intermediation


Actions completed

- Collection of a sum of CFAF 1 030 145 665 out of the CFAF 1 508 974 956 expected as first generation credits, representing a sum of CFAF 79 240 704for the 2003financial year

- Signing of 155 contracts to align MFI for the management of the Rural Development Fund thus constituted, with CFAF 591 056 576 already transferred;CFAF 297 356818 are awaiting transfer since 31 December 2003

- Contracts MFI granted a sum of CFAF 300 022 033 representing 2nd generation credit to 843 groups in the ten provinces

- Studies to secure funds allocated by SOWEDA and MIDENO, terms of reference prepared

- Launching of sensitisation campaigns to collect first generation credits in the South, Littoral East and Centre provinces.

Ongoing actions

- Continuation of the sensitisation campaign for the collection of first generation credits and take off of the implementation of FIMAC new axes in the Littoral South, East and Centre provinces.

- Replenishment of first generation credits as they reach maturity and collection of outstanding loans

- Aligning groups that are not yet linked to MFI, 120 in all in the Adamawa and East provinces

- Negotiations of 5 new contracts for alignment

- Monitoring the management of 2nd generation credits

- Organisation of a workshop that brought together 10 provincial boards for sensitisation on the collection and for the strategy on the implementation of new axes

- Negotiations in view of consolidating the Rural Fund with HIPC
FIMAC achievements (Investment Fund for micro agricultural and community projects)

- 2900 groups aligned

- Staff network tested in rural financing

- Network of 160 contract finance intermediates

- CFAF 900 million available for the Rural Development Fund



Constraints

- collection of first generation credits:

Breaking up of some groups

- Collection of 2nd generation credits:

High rate of outstanding payments due to lack of follow-up of MFI by field technicians, lack of experience of several contract MFI

- Transfer of the Rural Fund to MFI: liquidation of some partner MFI, misappropriation of part of the funds collected, death of some heads of signatory groups

- Low use of Rural Funds due to the management policy implemented by some MFI and difficulties encountered by groups made up of women and/or young actors to present certain guarantees
Promoting the mobilisation of savingsDrawing up and implementing a common strategy for the mobilisation of savings; Incentive measures for the mobilisation of savings identified and implemented2003-2005MINAGRI

MINFI
Support project to the development of micro banks MC2 finalised and implemented as soon as 2004 (CFAF3814544650 running until 2008) financed under HIPC and FIDA (PPMF)

Measures identified:
  • - Bringing village-level funds closer to the rural population
  • - Capacity building in autonomous management of funds
  • - Provision of safes
Core area n°3: Boosting the private sector
Measures/actionsFollow-up indicatorsPeriod of

execution
Assigned

institution
Level of executionObservations
Pursuing the fight against dumping and smugglingMeasures against dumping and smuggling identified and implemented;

Control agents trained and equipped
PermanentMINDIC

MINFI
Measures relating to the control of price and legality are conducted on a permanent basis by the control brigade, in collaboration with customs services. Actions carried out concern mainly 3 products: textile, cement and sugar which are seriously affected by the dumping and smuggling phenomenon. As concerns textiles specifically, this action has been prescribed among the short-term measures recommended in the report on the strategic audit conducted at CICAM. A special mixed control Brigade was set up within the Prime Minister’s Office. The Minster of State in charge of Industrial and Commercial Development launched a sensitisation campaign on the negative effects of dumping and fraud The campaign was extended to the 10 provinces of the country. Campaigns are regularly conducted to check measures.
Major infrastructure works supporting the private sector (bridge over the Wouri river, Douala and Yaounde highways, highway roads linking bordersIdentification of project in collaboration with the private sector;

Mobilisation of resources and execution of works.
From 2003MINDICWhile waiting for the completion of the project on the construction of a second bridge over the Wouri river, the Government launched rehabilitation works on the old bridgeMINTP, MINVILLE and the Douala and Yaounde city councils will constitute a task force made up of professionals of the private sector in view of identifying industrial infrastructure.
Encouraging the creation of maintenance and shipbuilding enterprisesDrawing up and implementing a common strategy for the creation of maintenance and shipbuilding enterprises; Incentive measures to the creation of concerned enterprises identified and implemented.From 2003MINDIC(i). Following the take-over of the UIC company, the Cameroon Shipyard and Industrial Engineering Limited has become the focal point for shipbuilding and petroleum platforms in Sub-Saharan Africa. The increase in activities is at the origin of the transfer of a great part of its facilities to Limbe with a view to taking advantage of the draught of water;

(ii) Syndustricam signed a protocol agreement with a group based in the Rhone Alpes Region in France. The group is specialised in metallic industry. The agreement aims at ensuring the development of industrial maintenance;

(iii) A draft convention was prepared in view of establishing a programme for the maintenance of the railway sector. The programme dubbed HY-RAIL involves the Cameroon Railways (CAMRAIL) and a Canadian firm. The structure in charge of the execution of this programme has already been set up.
Promoting the industry of generic drugs and manufacture of agricultural materialsDrawing up and implementation of a common strategy for the promotion of the industry of generic drugs and manufacture of agricultural materials; Incentive measures identified and implemented.From 2003MINDIC-Negotiations with MINSANTE;

-Preparation of a forum on the potential creation of a firm for the manufacturing of pharmaceutics in Cameroon with the support of the AIPO;

-construction of a firm for the manufacture of agricultural materials in Kribi within the framework of the Chinese cooperation;

-Negotiations are underway with Canadian firms for the manufacturing of drugs. A forum between Canada and Cameroon is under preparation.
-What remains to be done is to adapt the machines manufactured in Kribi to the ecological conditions of the milieu;

-Incentive measures will be identified within the framework of the implementation of the Investment Charter;

-Lack of financial resources delays the rapid progress of the project
Executing a programme on nursery of enterprises in the sub sectors of SMEs and SMIs and handicraftDrawing up and implementing a programme on the nursery of enterprisesFrom 2003MINDICAt the end of the complementary study conducted after preliminary studies that helped to identify the needs and opportunities, UNIDO made the proposal to launch the first phase of the creation of nursery of enterprises in Yaounde and Douala.

A paper on the project« nursery of enterprise initiative »for the Littoral and Centre provinces was prepared and submitted for HIPC financing in April 2004.
Putting in place mechanisms and structures projected in the Investment Charter, namely the Regulation and Competitiveness Board, the Investment and Export Promotion Agency, the Industry and Trade ObservatoryEffective establishment of structures projected by the Investment Charter2004MINDICDraft instruments regulating the organisation and functioning of the Regulation and Competitiveness Board and the Investment Promotion Agency have already been forwarded to the Presidency of the Republic.



The Decree to regulate the organisation of the Industrial Partnership Council was signed by the Prime Minister, Head of Government. What is awaited now is the confirmation of the composition of this structure.
Reinforcing the involvement of the private sector (i) drawing up and implementing technical and vocational training programmes, (ii) developing applied research programmes, (iii) financing programmes on the popularisation of computer sciencesSigning of partnership conventions between the private sector and training and research institutions2003-2004MINDICThe signing of partnership conventions will come as a result of consultation meetings held in 2004, in conjunction with the Ministry of Technical and Vocational Training and the Ministry of Higher Education, with the collaboration of private sector representatives and training institutions. Works will be conducted for programmes on continuing in-service with regard to the needs of enterprises.
Building the capacity of private sector associations in order to enable them participate in the drawing up and implementation of economic policies and to improve their servicesPreparation of a common programme for the capacity building of the private sector; Number of seminars and workshops conducted in the area of capacity building.2003-2004MINDICActivities of the Chamber of Commerce were launched in January 2003 with the installation of its bureau.

The plenary session of the Chamber took place on 18 December 2003. The first seminar on capacity building was organised in Kribi in September/October 2003.

A seminar on capacity building of CCIMA officials is scheduled in July 2004.
Suppressing factors that hamper the development of the private sectorIdentification of factors; Preparation of measures in view of suppressing these factors, in collaboration with the private sector; Publication of measures in view of suppressing these factors2003-2005MINDICThe Interministerial Committee enlarged to the private sector held its meeting under the patronage of the Prime Minister. Problems that hinder the development of the private sector were identified and examined on this occasion:

-energy shortage: creation of a steering committee chaired by the Presidency of the Republic, construction of the Limbe thermal plant;

-Regular production of a plate on the cost of production factors

-Promotion of export: ongoing studies for the creation of a support fund, information seminars on AGOA opportunities organised in the ten provinces.
Core area n°4: Building basic infrastructure and natural resources, and protection of the environment
Measures/actionsFollow-up indicatorsPeriod of executionAssigned institutionLevel of executionObservations
4.1 Development of basic infrastructure
Increasing means geared towards the rehabilitation of the priority road networkAnnual budget earmarked for investments;2003MTNTP

MINEPAT

MINFI
CFAF 22 624.272 million of public investment budget in 2003 out of a total of CFAF 59 531.272 million, representing a rate of 38% for the 2001/2002financial year
Package of resources allocated to the Road Fund2003MTNTP

MINEPAT

MINFI
CFAF 22 thousand million in 2003
Building capacity in the programming of road maintenance works and in the award of contracts for this purposeCapacity building programme drawn up and implemented2003-2004MTNTP- Creation of a programming unit in the Road Department. The new organisational chart allows for the consolidation of means of action of this unit.

- Creation of 3 tender boards including 1 solely devoted to road maintenance works

- MINTP signed a partnership agreement with the ARMP on the basis of which ARMP provides technical support to the 3 tender boards
Promoting the use of labour intensive techniques in road maintenance in rural areas and in secondary roadsAdoption of a common strategy for the promotion of HIMO techniques.2003MTNTP

MINUH/

MINVILLE

COUNCILS
MINTP



HIMO strategy for rural road maintenance works adopted by MINTP with the support of Cameroon BIT which allows for the experimentation of the method in previously selected councils



MINUH

- A decision was signed a few years ago to use at least 15% of the resources of projects for HIMO financing in every project

- Consultation and sensitisation meeting (8/10/03) for enterprises to involve them in the fight against poverty by using labour-intensive techniques within the framework of projects they are in charge of

An interministerial meeting (MINTP, MINVILLE, MINUH) was organised last year in view of drawing up a harmonised strategy within the framework of HIMO works.



MINVILLE

While the consultation meeting organised by MINTP is still awaited, MINVIL carried the following activities:

(i) Training in Italy of some officials of MINVIL in the HIMO techniques; (ii) training seminar organised by MINVIL from 24 to 29 November on HIMO techniques; the seminar was intended for officials involved in the process (iii) MINVIL’s 2004 programme of action focuses on these techniques. To this end, 20 to 30 % of the cost of every highway project is devoted to the me of HIMO. Other highway works are concerned, including cleaning of gutters etc
Finalising the strategy for the development of rivers and lakesAdoption, publication and dissemination of the strategy2004MINTRANSDiagnosis benchmark and complementary study for data on river and lake traffic conducted in high concentration areas



Basic data available
Preparation and drafting of the strategy paper awaited: support of a consultant required, terms of reference prepared

*Programming: April-June 2004

Workshop for validation and adoption awaited in view of a participatory approach (depending on the preparation of the report of the consultant.)

*Programming: July—August 2004

Publication and dissemination (awaited)

*Programming: September-October 2004 Implementation as from 2005.

The programming exercise will be conducted provided there are funds earmarked for this operation; as a matter of fact, given budget constraints, the 2004 budget projections did not take this operation into account and as such, no budget line has been provided to this effect.
Finalising the strategy for the development of transport means and servicesAdoption, publication and dissemination of the strategy2004MINTRANSFinalisation of the reference benchmark on transport intermediary means (MTI).(The report on the first phase is available )

The second phase is being examined with the collaboration of the consultant.



Basic data on MIT throughout the territory are available
Preparation and drafting of the strategy paper on the means and services expected (support of a consultant required)

*Programming: May-July 2004 Workshop for validation and adoption awaited,

*Programming: September—October 2004



Publication and dissemination (awaited)

*Programming: November — December 2004 Implementation as of2005



* The programming exercise will be conducted provided there are funds earmarked for this operation; as a matter of fact, given budget constraints, the 2004 budget projections did not take this operation into account and as such, no budget line has been provided to this effect.
4.2-Development of telecommunications, information and communication technologies
Finalising the Ministry of Posts and

Telecommunications’ sector strategy
Adoption, publication and dissemination of the strategy.2003MINPOSTELDiagnosis of sub sectors prepared

Steering committee set up

Ongoing validation process

Experts and counterparts recruited

MINEPAT staff put at their disposal to help in the drafting of the strategy.
Facilitating the development of information and communication technologiesEstablishment of the institutional and regulating frameworkfrom 2003MINCOM

MINPOSTEL
Projected within the framework of the implementation of the sector strategy
Creating multimedia community centresAt least 10 centres are functionalfrom 2003MINCOM- MINCOM website operational

- MINCOM on line Journal regularly updated

- On line purchase of accessories.
Extending the optical fibre installed along the Doba-Kribi pipeline to Douala and Bafoussam in view of creating a high speed network and reduce the cost of private communicationEffective installation of the optical fibre in Douala and Bafoussam;

Marketing policy on the use of the fibre formulated and implemented
2003-2004MINPOSTEL

SNH COTCO
Action being completed

Marketing policy still to be designed
Establishing the system of scrambling and certificationEffective establishment of the scrambling system2003-2005MINPOSTEL

OPERATORS
Still to be implementedProjected within the framework of the strategy
Establish the Government communication networkVolume of additional investments in the sector2003-2005MINPOSTEL
Establishing an appropriate legal and regulatory framework for ICTEstablishment of the legal framework2003-2004MINPOSTEL

MIN

JUSTICE
Improving the capacity and quality of telecommunications infrastructure (increase fixed and mobile telephone lines)Number of works carried out;

Increase coverage by fixed and mobile telephone lines
2003-2005MINPOSTEL

OPERATORS
Action underway with MTN, CAMTEL and Orange

Orange: 410 000 lines

MTN: 350 000

CAMTEL: 80 000
Preparing the telehealth projectPreparation and adoption of the project2003-2004MINPOSTEL

MINSANTE
Feasibility studies completed. File forwarded to MINSANTE
Creating new rural radios and community telecentres in rural areasNumber of new rural radios created;

Number of telecentres created
from 2003MINCOM

MINPOSTEL
- 30 rural radios are being commissioned about fifteen are operational

- a project declared eligible by the thematic committee was submitted for community communication aspects

- 16 pilot telecentres
- construction of buildings almost completed
Restructuring school syllabus in secondary, technical and vocational schools by introducing computer studiesAdoption, publication and dissemination of a new programme; Computer equipment availablefrom 2003MINEDUC

MINETFOP
MINEDUC

The programme on the teaching of computer sciences in secondary schools was prepared, adopted and published; it is implemented since the beginning of the 2003/2004 academic year;

- computer programmes are available in the second cycle of technical schools which needs to (i) make computer applications compatible with technology and (ii) keep up with technological innovations in mis dynamic area;

- computer project under HIPC funds underway;

- availability of computer equipment is globally satisfactory for about ten schools, mat is 30 computers for each school (265 PC acquired in 2003)



MINETFOP

- computer programmes are available in the second cycle of technical schools which needs to (i) make computer applications compatible with technology and (ii) keep up with technological innovations in this dynamic area

- computer project under HIPC funds underway;

- availability of computer equipment is globally satisfactory for about ten schools, mat is 30 computers for each school (265 PC acquired in 2003)
4.3- Management of natural resources: promote access to potable water
Drawing up a sector strategy on waterAdoption of a common strategy, publication and dissemination2003MINMEE- Terms of Reference prepared

- Reflection unit set up;

- Preliminary paper prepared

- 2 workshops for validation organised
Intensifying water supply programmes (wells, developed springs, boreholes, semi water supply)Number of works carried outfrom 2003MINMEE

MINAGRI
Development of 10 water points Promotion of drop by drop irrigation

- Installation of 3 generators at Minkan, Malawaye and Massakal

- Installation of a borehole pump in Malawaye



Launching of 12 small irrigated village areas (PPIV)
4.3- Management of natural resources: develop and promote industrial mine exploitation (solid mines and hydrocarbons)
Preparing Cameroon mine planAdoption, publication and dissemination of the mine plan2004MINMEE

Economic operators
The mine code and geologic map are prepared
Building institutional capacitiesPreparation of a capacity building programme2003-2004MINMEE

Economic operators
- Creation of CAP AM in 2003 by the Prime Minister’s order



CAPAM (Support Framework for the Promotion of Mining) was created an its activities were launched

Reflections are underway for the industrial mine sector.
Training of agents working in the new structures2003-2004MINMEE

Economic operators
In the field training of CAPAM officials
Supporting the production, processing and marketing of mine handicraft productsPublication of measuresfrom 2003MINMEE

Economic operators
Signing of a joint venture agreement between CAPAM, and South African and Danish business persons of the group CAMSA MINING Organisation and grouping of craftsmen into GIC-A-MINES
Promoting research and exploitation of solid mines and hydrocarbonsPublication of instruments in view of promoting research and exploitation of solid minesfrom 2003MINMEE

Economic operators
Implementation instruments of the mine, oil and, gas code have been signed. What remains to be done is the preparation of a promotion strategy and programme

First forum on mine and geology organised
Modernising and computerising the geologic and mine documentation centreCreation and equipment of the Centre2004MINMEEMINMEE organisational chart allows for the creation of the Centre. Premises available in 2003

First works completed; search for financing underway for the other component of the project
Computerisation of geologic data;2004MINMEE
Improvement of investors access to geologic and mine data2004MINMEE
Rehabilitating the Centre for analysis and tests ( MINMEE laboratory)Effective rehabilitation of the Centre2003-2005MINMEEThe centre was rehabilitated and the laboratory for analysis of petroleum products equipped.
Preparing the geologic and mine map on a scale of 1/200 000Preparation and adoption of a detailed map, publication and dissemination of the map2003-2008MINMEE

MINREST

PARTNERS
Map prepared
Implementing the new mine, petrol and gas codesMechanisms for the control of the respect of new codes operationalPermanentMINMEERegular control missions conducted
Effective implementation of the new codesPermanentMINMEEAward of the first permits for exploitation and exploration of deposits in 2003.
Searching for investments in the area of hydrocarbonsVolume of investments realisedPermanentMINMEE

MINEPAT
Partnership contract between CAPAM and the South African mine group was signed in October 2003. We are waiting for the implementation of the contract to determine the volume of investments realised in small mining; the SNH is in charge of the hydrocarbon component
4.3- Management of natural resources: prevention of geologic and industrial hazards and disasters
Reinforcing the management of geologic and industrial hazards and disastersPlan of the management of hazards and disasters prepared and implementedPermanentMINMEE

MINREST

MINATD
Fact sheet of projects prepared
Increasing control of dangerous industrial sitesNumber of punctual control made and revenue generatedPermanentMINMEE

MINEF
The environmental inspection conducted control operations and sanctions were meted out: 13 missions conducted, 4 minutes prepared, and CFAF 24 750 000 of fines already collectedImplementation of the PSFE;

Capacity building of the Permanent Secretariat for the Environment:

(Building, human resources, training, finance and norms, etc.)
4.3- Management of natural resources ensure access to energy by all
Developing and extending the electrification programme to rural areasAccess to electricity rate in rural areasEvery yearMINMEE AERThe Rural Electrification Agency (AER) prepared a programme based on the Cameroon Rural Electrification Master Plan

MINMEE instruments were used to enlighten the conditions of the study, programming and execution of the said programme.

A few villages were supplied with electricity under AER, AES-SONEL, PIB and HIPC financing
Developing and rendering the other sources of energy available (solar, air energy…)Availability of technologies for the exploitation of other forms of energy2003-2005MINMEEThere are companies in Cameroon working for the popularisation of solar energy. Cameroon and China are finalising the programme on semi hydro electric plants.The technical assistance contract between AER and the Tunisian Electricity and Gas Corporation (STEG) will help to develop other forms of energy given the provisions of the Cameroon Rural Electrification Master Plan.
Rate of access to other forms of energy2003-2005MINMEEOn the basis of studies of the Cameroon Rural Electrification Master Plan, the rate of access to other forms of energy stood at 0% in 2003.
Establishing a network for a sound supply of domestic gas in ecologically fragile areasIdentification of ecologically fragile areas2003-2005MINMEE

SCDP

CSPH
The ecologically fragile areas are found in the 3 northern provinces
Rate of access to domestic gas in these areas2003-2005MINMEE

SCDP

CSPH
  • - A study on the domestic gas market was conducted by professionals of the sector
  • - The market was constantly supplied through local production and imports
A storage and distribution centre for GPL is currently being constructed in Maroua..
Conducting a study in view of selecting available options at the technical, economic and financial levels to curb potential power shortages in the short-termPublication of the report on the study2003-2005MINMEE

ARSEL
Ongoing preparation of the report on the study. Studies on the environmental impact are going on as concerns the Lompangar dam.
Options taken to curb potential power shortages in the short-term2003-2005MINMEE

ARSEL
Studies conducted;

A 85 MW thermal plant is being constructed in Limbe

Funds provided for the construction of a a mini hydroelectric dam:

Environmental impact studies are being conducted for the Lompangar dam whose

construction will be completed in 2009

The Nachtigal dam will also be constructed in 2009 under the auspices of the Steering Committee for energy set up by the Presidency of the Republic There is a search for financing in view of the construction of a 1000 MW dam in Cameroon
4.3- Management of natural resources: management of the environment and energy
Implementing the biological diversity plan of actionEffective implementation of the biological diversity plan of actionfrom 2003MINEF- Promulgation of the bio security law;

-Implementation of the bio security on the basis of capacity building;

- Popularisation of the law.;

- Dissemination and sensitisation on the paper through various workshops;

- Capacity building
Core area n°6: Building human capacities, developing the social sector and integrating the underprivileged in the economy
Measures/actionsFollow-up indicatorsPeriod of

execution
Assigned

institution
Level of executionObservations
5.1- Implementation of the strategy on education
Putting in place, in collaboration with UNICEF, UNESCO and NGOs a mechanism to inform and sensitise parents and communities on the advantages of children’s educationCommon strategy to sensitise parents and communities prepared and implemented; Creation of ad hoc information and sensitisation units2003MINEDUC

MINETFOP
A sensitisation campaign was organised for education committees, religious leaders, traditional rulers, political and administrative authorities. School enrolment, especially girls, is still hindered by socio-cultural and economic prejudices…
Satisfactorily implementing, within the time period allowed for, the sector strategy especially as concerns devolution and decentralisation of the management of teachers and education personnelEvaluation report availablefrom 2003MINEDUC

MINETFOP
MINEDUC:

The implementation of the process on devolution of the management of the ministry in conformity with Decree N° 2002/004 of 4 January 2002 to regulate the organisation of MINEDUC is effective.

The management of career and salary formerly devolved on MINFOPRA and MINFIB is henceforth entrusted to MINEDUC.

Sections 105 and 121 of the above mentioned Decree stipulate that the management and planning of human and financial resources during official exams are henceforth transferred to provinces and divisions as the case may be.

MINETFOP:

Organisational chart signed on 27 August 2003

SYGIPES project underway (census of personnel).
. The planning programme for the execution of works on the construction of provincial delegations that will host the the operational structures of the devolution process runs from 2001 to 2007.
Conducting an audit on the debt of the private education vis-à-vis the CNPS and on the basis of mis audit, find appropriate solutionsReport on the audit available2003MINEDUC

MINETFOP
The report on the first phase of the audit conducted on catholic and protestant schools was received while the invitation to tender for the conduct of the second phase of the audit concerning Islamic and lay schools is underway.In the same light, the French cooperation will conduct a parallel audit on all groups within the framework of the C2D.
Reinforcing control and evaluating structures within the Ministry of National EducationControl agents trained2003MINEDUC

MINETFOP
The Inspectorate General of Administration was reinforced within the framework of the 2002 organisational chart and logistics were put at its disposal. Capacity building focused on the increase of staff which moved from 7 to 15; training of senior staff is underway.The ongoing training of senior staff of this control structure will guarantee their expertise in the discharge of their duty.
Involving local councils, the civil society, NGOs and families in the funding of primary educationCommon strategy for funding primary education formulated and implemented; Contribution of partners to the funding of primary educationA partir de 2003MINEDUCBasic instruments (draft decree and conceptual framework) that specify the involvement of partners in the funding of informal education, including primary education were prepared and forwarded to the Prime Minister’s Office since 2000.Partners are ready to finance community based primary education
Taking incentive measures in view of the creation of private schools in rural areasAdoption and implementation of a new law on private education2004MINEDUCA draft bill and its implementation instrument were prepared, validated and forwarded to the Prime Minister’s Office for the continuation of the procedure. The Presidency of the Republic convened officials of the Prime Minister’s Office, MINEDUC, and MINETFOP in December 2003 in view of a final review of these draft instruments.-
Ensuring the supervision of staff, follow-up and efficient functioning of primary education structuresTraining needs identified; Number of persons trained; Different follow-up reports prepared2004MINEDUC
Reinforcing partnership with the private sector in the area of construction of schools and improvement of the management of private schoolsLaw adopted and implemented2003-2005MINEDUC

MINETFOP
Ongoing
Updating the school map in view of improving the information system of the Ministry of National EducationSchool map updated and publishedPermanentMINEDUC

MINETFOP
MINETFOP

Terms of reference are being prepared, the organisational chart was signed on 27 August 2003



MINEDUC

The school map prepared in 2001/2002 by this ministry was updated in 2003 and published
Ensuring that qualified teachers are effectively present in all schools especially in remote areasEffective presence of teachersPermanentMINEDUC

MINETFOP
MINETFOP

Needs in personnel formulated
Extending the scope of Government intervention in favour of private schools (subsidies, posting of teachers and improvement of infrastructure)Amount of subsidies provided for private education; Number of Government teachers transferred to private schools2004MINEDUCSubsidies are effectively and constantly granted to private schools since 1996. On their demand, teachers are transferred to private schools. Subsidies were distributed to catholic, protestant, Islamic and lay schools as follows: CFAF 3.650 million in 1996/1997, CFAF 3 thousand million in 1999/2000, CFAF 4 thousand million in 2000/2001, CFAF 4 thousand million in 2001/2002, 2 thousand million for the transitional period and 4 thousand million in 2003.
Instituting regular production of statistical indicators at all levels of the education systemPeriodic production of the statistical directory per level2004MINEDUC2003 Statistical directory prepared and published in July 2003
Promoting access to information and communication technologies in the education systemNumber of pilot government schools equipped with computers; Number of students trained in computer sciences2004MINEDUCThe technical study conducted for the equipment of government schools with computers was conducted; As an experimental operation, some schools received a special donation from the Head of State to set up their computer centres. These schools include: Lycéé Gééneral Leclerc, lycée bilingue d’Essos in Yaoundé and lycée Joss in Douala and lycée de Bamenda.Acquisition of computer materials will take off during the 2004financial year. Meanwhile the plan of action prepared laid emphasis on the mastery of information and communication technologies by MINEDUC senior staff.
Ensuring technical, technological and vocational trainingNumber of training sessions organised;



Number of students trained
2003-2004MINESUP72 vocational training programmes exist in vocational schools

Consultations are underway between MINESUP and universities for the creation of vocational sections in all faculties by the year 2005. The creation of a DESS in quality management in the University of Ngaoundere falls in line with these actions.

In 2002/2003, there were 12 827 students registered in the 72 fields.

Collection of data underway to determine the number of students trained in 2003/2004
Conducting a study on the institution of distant, alternate and continuous educationReport on the study outlining guidelines;



Identification of needs in distant, alternate and continuous education functional and accessible
2003-2004MINESUPA forum on distant education and its potential contribution to Cameroon education held in September 2003. The forum brought together official of MINESUP, MINEDUC, MINETFOP, representatives of higher institutions and international partners;



This forum will help to prepare terms of reference of the study.



Within the framework of COMETES (Coordination and Modernisation of Higher Technical Learning Institutions) a survey is underway for a more detailed identification of needs; in this line, a workshop that brought together higher technical learning institutions was organised.

A draft bill on distant education is being prepared by MINESUP.
Conducting an architectural and rationalisation study on the costs related to the construction and rehabilitation of academic infrastructureReport on the study available; Costs of construction and rehabilitation of infrastructure available2004MINESUPEvaluation of the situation in the various universities
Equipping higher learning institutions with computersNumber of higher learning institutions equipped;





Rate of access of students to computer studies
2003-2004MINESUPAll universities are equipped and have computer pools at their disposal



In Yaounde I, the highest rate of access in 2002/2003 is 1 computer for 100 students.



Several programmes being executed in MINESUP help to improve on the situation:
  • - Support programme to ICT in MINESUP: 155 PC distributed in 2003/2004 in all universities. The programme was projected in the 2004/2005 plan of action.
  • - Programme « 1 lecturer 1 computer »: 600 lecturers benefited from this programme in 2002-2003
Establishment of the Inter University Documentation Centre (CIRD) (online, website), at the disposal of lecturers and students.
Each government university has at least 3 multimedia resource centres
5.2- Implementation of the health strategy
Malaria control
Ensuring the training and further training of health personnel in medical care of emergency casesAt least 90 % of health personnel received further training in medical care of emergency cases2003MINSANTEA number of provincial trainers were trained/further trained in the ten provinces: 15 persons per group that is 150 persons in all.
Putting the treatment kit at the disposal of households in 44 health districtsAt least 50 % of households have treatment kit2003MINSANTEKits not yet available in health institutions.

However, the home medical care guide was prepared and the institution in charge of making the kits has been identified.
Gradually increasing by 80 % the number of health institutions that have malaria treatment protocolAt least 80 % of health institutions have malaria treatment protocolfrom 2003MINSANTEThe consensual workshop held in January 2004 on malaria treatment and its prevention among pregnant women recommended a new therapeutic plan. The process allows for the preparation of directives and creation of a follow-up committee. Protocol will be revised with regard to recommendations of this workshop.
Adopting and publishing national directives on the integrated control of disease carriersAdoption and publication of national directives2003MINSANTEDirectives on the treatment of mosquito nets prepared as well as a community relay guide.
Training members of structures of dialogue or field workers, in mosquito nets treatment techniquesNumber of field workers trained2003MINSANTE115 field workers were trainedThis training is still going on
Preparing and adopting a national communication plan on malariaCommunication plan adopted and implemented2003MINSANTEThe draft national communication plan on malaria is available
Providing mosquito nets to at least 50% of pregnant womenEffective distribution of the 150,000 mosquito nets acquired in 2002, and launching of distribution operation of the other 600,000 acquired in 20032003-2004MINSANTEa) 150,000 mosquito nets of the first phase were treated; 100,000 of them have already been distributed;

b) 667,000 mosquito nets were ordered for the second phase, of which 108,000 have sofar been received; at the same time 12,000 litres of insecticides were acquired;
A decision by the Minister of Public Health in April 2004 has fixed the price of a treated mosquito net at CFA F 3,500, and that for treatment at CFAF 500
Endemics, emergencies and catastrophes
Creating and making operational a national emergency centre and at least two secondary emergency centresA national emergency centre, and secondary emergency centres created and made functional2003MINSANTEa) Studies are underway for the emergency centre in the Yaounde Central Hospital

b) The document for the treatment of emergency cases in Cameroon is under preparation
STIs/AIDS
Promoting the use of condoms by truck drivers, workers in the port, soldiers and prostitutesAcquisition and distribution of condoms2003MINSANTEa) 22 million condoms were distributed in 2002; this figure to SO million in 2003.The remaining condoms are awaiting new contracts to be passed with NGOs, on the condition that funds are provided to PMSC
Creating a counselling and HIV screening centre in each provinceNumber of provincial centres created and made functional2003MINSANTEa) 11 CPDV are functional, including 2 centres in the Littoral Province

b) NNANGA EBOKO and KRIBI centres are under construction

c) 40, 000 people were tested in 2003; 25,000 of which were tested during the Cameroon’s week for the fight against AIDS
30 district CPDV will be constructed in 2004 thanks to the C2D
Providing private non profit-making hospitals with reagents, health products and ARVNumber of private non profit-making hospitals provided with reagents, health products and ARV2003)MINSANTEa) 63 PTME sites, out of the 160 existing are private and non profit-making

b) 1 of the 18 existing CTAs is a confessional private institution (PETTE)

c) 2 CTAs are affiliated institutions (Allucam, CDC)
Carrying out a vast sensitization campaign on the Prevention of Mother-to-Child Transmission of STIs/AIDS (PTME)Number of copies of the prevention technical guide (French/English) distributed in all maternity hospitals and in Community-based health centres2003MINSANTE
  • a) 6,000guides (4,000 in French, 2,000 in English) produced and distributed
  • b) 160 PTME sites are operational, i. e 30% coverage
  • c) 65,000 women were counseled in 2003; 40,000 tested, 8% of which were HIV positive
Providing health centres with the necessary HIV/AIDS screening materialNumber of departments, units, blood transfusion centres, blood depots and banks capable of carrying out HIV, hepatitis B/C, and syphilis tests2003MINSANTE10 provincial hospitals with blood depots and banks, and capable of carrying out HIV tests
Fight against tuberculosis
Conducting architectural surveys for the construction in each province of an operational screening and treatment centre with a capacity of 50,000 to 100,000 peopleStudies available for each province2003MINSANTE
Promoting the use of the Technical Guide for the treatment of tuberculosis in screening and treatment centresNumber of screening and treatment centres having a technical guide for the treatment of tuberculosis;

Number of TB patients identified and treated
2003MINSANTE163 CDT have a Technical Guide for the treatment of tuberculosis

3,871 cases of TB were treated with TDO in 2001, with a 75% success rate
  • - 3,871 cases treated with TDO in 2001, 75% success rate
  • - 11, 477 TB cases (all types) identified in 2002
Providing CDTs with working microscopesNumber of CDTs having a working microscope2003MINSANTE18 CDTs are equipped with microscopes
Training and offering refresher courses to medical doctors, nurses and laboratory technicians, in the treatment of tuberculosis in each existing CDTNumber of medical doctors, nurses and laboratory technicians trained or offered refresher courses in each CDT2003MINSANTE
  • - 40 medical doctors trained/offered refresher courses (Centre 10, Littoral 15, Adamawa 15)
  • - 40 nurses trained/offered refresher courses (Centre 15, Littoral 15, Adamawa 10)
  • - 22 laboratory technicians trained/offered refresher courses (Littoral 10, Adamawa 12)
Preparing and adopting a national communication plan on tuberculosisPlan available and operational2003MINSANTENational communication plan not yet prepared, because of lack of funds
National Immunisation Extension Programme
Improving on the immunization coverage with DTC3Immunisation coverage rate2003MINSANTEDTC3 coverage rate: 69.4% in September 200370% coverage rate is the objective
Equipping health establishments with cold chainsNumber of health establishments equipped with a working cold chain2003MINSANTE964 health establishments have a refrigerator
Reinforcing the logistical means of vaccination teamsNumber of motorcycles acquired;

Number of vaccination teams having a motorcycle at their disposal
2003MINSANTE- 180 motorbikes were ordered by the PEV. Studies of bids underway for 2003 orders



- 441 vaccination teams have functional motorbikes (year 2002)
Drugs, reagents and essential medical materials
Providing all health institutions with essential drugs, preferably in their generic form, as well as reagents and other essential medical materialsNumber of health institutions having essential drugs, reagents and other essential medical materials2003MINSANTE- 91.5% of health establishments have Generic Essential Drugs (MEG) (9 HP, 135 HD, 119 CMA, 1,173 CSI)



- consultations launched to extend this action to confessional health establishments
Preparing and providing health institutions with the therapeutic guideTherapeutic guide available in health institutions2003MINSANTEDrafting committees formed
Preparing and providing all health institutions with the national form on essential drugsNumber of health institutions having received the national form on essential drugs2003MINSANTEDrafting commit tees formed
Funding of health care
Preparing a mutual support fund CodePreparation, publication and distribution of the mutual support fund Code2003MINSANTEA committee of experts was set up in December 2003 by the minister of public health. A sub-committee is in charge of the drafting of the terms of reference of mutual support funds in Cameroon in the health field. This work is underway
The health of mothers, teenagers and the elderly persons
Promoting vaccination against tetanus, of pregnant women who come for consultationNumber of pregnant women consulted and vaccinated against tetanus2003MINSANTE52.2% of the women received the VAT II
Improving on the birth assistance rate by qualified staffNumber of births assisted by a qualified staff2003MINSANTE58% of births are carried out by a qualified professional
Carrying out a systematic screening of breast and brain cancersNumber of breast and brain cancers identified and treated2003MINSANTEData still to be prepared
Promotion of community-based treatment of child diseases (PCIME)
Ensuring the PCIME in health districtsNumber of health districts implementing the PCIME2003MINSANTE3 health districts implement the PCIME
Training health district chief doctors, and heads of community-based health centres in the use of the PCIMENumber of health district chief doctors, and heads of community-based health centres trained in the use of the PCIME2003MINSANTE10 senior staff ( 9 medical doctors and 1 TSSI) were trained in the facilitation of the PCIME course

24 medical workers were trained in PCIME

4 staff were trained in community PCIME, including 2 medical doctors, 1 TSSI and 1 NGO representative
Preparing a national information, education and communication planNational plan available and operational2003MINSANTENational strategic plan available Operational plan available
Food and nutrition
Preparing a national policy document on nutritionPreparation, publication and distribution of the national policy on nutrition2003MINSANTEA draft policy document and programme on nutrition with WHO financial assistance
Administering, twice a year, capsules of vitamin A to children aged 6 months - 5 yearsNumber of children aged 6 months - 5 years having received, twice a year, a capsule of vitamin A2003MINSANTE- 100% of children aged 6 to 59 months in the Adamawa, North and Far-North provinces received a capsule of vitamin A during the local immunization days.



- All over the country, close to 75% of children aged 6-11 months received a capsule of vitamin in 2003
Making basic health services ensure the monitoring of young children growthAt least 25% of basic health services monitor the growth of young children2003MINSANTENo action was carried out in this regard in 2003, because of lack of budgetary allocation
Improving health services
Rehabilitating training institutionsAt least 25% of training institutions rehabilitated and functioning2003MINSANTE15 training school received rehabilitation and equipment credits worth CFAF 300 million
Assessing the qualitative and quantitative situation of the heritage in 40% of health districts, in conformity with priorities presented in the sanitary mapStudy report on 40% of health districts available2003MINSANTEAssessment, identification and safety of the heritage are included in the 2004 PIB
Constructing new community-based health centres in non covered areasNumber of new community-based health centres (CSI) constructed2003MINSANTEDecision signed to create about 100 CSIsLand formalities included in the 2004 PIB
Management process
Training health district chiefs of service, district hospitals chief doctors, sub-directors of central and external services, in the preparation and running of objective-oriented budgetsAt least 25% of health district chiefs of service, district hospitals chief doctors, sub-directors of central and external services trained2003MINSANTETraining of health district chiefs of service, and directors of district hospitals in 17 target health districts in the 3 EU support provinces within the PASS framework (i.e. 10.22%)
Recruiting health personnel on a position-based contractAt least 1,200 health personnel recruited on a position-based contract2003MINSANTE1,200personnel were recruited;and 980 contracts signed
Building service lodgings for medical doctors working in remote areasAt least 100 service lodgings built for medical doctors working in remote areas2003MINSANTE- An invitation to tender was launched for the construction of 138 service lodgings



- 25 lodgings are under construction (firstphase)



- Examination of bidss is going on for 108 lodgings (second phase).
5.3- Other social development policies and strategies
Finalizing the social development strategyFinalization, publication and dissemination of the strategy2003MINEPAT

Sector

Ministries
An orientation Committee for this strategy was set up by a Prime Minister’s decision

- Recruitment by MINEPT of a consultant to execute the work

- Creation of a partnership technical unit to prepare the social development sector strategy;

- Collection of data from ministries is going on
Finalizing the strategy on the promotion of the womanFinalization, publication and dissemination of the strategy2003MINCOFThe strategy document on the promotion of the woman was finalized and transmitted to MINEPAT
Adopting a legal instrument on the protection of the rights and dignity of the womanFinalization, publication and dissemination of the legal instrument on the protection of the rights and dignity of the woman2003-2005MINCOFPreparation of a draft bill to fight violence against women Validation of the draft bill underway Translation into English
Promoting the informal education of the woman and the young girlProgress achieved in reducing school drop-outs and illiteracy rates among young girls and women2003-2005MINCOF- 03 social mobilisation campaigns in each province to promote the education of the young girl in areas where high school drop-out rates are recorded (Far-North, North, Adamawa, East, and a few neighbourhoods in Douala and Yaounde);

- Training of 25 field workers and 352families in Parental Education in the Adamawa province (Ngaoundere, Belel, Meiganga);

- Creation of 03 image boxes;

- Organisation of a prize award ceremony dubbed « Female Excellence» for 152 best female secondary school students in 2003 exams, in both general and technical education, and in both Anglophone and francophone educational systems;

- During the 450 sensitization sessions on STIs/AIDS, the promotion of the education of the young girl was discussed.

- Social mobilisation sessions were organised during the 2004 International Day of the Woman on the theme: « Gender and the fight against HIV/AIDS »
This consisted in round-table discussions, conferences, counselling in public administrations and all over the national territory
Building the capacities of field workers in the promotion of the woman within the framework of specialised structures (women promotion centres, and applied technology centres)Capacity building programme developed and implemented



Organisation of seminars and training sessions;



Number of field workers trained
2003-2005MINCOFConcerning women promotion centres (CPF), a programme is developed for each training module, and its implementation has started

As concerns Applied Technologies Centres (CTA), a strategic plan was developed, and a draft is now available

Capacity building for the staff is envisaged with HIPC resources and within the framework of the ACBF (African Capacity Building Foundation)



Some 2,000 women were trained in Women Promotion Centres
- A document was submitted to apply for funding on HIPC, and was approved by the committee on 27 November 2003
Finalizing the social affairs sector StrategyAdoption, publication and dissemination of the strategy2003MINAS- validation of the report on the preparation of MINAS strategy;

- production of synthesis documents is going on
Finalizing the people’s and family CodePublication and dissemination of the people’s and family Code2003MINAS-Preparation of the draft Code completed in 2003;

-Adoption by government and parliament under finalisation
Adopting a law on the protection of the childPublication and dissemination of the law2004MINASAppointment of members of the multisectoral committee for the preparation of the draft law on the protection of the child;

-Production by a consultant of a compendium of legal instruments on the protection of the child;

-Organisation of a validation workshop of the said compendium; -Organisation of committee work
Adopting a law to promote the insertion of marginalized populationPublication of the law to promote the insertion of marginalized population2004MINAS- law to promote the insertion of marginalized population under preparation
Rehabilitating institutions in charge of the re-education of socially disabled childrenNumber of institutions rehabilitated2004MINASAudit conducted for two institutions in charge of the rehabilitation of the disabled: CNRH and RIB of Buea
Developing social services for the socio-economic insertion of the disabledSocial plans developed yearly; Number of disabled persons trained and insertedPermanentMINAS-Studies available for the development of a master plan to promote disabled persons. Projects to rehabilitate the CNRH and RIB have been prepared and earmarked for HIPC funding.Programming of the support to micro economic activities of the less priviledged during the 2004 budgetary year
Promoting social services in open areas in favour of the minors in need of Social SecurityPlan of activities executed yearly Number of minors offered Social Security, trained and insertedPermanentMINAS-In 2003, 800 street children were identified in Yaounde; 335 of them were reinserted in many works of social life (education, socio professional).

  • - Amelioration of the running of the “Centre d’Ecoute de Yaounde” in 2003,
  • - Continuation of family insertion of fifty (50) street children of Yaounde;
  • - Educational reinsertion of seventy-five (75) street children, and institutional reinsertion of eighty (80) street children of Yaounde in 2003;
Programming of the opening of’’ Centre d Ecoute de Douala’’ during the 2004 budgetary year
Promoting the development mutual assistance, support and family follow-up local initiativesPromotion strategy for the development of local initiatives prepared and implemented Number of local initiatives backed up each yearPermanentMINAS-Putting in place of solidarity granaries to provide community assistance to vulnerable persons, the elderly, the disabled, and serious patients

-Realisation of fifteen (15) solidarity granaries during the 2003 budgetary year;
Fifteen (15) solidarity granaries programmed for 2004
5.4-Reduction of urban poverty
Finalizing the urban development sector strategyFinalization, publication et dissemination of the Strategy2003MINVILLE1)-A consultation framework created by ministerial decree among the main urban stakeholders, in view of the building of an urban sector development strategy in Cameroon;

2)-The terms of reference of this project were prepared by members of the Steering Committee and of the ad hoc Operational Unit;

3)-A seminar to launch activities of this project was held in February 2003 and allowed for the collection of most of the data needed for the diagnosis phase of this study;

4)-An external consultant was recruited to assist MINVILLE in the preparation of this strategy;

3)-A training workshop on the methodology of preparing development strategies was organised by the Consultant on 28 and 29 November 2003, for officials of MINVILLE, who are members of the Technical Secretariat; for this reason the level of execution of this project can be estimated at 70%;

4)-The preparation process of the strategy is at the diagnosis phase of the urban sector in Cameroon
Carrying out a study for the development of a national lodging policyStudy report available and used in the development of a national lodging policy2004MINUH- The final Report of the Ad HOC committee on the national lodging policy was deposited to the Prime Minister’s Office to be forwarded to the Presidency of the Republic,

10,000 lodgings planned in the medium term in the report following instructions from the

Presidency of the Republic, 2,000 lodgings to be built by July 2004.

Execution of the Diagnosis balance sheet of government strategy in the field of lodging is underway.
Rehabilitating purification and treatment stations of waste waterNumber of stations rehabilitatedAs from 2003MINVILLE

MINUH

CUY/CUD
Towns with less than 10,000 inhabitants have no purification station
Ensuring sanitation of primary drainage networks, rehabilitating purification and treatment stations of waste waterTotal drainage carried outPermanentMINVILLE

MINUH

CUY

CUD
1- 2.1 Km clearing of NJENGUELE RIVER in Limbe;

2- 400 linear metres of drain pipes constructed at MILE ONE, Limbe;

3- 16 metres long paved road at MILE TWO, Limbe; 4-2.5Km of gauging of river MFOUNDI, Yaounde;

5- 5Km of drainage at MBOPI, Douala;

6- 600Km gutter clearing and 40 Km of drain pipes in Douala;

7- 20 metres of paved road in MA WAK, Kousseri;

8- 12 metres long bridge constructed at Madagascar neighbourhood in Yaounde;

9- 10 metres of paved road in Nkolondon, Yaounde;

10- 15 metres paved road in Kassalawata, Kumba;

11- Construction of a 6875 m long dyke worth CFA F 2.968 thousand million, to protect the banks of river Logone in Kousseri.
Rehabilitating basic infrastructure (roads and public lighting)Total infrastructure rehabilitatedPermanentMINVILLE

MINUH/CUY

CUD
I)- FAR-NORTH PROVINCE (Total = 2,600 lm):

Maroua (total = 2,600 lm)

-Maintenance of1,200 lm of the road portion Porte Mayo- MINEPAT Provincial Delegation

- Maintenance of the road portion Carrefour Djama-SODECOTON

- Maintenance of the road portion Dispensaire CNPS-Relais Ferngo

- Maintenance of the road portion Ouro- Tchedé.

Mokolo (total road maintained = 1 500 lm)

-Creation of public gardens

Kousséri

-Construction of a paved road at Mawak

-Rehabilitation of the building hosting the provincial Delegation of Urban Affairs

-Fitting out of roads and the banks of river Kousseri

II- NORTH PROVINCE (Total infrastructure rehabilitated = 1 500 lm): Garoua

-Maintenance of the road portion Stade Ahmadou Hayatou — Route Nationale 1

III- ADAMAWA PROVINCE (Total infrastructure rehabilitated = 700 lm): Ngaoundere:

- Maintenance of road portions Carrefour Marché -Carrefour Ministre- Carrefour Tissus

IV- CENTRE PROVINCE (Total infrastructure rehabilitated = 27 610 lm): 1- Yaounde:

-Treatment of critical points at Ngousso neighbourhood

-Construction of Mimboman-Don Bosco bridge

-Tarring of access streets to Oyomabang neighbourhood

-Tarring of access roads to the slaughterhouse

-Tarring of street 4770 at Mimboman neighbourhood

- Tarring of streets 3449; 1421; 7631

-Fitting out underway of the Governor’s Office place

- Fitting out of green spaces within the Presidency of the Republic

- Fitting out of Carrière ring road

- Fitting out of the Municipal Lake

-Rehabilitation of carrière Ring road

- Madagascar streets (streets 2376; 2395; 2378)

- Fitting out of the Warda presidential itinary

-Essos streets (streets 1344 and 1367)

-Rehabilitation of Emombo-Nkomo road

-Rehabilitation of MvogBetsi ring road

-Rehabilitation of Obili road

-Rehabilitation of Biyem assi Avenue

V- LITTORAL PROVINCE (Total infrastructure rehabilitated = 34,410 lm): Douala (Total = 12,900 lm)

-Rehabilitation of Leclerc Boulevard

-Rehabilitation of theReunification Boulevard

-Rehabilitation of Dr. JAMOT Avenue

-Rehabilitation of King AKWA street

-Rehabilitation of Congo Paraïiso street

-Rehabilitation of Bepanda — Bonamoussadi road portion

-Rehabilitation of Carrefour Boulangerie de la Paix — lst pont Makepé road portion

-Rehabilitation of Hôtel Royal — Collège UEBC road at Bonabéri. Loum (total = 1,500 lm)

-Maintenance of Carrefour manguier access road.

-Public lighting in Loum Edéa (total = 20 000 lm)

-Renovation of Sonbengue —Sipandang road

VI- EAST PROVINCE (Total infrastructure rehabilitated = 1 000 ml): Bertoua (Total = 1,000 lm)

-Rehabilitation of Carrefour Matgénie—GMI —Carrefour face à face road

VII- NORTH-WESTPROVINCE (Total infrastructure rehabilitated = 500 lm): Bamenda (Total = 500)

-Rehabilitation of Mrs Ndeng-Junction/hotel Road

-Rehabilitation of New Layout road.

VIII- WEST PROVINCE (Total infrastructure rehabilitated = 3 800 lm): Bafoussam (Total = 1,200 lm)

-Rehabilitation of Elf Ndiangdam access road Foumban (total: 2,300 lm)

- Mission Catholique — Lycée Technique road

-Creation of a place for young craftsmen.

IX- SOUTH-WESTPROVINCE (Total infrastructure rehabilitated = 1,000 ml):

Buea (Total = 1,000 lm) -Rehabilitation of Buea Town — Koke road

X- SOUTH PRO VINCE (Total infrastructure rehabilitated = 1,000 ml):

Ebolowa (Total = 1,000ml)

- Displacement of a SNEC. water supply network

- Emergency work on some earth roads in Sangmelima
Concerning the rehabilitation of city roads, the following problems were encountered:



At the financial level

- Insufficient financial resources (HIPC funds, PIB, Road Fund) earmarked for road maintenance;

-Inadequacy of running credits of technical services in public administrations in charge of the maintenance of city roads;

-difficulties in the payment of discounts by enterprises (especially SMEs) to the public Treasury as regards the PIB At the technical level

-poor equipment of SMEs

-lack of executive staff in SMEs.
Carrying out specific studies to build up a coherent and operational action plan on the fight against urban povertyReports on specific studies available;

A coherent and operational plan of action prepared on the fight against urban poverty
2004MINVILLEThe following reports of specific studies are available:

1-lodging survey in Yaounde; the reading of the report is underway.

2-updating and extension of digital cartographic data on five resort towns.

3-technical studies to fit out the access road, North of Yaounde, (between Messassi and Etoudi.

4- technical studies to fit out the road Mvog Ebanda-Eleveur-Carrefour Safari at Nkolmesseng, Yaounde;

5- technical studies to construct a work of art at carrefour Coron in Yaounde;

6- the Sanitation Project of Yaounde (ADB)

7- preparation and implementation of a sector plan for the fight against AIDS;
Study underway to rehabilitate 140 Km primary drains in Douala; study to be completed in 2004
Implementing sanitation emergency plans in Yaounde and Douala City CouncilsPlans of action prepared and implemented2004MINVILLECUY/CUD- Water and sanitation master plan of Maroua; study under preparation

- Sanitation Plan of Douala.
Restructuring urban extension areas and secondary urban centresSurface area restructured and development plan prepared2005MINVILLE MINUH- Restructuring Plan of Ngaoundere II on 800 ha

-Draft Urban Development Code forwarded to the Prime Minister’s Offfice in 2002for approval,

Implementation underway of urban master plans for 9 towns ( Mamfe, Meiganga, Nanga-Eboko, Mbengwi, Dschang, Meri, Meyomessala Makak, Lagdo) Designing simplified master plans for small towns.
Formalizing in the form of contracts, the partnership between government and local councils for a better management of citiesNumber of urban contracts signed and implemented2005MINVILLE MINUH-A workshop on urban contracts was held in Yaounde by MINVILLE;

-A study is being carried out on the city of Limbe; this aims at signing an urban

contract between Limbe city Council and MINVILLE.
Opening up land-locked districts, and restructuring areas occupied in a disorderly manner- Urban development Plan prepared and implemented;

- Access roads rehabilitated or created;

- Number of disorderly districts restructured in collaboration with the population
2005MINVILLE

CUY/CUD
- The Urban Development Master Plan (SDAU) of Yaounde and its Local Master Plans (PDL) are being updated in MINVILLE. The SDAU project of Yaounde is at the stage of validation by the Municipal Council, while the PDLs are being finalized.- The SDA U project of Yaounde will be completed in 2004

- Updating of SDAU Douala and its PDLs is planned for the 2004 budgetary year;

- Updating of urban development master plans for the other five resort towns is also planned for 2004.

-The Urban Development Plans of the rest of towns will be planned for 2005.
Creating centres for the social reinsertion of street childrenNumber of centres created; Number of street children trained and reinserted2003-2005MINVILLE

CUY/CUD
Preventing urban delinquencyStrategies built up and implemented2003-2004MINVILLE

CUY/CUD
Study underway for the prevention of urban delinquency in Yaounde
Preparing a displacement plan in Douala and YaoundePreparation, adoption and publication of the displacement Plan in Yaounde and Douala2003-2004MINVILLE

CUY/CUD
Creating and keeping under control, dumping sites for household wasteNumber of dumping sites created2005MINVILLE

CUY/CUD
5.5- Creation of fobs and insertion of underprivileged groups into the economic circuits
Finalizing and adopting the Declaration on the National Employment PolicyAdoption, publication and dissemination of the Declaration2003METPSThe draft Declaration on the National Employment Policy is being finalizedThe Government also intends to finalize sector-based strategy documents in ministries involved in the social affairs sector.

With regard to maintaining social peace, the Government is planning to (i) continue with negotiations in view of the signing of Social Conventions, (ii) prepare and implement a National HIV/AIDS control Plan among workers, and (iii) revive CHS within enterprises. Concerning the promotion of employment, the Government intends to (i) develop mechanisms and the process of the organisational and financial support to stakeholders of the informal sector within the PIAASI framework, and ii) build up Priority Development Programmes to be part of the Global Employment Promotion Strategy.

In this regard, The Government is planning to:

- Draw a National Plan of Action on youth employment, in conformity with UN Resolution N° 57/165; -finalize the study on the conformity of the law with National and International Labour Norms;

- follow-up Social Security Policy;

- finalize the study on the reduction of the vulnerability of Social Dialogue partners;

- build acting and intervention capacities of Syndicates and professional associations.
Carrying out a study on the informal sector employmentReport of study published2003ONEFOP /NIS
Facilitating the putting in place of systems of information on the job marketPutting in place of systems of information;

Data available on a permanent basis
PermanentONEFOP/NIS
Promoting youth employmentNumber of youth insertedPermanentNEFA funding to the tune of CFA F 320, 962, 500 was put at the disposal of NEF for self-employment of1,475 youth.
Core area n°7: Improvement of the institutional framework, administrative management, and governance
Mesures/actionsIndicateurs de suiviCalendrierStructures

responsables
Etat d’exécutionObservations
Reinforcing transparency in the management ofpublic affairs, and accountability of managers
Publishing results of studies, surveys and audits carried out to improve the quality of service in key sectors (Education, Health, basic Infrastructure, Justice)Results of surveys and audits published and accessible to the public2003MINEPAT

MINEDUC

MINSANTE
Terms of Reference of the « budget tracking exercise » were drafted by the Department of Statistics, in close collaboration with the World Bank. This exercise will be done in two phases, and is due to start in September 2003 with the execution of the budgetary follow-up aspect in the health sector.
Conducting a periodical budgetary follow-up in the social sectors through audits by independent consultants;Results of surveys and audits published and accessible to the publicPermanentMINEPAT

MINEDUC

MINSANTE
The technical file on the execution of the « budget tracking exercise » and appreciation surveys among beneficiaries of services provided in the health and education sectors, was prepared by a technical team made up of senior staff from NIS, as well as experts of CTS, MINEDUC, MINSANTE, the ministry of technical education and vocational training, the ministry of finance and the budget (BD) and the ministry of economic affairs, programming and regional development (Department of programming and public investments ). This team received the technical assistance of a World Bank expert in August 2003.
  • Health sector
The budget tracking exercise as well as the appreciation survey among beneficiaries of services in the health sector were carried out. A provisional main report was produced; This was examined for the first time by a steering committee on 23 March 2004, and was finalized based on observations and comments of the CP, and a validation and participatory preparation workshop on a draft plan of priority actions was organized on 12 - 14 April 2004.
  • Education sector
Activities relating to the education sector resumed in November 2003. Technical documents were finalized and validated by the World Bank. Survey agents were trained in early March 2004; The budget tracking exercise which began in early 2004 is due to be completed by March ending, in conformity with the scheduled calendar. The first results are expected in April/May 2004.
Having annual audits Carried out by independent consultants on the system of award of public contractsReports of audits published and accessible to the publicPermanentARMPThe synthesis of audit reports on public contracts for the 2000/2001 (June July) budgetary year was made by ARMP Board of Directors and is now available. A Consultant (2AC/ACP) was recruited in April 2003 to carry out an audit of public contracts for the period of July 1, 2001 to December 31, 2002. The audit report was submitted in February 2004. Thirty-one (31) independent observers were recruited for the period of November 1, 2002 - December 31, 2003; they produced about 1,900 reports. A consultant was recruited to make an assessment of the transitional phase; he submitted his report.

The final report of the audit on public contracts of the 2001—2002 period and the transitional period, was submitted by the auditor and approved; this final report was made available since March 2004, and sent to the World Bank and IMF Resident Missions on 26 and 27 April 2004 respectively.

The final report on the assessment of the transitional period was submitted by the consultant on 23 April 2004, and sent to the World Bank and IMF Resident Missions on 26 and27April 2004 respectively. A round-table discussion on the conclusions of the said report, as well as those of the audit report on public contracts, is scheduled for 13 and 14 May 2004.
Continuation of the in-depth reform of the judicial system
Completing the study on the technical audit of the judicial systemReport of study available2003MINJUSTICE

MINEPAT
Report on the technical audit available Plan of action of the judicial system built up.
Building and implementing the strategy on the reform of the judiciary, based on the recommendations of the study on the technical audit of the judicial systemStrategy adopted and implemented2003-2004MINJUSTICE

MINEPAT
A study on the technical audit of the judicial system was carried out, and the report submitted on 03 October 2003; Recommendations made in this study helped in the preparation of a plan of action on the reform of the judiciary at the end of December 2003. Work to finalize the plan of priority actions is underway A plan of actions for the reform of the judicial system was built up in a participative manner during a seminar held on 22 and 23 December 2003. This plan of action was approved by competent authorities and sent to development partners, notably the IMF and the World Bank on 30 December 2003. The World Bank addressed its observations on the said plan of action, to government authorities in a letter dated 24 February 2004.

While awaiting the preparation of a plan of priority actions proper, it should be noted that judicial authorities prepared draft bills and draft decrees, which are being examined by the high hierarchy of the Ministry of Justice. These draft bills and decrees include (i) the draft bill to organize the judicial system, (ii) the draft bill to fix the Status of Magistrates, (iii) the draft bill to Organize the Supreme Court, (iv) the draft bill to specify the procedure before the Administrative Bench of the Supreme Court, (v) the draft bill to specify the procedure before the Judicial Bench of the Supreme Court, (vi) the draft bill to organize administrative Courts, (vii) the draft bill to organize regional Audit Benches, and (viii) the draft decree to specify the Special Status of Court Registrars.
Putting in place the legal institutions provided for in the January 1996 Constitution, notably the Audit Bench and the Constitutional CouncilThe law to organize the Audit Bench; Constitutional Council; the Audit Bench and the Constitutional Council operational2003-2004MINJUSTICE

MINFI

MINEPAT
• The Audit Bench

A) The law to organize the Audit Bench was adopted and promulgated (Law N° 2003/005 of 21 April 2003)

The putting in place of the Audit Bench involves five (05) steps, namely: (i) Adoption of de the law to organize the Audit Bench of the Supreme Court (ii) examination of accounts, (iii) recruitment and training of the Bench judges (iv) drafting and publication of the Status of the Bench Members (v) provision to the Bench of the necessary logistics.



The National Assembly adopted during its March 2003 session, the law to specify attributions, the organization and functioning of the Audit Bench of the Supreme Court.

The President of the Audit Bench of the Supreme Court, and two Members, who are Magistrates of the Judiciary, were appointed by Decrees N° 2004/081 and N° 2004/082 of 13 April 2004 respectively.

The rest of members, notably those not belonging to the Magistracy, will be appointed as a result of the ongoing selection process.

A follow-up committee of actions relating to the putting in place of the Audit Bench of the Supreme Court was set up and is already operational. It is made up of four taskforces.

A plan of priority actions to be carried out before the Bench goes operational, accompanied by an implementation calendar, and was validated The execution of this plan is underway

• The Constitutional Council

Execution of the plan of action for the putting in place of the Constitutional Council, which was adopted by the Government in November 2002, is almost completed. The National Assembly, during its March 2004 session, adopted the draft bill to organize and specify the functioning of the Constitutional Council, and the law to specify the status of members of the Constitutional Council. The President of the Republic promulgated Law N° 2004/004 of 21 April 2004 to organize and specify the functioning of the Constitutional Council.
Intensifying the fight against corruption
Putting in place a coalition to fight against corruption, involving the government, the private sector, the civil society, and all stakeholdersCoalition operational; Programme of activities drafted in collaboration with the civil society2003NGPActions underway

Preparations ahead of the seminar on the coalition to fight corruption are underway. Meanwhile, a law on the reinforcement of prerogatives of the ad hoc committee on the fight against corruption is being prepared. The present constitution of the ad hoc Committee on the fight against corruption, which is presided by the Prime Minister, the National Observatory of the fight against corruption, and ministerial Anti- Corruption Units, takes into account the need to get the civil society involved in actions to fight against corruption.



Effective participation of members of the civil society in the various meetings held by Anti- corruption Units, and in the various fact-finding missions carried out by the said Units.
Building and adopting a strategy to sensitize the public on good governance and the fight against corruptionStrategy adopted; Programme of actions drawn2003NGPActions underway

Publication on the Internet of the NGP and the PAP in order to improve on good governance and the fight against corruption. Implementation of the IEC Plan (Information-Education-Communication) and the putting in place of participative follow-up of the implementation of the NGP in public administrations. All these actions are backed up by UNDP and ADB.
Ameliorating the dissemination of, and access to information on the management of public affairs
Carrying out a study on the access by citizens to information on the management of public affairsStudy finalized and disseminated2003MINCOMStudy not completed

  • Executive Committee set up
  • Consultant selected (« CADIC GOMBERT INTERNATIONAL/JURIDIS/CRETES/ICCNET »).
  • Setting up of an interministerial steering committee for the follow-up, evaluation and validation of the study;
  • Disbursement of funds underway
Strengthening regional development by adopting some twenty community projects
Selecting and making the projects operationalSelection criteria specified; 20 projects operational2003MINATDTerms of reference for the selection of the 20 community development pilot projects were prepared and adopted after discussions with the World Bank’s experts

A circular to specify areas of the projects, as well as modalities for their preparation was addressed to municipal administrators in the ten provinces

- Transmission of projects to municipal administrators and to the Permanent Secretary of the CCS/PPTE.
Improving the production and dissemination of information
Rendering the National Institute of Statistics operationalSocial bodies put in place2003MINEPATAction to be carried out
Making a cost estimate of the implementation of the Minimum Statistical Programme (PSM)PSM in figures2003MINEPATImplementation of MDG estimated at CFA F 3.650 thousand million
Building a partnership and a participatory process for the implementation of the strategy
Putting in place a system of information for the various stakeholders in the fight against povertyA system of information put in place2003MINEPATThe project is under study (MINCOM and MINEPAT) following the Head of State’s instructions.
Building the capacities of the civil society, the private sector and state personnel involved in the fight against povertyNumber of persons trained2003MINEPATTraining workshop-seminars scheduled.

ANNEXE 2: BUDGET EXECUTION ITEMS

MINISTRY OF PUBLIC WORKS
ACTIVITIES PROGRAMMEDCOST

(IN 000 FCFA)
FINANCES

ALREADY

ENGAGED
FINANCES TO

MOBILIZE

PIB 2003
OFFICIALSSOURCES OF

FINANCING
LEVEL OF

EXECUTION
PROPOSED

SOLUTIONS
OBSERVATIONS
1.1 - STUDIES :
1.1.1 - JOINTLY FINANCED PROJECTS ALREADY ENGAGED
1. Improvement of conditions of movement in intercity priority road network through the suppression of existing or potential damaged stretches of the road (2 890 km)1 842 97400073 621DR/SDIR-AFD (C2D)

-PIB
4%Construction/rehabilitation of 93 bridges, 6 crossings and 01 concrete slabs

Report on the identification on damages stretches pending approval
2. Rehabilitation and development of rural roads in coastal provinces (2 104 km)1 697 098000250 000DR/SDIR-AFD (C2D)

-PIB
6%Feasibility pre-studies on 2104 km completed. Choice of roads to rehabilitate: 1200 out of 2104 km. Study report pending approval PIB: 71 060
3. Construction of substitution roads for omnibus railway services (424 km)528 503000200 000DR/SDIR-AFD

-PIB
38%-Completed detailed technical studies

-Support to Administration for project tender analysis and elaboration for contracts to be finalised

-03 project contracts to be signed:

*Lot 1: Kumba-Douala-Yaounde: 93.6 km

•Lot 2: Yde-Bélabo-Lom II: 116.7 km

*Lot 3: Lorn ll-Ngaoundal -Ngouandéré: 99.1 km

Project cost estimates: 3 100 000
4. Improvement of the Kumba - Mamfe road (148 km)393 807125 000DR/SDIR-World Bank (IDA)

-PIB
100%Amendment initiated on PIB 2003 on 28/04/2003, Ongoing elaboration of TF- CCF already approved by the Department of Roads.

-Ongoing elaboration offenders for the social aspect following rejection by TB-TN of the related amendment
5. Rehabilitation of KFW bridges, Ebebda and Noun bridges, etc (about fifty)8 500 000200 000KFW DR/SDIR-KFW

-PIB
Aggregate: 54%

Anual 2003: 100%
-Contract signed on 24/05/02

-Duration 3 years (Studies and projects).

-SO notified on 25/06/02.

Phase1:

Techniques studies being completed

*section 1: Ebebda and Noun bridges

- Restricted international invitation to tender for projects launched one 15/09/03. Ongoing evaluation of files

*section 2: other bridges -TF shall be sent to road maintenance TB by end Jan. 2004. 3 out of 50 structures pending inspection

-Phase 2:

Project starting off
6. Reinforcement of the Douala - Kekem road (161 km)124 309210 000KFW-KFW

-RF
100%LOT 1 et 2: Studies to be approved

Project estimates:

LOT 1: 15 000 000

LOT 2

LOT 2-1: 8 000 000

LOT 2-2:5 000 000
7. ASPERB (Support for the privatisation of the maintenance of tarred roads)Techn. Adviser 1

DR/SDIR/

SOA ASPERB
-KFW

-PIB
Multiiannual project 1999-2007. Aggregate: 55.6% Annual 2003: 100%Creation by Ministry of PW of a committee to be coordinated by Technical dviserl-data bank programme for structures nearing completion

-management strategies for structures pending approval
8. Tarring of Bamenda - Ekok road (lot 2 & 4 ):

-Lot 2 Batibo-Bachuo Akagbe_ (75 km )

-Lot 4 Mamfé- Ekok border road(67 km)
182 430339 000-ADB

-PIB
100%-Studies carried out Amendment for payment to the copany pending signature-Studies: ODA approved but not provided

-Environmental impact assessment: final report available

-Economic evaluation completed
9. Cameroon road master plan268 5110DR/SDIR-PASS/EDF

-PIB
40%- 30 million fCFA advance signed for the acquisition of software programmes and training of administrative staff-Adoption of programme elaborated by BET

-3rd phase of study pending validation
10. Reinforcement of Maroua-Kousséri road (264 km)104 375DR/SDIR-AFD (C2D)

-PIB
20%-report of installation and that of preliminary field survey pending validation
11. Hydraulogical studies for the construction of 8 bridges between Kribi and Campo6 406EU

DR/SDIR
EU

-PIB
90%-Study pending completion -Report submitted
12. HIPC PROGRAMME, study phase (2na and 3rd years)

Section 1: 3 206 km Section 2: 3 500 km
774 912HIPC DR/SDIRHIPC multilateral98%-Project planned in 2 parts over 3 years

-CCF for part 1 available concerning 754 km for the 2nd year



-CCF for part 2 available concerning 900 km for the 3rd year
1.1.2- JOINTLY FINANCED PROJECTS TO START
13. Improvement of Garoua - Boulai -Ngaoundéré road (267.5 km)755 755EU DR/SDIR-EU

-PIB
0%-TF approved

-Contract pending signature
14. Reinforcement of Foumban-Tibati road1 459 047DR/SDIR-AFD (C2D)

-PIB
0%-Contract pending signature
15. Reinforcement of Ngaoundéré - Garoua road (271 km), with widening of one-way bridges + creation parking spaces along the cliff+reinforcement of the banks of the Benue (2nd phase over 1 400 m)1 444 111DR/SDIR-AFD (C2D)

-PIB
0%-Contract pending signature
TOR: Terms of Reference; CCF: Company Consultation File; TF: Tender file; TB: Tender Board; SO: Service Order; AFD: French Development Agency; IDB: IslamicDevelopment Bank; KFW: Kreditanstalt Fr Wiederaufbau; EDF: European Development Fund; ADB: African Development Bank
TOR: Terms of Reference; CCF: Company Consultation File; TF: Tender file; TB: Tender Board; SO: Service Order; AFD: French Development Agency; IDB: IslamicDevelopment Bank; KFW: Kreditanstalt Fr Wiederaufbau; EDF: European Development Fund; ADB: African Development Bank
Programmed activitiesCOST

(IN 000 FCFA)
FINANCES

ALREADY

ENGAGED
FINANCES TO

MOBILIZE

PIB 2003
OFFICIALSSOURCES OF

FINANCING
LEVEL OF

EXECUTION
Problems

ENCOUNTERED
PROPOSED

SOLUTIONS
OBSERVATIONS
1.1.3 - PROJECTS FINANCED BY LOCAL FUND ALREADY ENGAGED
16. Reflection on the reform of the Road Fund and the setting up of the Nationa Roads Council and the Road Agencyp.m.SG

CJ
PIB75%-Preliminary-draft elaborated in April 2003
17. Study on financing road infrastructuresp.m.SG

TB

DR
PIB75%-Preliminary draft elaborated in April 2003
18. Reinforcement of Mbalmayo - Ebolowa road (75 km)62 717DR/SDIRRoad Fund70%-ODA/CCF pending approval
19. Improvement Obala-Batchenga-Nanga Eboko- Bouam roads (192 Km out of 264 Km)482 899DR/SDIR-PIB100%-CCF of 03 lots available

-Cost estimates: 18 000 000

-LOT 1: 182 879

-LOT 2: 193 666

-LOT 3: 106 354
20. Reinforcement and improvement of Yaounde-Nsimalen to 2x3 lanes (15 km)55 00020 00010 000DR/SDIR-PIB50 %-Insufficient financing-Additional works: 45 000-Contract awarded but suspended for lack of fund

-Studies underway with new project orientation
21. Construction of new bridge over the Vina106 731DR/SDIR-PIB100%Delays in the settlement of BET bills-Mobilization of a additional amount of 40 442-APS approved.

- ODA being elaborated

-Request of extension of duration of contract submitted by the company on 01/07/03
22. Construction of Sangmélima-Djoum- Congo borders (335 km)607 000350 000-PIBAggregate: 32% Annual: 113%Roads blocked by the forest -Insufficient finances to settle billsProjected engagement of 156 million de FCFA made in end November 2003-Study to span over 3 financial years

-APS available

-Elaboration of ODA starting
23. Peripheral roads round Douala with a second bridge over the Wouri1 672 0751 000 000DR/SDIR-PIBPhase 1: 100 %

Phase 2 aggregate: 43%

Annual: 75%
-APS validated on 05/05/2003

-Studies underway for the concession du nouveau pont

-APS pending approval for the construction of a peripheral road to cross river Wouri
24. Opening of Yingui-Mosse-Ndogbassaben road (57 km)50 000-PIBAggregate

40%

annual 2003 0%
- TF for construction nearing completion

-The people want only direct execution of studies
25. Reinforcement of Bafoussam-Bamenda road (57 km)100 000100 000-RF

-PIB
20%- 1st Report pending approval
26. Reinforcement of Yaounde-Pouma road (57 km)70 27170 271-RF -PIB20%- Survey report and environmntal plan pending approval -economique reprt pending approval
27. Improvement of Bertoua-Batouri-Kenzou-(Bertoua -Batouri road: 90 km out of 197 Km)250 000DR/SDIR-PIB100%-Studies on Bertoua-Batouri road completed, CCF available
28. Yaounde-Kribi road lot 2: Olama-Lolodorf-Kribi bridge (271 km)200 000100 000DR/SDIR-PIB100%Difficult passage between NTB and TB-TNSpeeding up of TB-TN procedure-agreements pending signature

-contract pending award by the STB

-Ngomedzap-Mengueme slip road also studied under this project
29. Reinforcement of Eseka-Boumnyebel road (33 km)90 000DR/SDIR-PIB100 %- CCF finalized.
30. Reinforcement of Yaounde-Ndé bridge (201 km)80 63580 635-RF

-PIB
20%- Survey report on environmental plan pending approval -economic report pending approval
1.1.4 - PROJECTS FINANCED BY LOCAL FUNDS TO START
31. Mengong-Sangmelima road (71 km)DR/SDIR-PIB0%-TF being prepared
32. Dogbele-Mandimba-Akwa Nord road (33 km)50 000DR/SDIR-PIB0%Contract awarded on 01/07/03 by TB-TN
33. Peripheral road round the Presidential Palace200 000DR/SDIR-PIB0%-TF studies finalized for open tenders
TOR: Terms of Reference; CCF: Company Consultation File; TF: Tender file; TB: Tender Board; SO: Service Order; AFD: French Development Agency; IDB: IslamicDevelopment Bank; KFW: Kreditanstalt Fr Wiederaufbau; EDF: European Development Fund; ADB: African Development Bank
TOR: Terms of Reference; CCF: Company Consultation File; TF: Tender file; TB: Tender Board; SO: Service Order; AFD: French Development Agency; IDB: IslamicDevelopment Bank; KFW: Kreditanstalt Fr Wiederaufbau; EDF: European Development Fund; ADB: African Development Bank
ActivitiÉs programmÉdCost

(IN 000 FCFA)
Finances

ALREADY

ENGAGED
Finances to

MOBILIZE

PIB 2003
OfficialsSources of

FINANCING
LEVEL OF

EXECUTION
Problems

ENCOUNTERED
Proposed

SOLUTIONS
Observations
1.2 - WORKS AND CONTROL 34 sites executed 94% (aggregate rate: 57%) in 2003 for 9 631/272 106 million de FCFA
1.2.1-JOINTLY FINANCED PROJECTS ALREADY ENGAGED
1. Improvement of Nsimalen-Mbalmayo/ Ebolowa-Ambam roads (120 km)31 343 0631 000 000DR/SDIR-AFD

-PIB
100 %Delays in paying the contractors

-construction of road weighing stations
-payment amendment under study-works completed in November 2002

- final reception on 08/12/203

Remainder to be paid by PIB:

Compensation: 4 186 812 F CFA

Taxes: 4 336 172 FCFA

TOTAL:8 522 984 F CFA
2. Improvement of Ambam-Kye Ossi road (34,2 km)9 524 852370 000DR/SDIR-AFD

-PIB
100 %Delays in paying the contractors-contractors’ claims under study-Works completed and received on 23/09/2003
3. Rehabilitation of the Wouri bridge13 206 040878 000DR/SDIR-AFD

-PIB
Aggregate :

21%

Annual :

95.32%
-setting up of interministerial steering committee by PM on 06/06/03

-Works underway since 16/06/03

-quality ensuring plan validated
4. Construction of the Makabaye bridge5 003 10213 000-Inspector No.2

-DR/SDIR
-AFD

-PIB
Aggregate:

75%

Annual:

69%

-Works nearing completion

-Construction of weighing station underway

VAT exclusive amount: 566 096 F CFA

PIB

Taxes: 788 188 750 F CFA

Compensation: 57 270 000 F CFA
5. PUER - IDA 2nd part (Tarring of steep slopes 55.6 km)9 755 63844 000-WB -IDA -PIBAggregate:

99.83%

Annual:

99.59%
-Insufficient resources-payment amendment pending signaturePhase 1: Provisinal reception declared on 16 april 2003 (3,3 billion)

Duration: 12 months

- Phase 2: works received on 30/12/2003 (3,3 billion FCFA TE)

Duration: 10 months

PIB

Compennsation: 804 816 F CFA.

Taxes: 1 307 066 F CFA.

Total: 2 111 882 FCFA
6. Rehabilitation of rural roads in 03 provinces:



  • Works in the North-West ( 254 km)
  • Sensitization in the Centre, South and North -West provinces
4 263 81319 000-WB -IDA



-PIB
Aggregate: 100%

Annual: 95.61%

Works completed
-Withdrawal of some BETs-Payment amendment for BETs pending signature for payment in 2004-Sensitization of population completed

-Works phase :

8/9 lots received

1/9 awaiting reception

Total amount 3.6 billion FCFA Tl

PIB allocation in 2004

Amount: 1 067 000 000 F CFA
7. Improvement of Ngaoundéré -Touborro-Moundou road (383 km)52 393 45092 0000PERFED II

DR
-EU

-PIB
Aggregate :

18%

Annual:

88%
-Marked difference between ODA and the reality :

-several taxes to be paid

-Safety on works site
-Envisaged additional works cost



-resources provided by MINTP in June 2003
-Works underway



-Security presently go to the field with their equipment
8. Tarring of Ambam - Eking ( Gabon borders road ) (27 km)11 516 222250 000DR-ADB

-PIB
Aggreagate: 14% Annual: 100%-Works starting

-Duration: 15 months

PIB allocation

Amount:1 480 612 084 F CFA
9. Tarring of Melong - Dschang road (section of the mountain + section of the plain + costruction works ) (22,5 km and 4 bridges)20 125 307450 000DR-ADB

-PIB
Aggregate :

13%

Annual :

100%
-Works starting

-Duration: 25 months

PIB allocation

Compensation: 2 148 341 000 F CFA Taxes: 2 736 454 000 F CFA
10. Construction of bridges over river Ntem at Ngoazig and Eboro+ BIYI EBA -MEYO KYE road stretch (19 km)5 031 15018 200PERFED II DR-EU

-PIB
Aggregate:

17%

>Annual:

100%
-The Government ensures the management of the Ngoazig bridge while the Gabonese manages the Eboro bridge and the stretch

-Works underway since 09/06/03
11. Rehabilitation and maintenance of farm-to-market and access roads in the TIKAR plain (36.85 km)326 796PERFED II DR-EU

-PIB
41 %Works underway including construction of the KOUBANG bridge

-works awaitng reception

-1/3 lots received

PIB allocation

Amount: 1 840 080 000 F CFA
12. Rehabilitation of the Bambui-Fundong roadTx: 258 174 Cle: 24 093



Total: 282 267
DR/SDIR-KFW

-PIB
86%-tax problems-tax burden to be borne on the PIB credit arrangement-Works nearing completion

PIB allocation: 44 468 336 F CFA
13. HIPC PROGRAMME, projects sectorTravaux: 3 854 270

Contrôle: 295 091



Total: 4 149 360
200 0000DPTP



DR
-PPTE multilatéralAnnual :100%-problems in the disbursement of funds-Additional costs of works expected-year 1: 9 contracts concerning 490 km of road in the Centre and South provinces completed and received

-year 2: contracts for 754 km of road pending signature

-year 3: tender to be launched by TB-TN
I.2.2 - JOINTLY FINANCED PROJECTS TO START
14. Reinforcement of the Yaounde -Ayos road (126 Km) + stretch to AKONOLINGA (12 Km)Total:

5 000 000
500 000PERFED II

DR
-EU

-PIB
0%- Tender launched by STP /EDF

-analysis offenders uderway
15. Reconstruction of rural roads in the Adamawa, East, and South-West provinces (1112 km)14 355 577250 000DR/SDIRIDB

Fonds OPEP PIB
0%-Insufficient financial resources earmarked for 2003-additional resources to be budgeted :

4 236
-Signing of contracts underway (05 lots)

-01 lot declared unsuccessful and awaitng re-awarding

-environmental impact assessment pending approval

PIB allocation: 4 492 500 (for works)
16. Construction of the bridge over the Lokoundje in Lolodorf1 384 39250 000PERFED II

DR
-ADB

-PIB
0%Tender unsuccessful due to withdrawal of sponsorsSearch for

new sponsors
-search for financing underway
17. Construction of the Ayos-

Bonis road
48 512 690550 000DR/SDIR-IDB

-BADEA

-Fonds OPEP

- FSD

-FK

-PIB
Aggregate: 0%

Annual: 100%
-Tender declared unsuccessful on 28/04/2003 by MINTPSearch for agreement with sponsors to negotiate with the lowest bidder on 11/06/03 -new TF elaborated-lot 1: draft consultancy contract sent to sponsors for non-objection. Contract pending awarding Marché Project underway de passation

-lot 2: draft consultancy contract sent to sponsors for non-objection. TF pending launching

- PIB to contribute to the tune of 4,29%
18. Construction of the EKING bridge (EBORO)75 000PERFED II DR-EU

-PIB
Aggregate: 0%

Annual: 0%
19. Rehabilitation of the KFW bridges700 00700 000DR/SDIR-PIB0%-Tender launched
I.2.3 - PROJECTS FINANCED UNDER DOMESTIC RESOURCES ALREADY ENGAGED
20. Dschang-Bamougoum roadExp:

100 000
DR/SDIR-PIB100%-Insufficient finances for expropriationsljustification for use of initial credit pendingWorks completed Expropriation underway 100/570 million paid in 2003
21. Bamenda-Bambui roadExp :

8 000
DR/SDIR-PIB100%-Partial payment of remainder of expropriation compensation-Partial payment of remainder of expropriation

-Remainder of about 8 000 are being paid
TOR: Terms of Reference; CCF: Company Consultation File; TF: Tender file; TB: Tender Board; SO: Service Order; AFD: French Development Agency; IDB: IslamicDevelopment Bank; KFW: Kreditanstalt Fr Wiederaufbau; EDF: European Development Fund; ADB: African Development Bank
TOR: Terms of Reference; CCF: Company Consultation File; TF: Tender file; TB: Tender Board; SO: Service Order; AFD: French Development Agency; IDB: IslamicDevelopment Bank; KFW: Kreditanstalt Fr Wiederaufbau; EDF: European Development Fund; ADB: African Development Bank
ACTIVITIES PROGRAMMEDCOÛT

(EN MILLIERS

DE FCFA)
RESSOURCES

FINANCIÈRES

DÉJÀ ENGAGÉES
RESSOURCES

FINANCIERES A

MOBILISER

PIB 2003
ResponsablesSources OF

FINANCING
NIVEAU DE

RÉALISATION
Difficultes RENCONTREESPROPOSITIONS

DE SOLUTIONS
OBSERVATIONS
22. Opening of the Mamfe-Akwaya road (125 km)1 496 705250 000IG

DR/SDIR
-PIBAggregate: 77 %

Annual: 100%
-Insufficient finances in 2003-Allocate 835 million to complete the works-Works underway
23. Improvement of the Bolifamba-Buea urban motorwayTx: 6 969 504

Cle: 376 000

Total: 7 345 504
1 050 000DR/SDIR-PIBAggregate: 91%

Annual: 100%
-Delay in the provision of credit

-additional works to be paid for
-Works suspended for re-start in November 2003-Works nearing completion

-700 million needed for additional works
24. Opening of the WEH-ISSU-FRU AWA - Nigeria borders road (80 km)TF: 176 428

TC: 313 543

Total: 499 971
150 000DR/SDIR-PIB30%-Difficulties in paying contractor

-50 000 not disbursed
-Allocate TCI credit

-Payment of bills at the Yaounde Central Treasury
Bi-annual contract (01-02 / 02-03)

-Closed segment completed

-Conditional segment starting
25. Opening of the DIZANGUE-MOUANKO - YOYO II-SOUELLABA road (84 km)TF: 153 221

TC: 346 456

Total:499 977
200 000DR/SDIR-PIBAggregate 80%

Annual 100%
-Insufficient finances budgeted-Gradual opnening depending on funds availableBi-annual contract (01-02 / 02-03)

-Closed segment received.

-Conditional segment underway
26. Opening of the BEFANG-BAORO-AKWAYA road (110 km)TF: 185 283

TC: 294 696

Total: 479 979
200 000DR/SDIR-PIB73%-Insufficient finances budgeted-Gradual opening depending on funds availableBi-annual 01-02/02-03)

-Closed segment received.

-Conditional segment underway
27. Opening of the Ndogbelle-Bodiman-akwa nord road (37 km)246 489DR/SDIR-PIB5%-Works starting
28. Garoua- Gashiga bridge000DR/SDIR-PIBAggregate 20%

Annual 100%
-Works underway
29. Improvement of the Ngolbang-Zoétélé road (13 km+ Zoétélé highways)2 067 49425 000DR/SDIR-PIBAggregate 100%

Annual: 0%
-Additional works-contract amendment pending signature-Works completed and received

-contract amendment pending signature for additional works
30. Tarring of the Bachuo Akagbe-Mamfe road

(21 km, with a bridge over 100 m)
6 579 5221 000 000DR/SDIR-PIBAggregate: 100%

Annual: 90%
-arrears amounting to 4 344 252 to be paid-contract amendment awaiting signature-Works completed and received

-arrears being paid
31. Tarring of Buea and Kumba streets5 567 000283 000DR/SDIR-PIB100%-Unpaid bills to the contractorSettlement of outstanding bills scheduled for le 30/05/03-Works completed and received
I.2.4 - PROJECTS FINANCED BY LOCAL FUNDS TO ENGAGE IN 2004
32. Reconstruction of the Yaound-Soa road (10,5 km)93152152 200 000DR/SDIR-PIB0%-Insufficient finances budgeted in 2002 and 2003 leading to the withdrawal of the contractor on 30/05/03-File sent to

PM
2 billion set aside at CAA

-200 million transferred to PMG for settling expropriation compensation
33. Tarring of the Awae-Esse-Soa road (80 km)16 000 000500 000DR/SDIR-PIB0%- insufficient finances in 2003-File sent to au PRC, PM

and MINEPAT in January2003
-TF available

-search for finances

-Works yet to start
34. Improvement of the Obala-Batchenga-Nanga Eboko-Bouam road (192 km over 264 km)18 000 000Total:600 000DR/SDIR-PIB0%-Insufficient finances in 2003-File sent to PRC, PM

and MINEPAT in January2003
-Works yet to start
35. Reinforcement of the Mutengene-Kumba road (78 km)Tx: 12 568 018

Cle: 494 733

Total: 13 062 751
Exp: 20 000

Tx: 240 000

Total: 520 000
DR/SDIR-PIBAggregate 0%-Insufficient budgeted finances since 2000-File sent to PM end February 2003 for search of funds-Works yet to start

Future financing to be covered by PIB
36. Improvement of the Bafoussam-Bamendjou-Nkamna-Bangou road300 000Total:DR/SDIR-PIB0%- insufficient finances in 2003-Works yet to start
TOR: Terms of Reference; CCF: Company Consultation File; TF: Tender file; TB: Tender Board; SO: Service Order; AFD: French Development Agency; IDB: IslamicDevelopment Bank; KFW: Kreditanstalt Fr Wiederaufbau; EDF: European Development Fund; ADB: African Development Bank
TOR: Terms of Reference; CCF: Company Consultation File; TF: Tender file; TB: Tender Board; SO: Service Order; AFD: French Development Agency; IDB: IslamicDevelopment Bank; KFW: Kreditanstalt Fr Wiederaufbau; EDF: European Development Fund; ADB: African Development Bank
ACTIVITIÉS PROGRAMMÉDCOST

(IN 000 FCFA)
FINANCES

ALREADY

ENGAGED
FINANCES TO

MOBILIZE

PIB 2003
OFFICIALSSOURCES OF

FINANCING
LEVEL OF

EXECUTION
PROPOSED

SOLUTIONS
OBSERVATIONS
II- MECHANISED MAINTENANCE AND PROTECTION (ROUTINE AND PERIODICAL MAINTENANCE ACCORDING TO NETWORK)
II.1 -PRIORITY NETWORK (21 595 KM)
II.1.1-TARRED ROADS (4 300 km)
II.1.1.1 - ROUTINE AND ET PERIODICAL MAINTENANCE OF TARRED ROADS (3 360 km)
II.1.1.1.1 -WORKS
North network (1 009 km)3 678 200DR/SDR

DPTP/SR
RF PERFED28%Scarcity of gravel, insufficient material resourcesAnnual maintenance works (413 000) only started on 1er October 2003
ADAMAWA (57 km)260 448DR/SDR

DPTP/SR
RF

PERFED
49%Delay of 5,5 monthsWorks stopped in August 2003 due to heavy rains
NORTH (270.5 km)970 332DR/SDR

DPTP/SR
RF

PERFED
62%Scarcity of gravel, and insufficient material resourcesWorks underway
FAR NORTH (409.65 km)2 857 127DR/SDR

DPTP/SR
RF

PERFED
34%Scarcity of gravel and insufficient material resourcesWorks underway

The two initial contractors only started on 1st October 2003.

The two other work sites closed in August 2003 because of rainfall
West network (417 km+works following the collapse of the BANA pass)4 064 696DR/SDR

DPTP/SR
RF

PERFED
72%-Scarcity of gravel - heavy rainsRF= 2 411 000 EDF= 1 910 000 Completed works: 2 Works underway: 4
LITTORAL (147.9 km)1 736 533DPTP/SR

SUBTP
RF

PERFED
75%NONETC1 received: 2 projects
NORTH-WEST (147 km)1 548 338DPTP/SR

SUBTP
RF

PERFED
84%NONEWorks on TF underway: 1
WEST

(70 km+(417 km+works following the collapse of the BANA pass)
631 026DPTP/SR

SUBTP
RF

PERFED
50%Deadline expired for collapsing worksWorks underway: 1
SOUTH-WEST (52 km)148 800DPTP/SR

SUBTP
RF

PERFED
100%Works received: 1
South network (888.40 km, of which 60 in the South/Nglbang-Sangmelima; and 279.5 in the South)3 867 010DR/SDR

DPTP/SR
RF

PERFED
86%-Heavy rainsRF= 1 886 666 EDF= 1 355 971 Annual works underway PERFED II triennal projects: works on TF are being received: 5 contracts
II.1.1.1.2 - CONTROL: 1 168 km, 601 882 000 FCFA, executed at 101%, control underway on 5 construction sites
North network437 354450 901DR/SDR

DPTP/SR
RF

PERFED II
78%CONTROLUN DERWAYON TWO SITES
ADAMAwA (57 km)130 418DR/SDR

DPTP/SR
RF

PERFED
66%NONE
NORTH (434 km)DR/SDR

DPTP/SR
RF

PERFED
FAR NORTH (406.9 km)153 725DR/SDR

DPTP/SR
RF

PERFED
90%Control underway
West network156 841156 841DR/SDR

DPTP/SR
RF

PERFED II
97%1 MDC contract cancelled in the SW provinceControl supervised by DPTP/SWControl underway: 1 contract
LITTORAL (147.9 km)DPTP/SR

SUBTP
NORTH-WEST (147 km)156 841DPTP/SR

SUBTP
RF

PERFED
97%NONEControl underway
WEST (km)DPTP/SR

SUBTP
NONE
SOUTH-WEST (52 km)DPTP/SR

SUBTP
South network160 899160 899DR/SDR

DPTP/SR
RF

PERFED II
145%Control underway: 1 contract
CENTRE (608.9 km)160 899DR/SDR

DPTP/SR
RF

PERFED
75%NONEWorks underway
EAST (0 km)DR/SDR

DPTP/SR
0%NONENo project underway
SUD (279,5 km)DR/SDR

DPTP/SR
75%Works underway
II.1.1.1.3 - PROTECTION OF ROADS (4 300 km)
Network North (1 324 km)306 287DR/SDR

DPTP/SR
RF

PERFED
100%Works on second phase partially executed
ADAMAWA (329 km)85 194DPTP/SR

SUBTP
RF100%NONEWorks on second pass received (07 projects)
NORTH (434 km)98 829DPTP/SR

SUBTP
RF100%NONEWorks on first pass received: 2 projects

No second pass: 7 projects
FAR NORTH (514 km)124 265DPTP/SR

SUBTP
RF100%NONEWorks on first pass received No second pass (11 projects)
West network (1 279 km)588 957DR/SDR

DPTP/SR
RF

PERFED
88%Heavy task completed
LITTORAL (538 km)214 546229 766DPTP/SR

SUBTP
RF92%01 contract pending cancellation01 contract to be re-awardedWork on semi-heavy TC2 pass received

Works on first and second minor passes received: 16 projects
NORTH-WEST (141,82 km)98 04596 096DPTP/SR

SUBTP
RF65%NONEWorks received: 10 projects
WEST (579.43 km)235 150449 297DPTP/SR

SUBTP
RF85%NONEWorks on semi-heavy TC2 pass recceived: 11/14 contracts
SOUTH-WEST (221,80 km)87 396108 142DPTP/SR

SUBTP
RF1 00%01 contract cancelledContract re-awardedWorks received: 10 projects
South network ((1 363.6 km)535 247535 247DR/SDR

DPTP/SR
RF

PERFED
100%Works under the current pass: 39/39 received
CENTRE (757 km)314 571314 571DPTP/SR

SUBTP
RF100%NONEWorks under the current pass received: 23 projects
EAST (74,50 km)29 08629 086DPTP/SR

SUBTP
RF100%NONEWorks under the current pass received: 2 projects
SOUTH (532,10 km)191 590191 590DPTP/SR

SUBTP
RF100%01 contract cancelledContract re-awardedWorks under the current pass received: 14 projects
II.1.1.2 -ROUTINE AND PERIODICAL EARTH ROADS (9 935 km)
II.1.1.2.1 -WORKS
North network (2 312 km)3 208 846DR/SDR

DPTP/SR
RF

PERFED
47%-scarcity of source of water- Annual work maintenance (8 contracts, 738,262 million): 12%

-works under TC 2003: 4 trieennal currently executed at 86%

-Works under PERFED II (7 projects): 65%
ADAMAWA (694,5 km)1 567 499DR/SDR

DPTP/SR
RF

PERFED II
76%Works underway: 3 projects Works completed: 4 projects
NORTH (710,55 km)856 919DR/SDR

DPTP/SR
43%01 site stopped, contract period expiredReminder to the cotractor-work site abandoned at 51% of the TC2: 1 project Works about to start: 3 projects Works completed: 1 project
FAR NORTH (821) km)784 429DR/SDR

DPTP/SR
35%Shortage of machines in the region- works under TC2 received: 2 projects

-Works about to start: 4 projects Works underway: 1 project
West network (1 860 km)4 762 068DR/SDR

DPTP/SR
RF

PERFED
52%Heavy rainsRF =4 791 709

EDF=537 851

-works underway: 10

-works underway 5
LITTORAL (343,6 km)625 073DPTP/SR

SUBTP
67%Works underway: 2

Works underway: 1
NORTH-WEST (503,3 km)1 273 643DPTP/SR

SUBTP
NF29%Works underway: 3
WEST (662,82 km)1 644 881DPTP/SR

SUBTP
PERFED II75%01 defaulty contractorContract cancelled and awarded to another companyWorks completed: 2 sites

Works underway: 3 projects

Works suspended: 1 site
SOUTH-WEST (693,05 km)1 475 231DPTP/SR

SUBTP
69%Works underway: 1 site Works completed: 1 site
South network (3 666 km)7 048 351DR/SDR

DPTP/SR
RF

PERFED II
51%Heavy rainsRF=5 242 009

EDF=403 523

Works underway: 22 projects
CENTRE (2 108,5 km)3 378 914DR/SDR DPTP/SR56%Additional works in the contract2 contract amendments signed for an amount of 463 056Works under TF received: 12 projects

TC works underway and annual works underway
EAST (708.05km)2 329 767DR/SDR

DPTP/SR
RF

PERFED II
63%Additional works in the contract triennial: construction of the Kentzou ferryContract amendment signedWorks under TC2 received: 1 project

Works under annual contacts underway: « projects
SOUTH (849 km)1 339 670DR/SDR DPTP/SR32%01 triennial work site closedNotice to defaulting company on 30/09/2003Annual works underway: 5 projects

TC2 works underway: 1 project Contract about to close: 1 work site
II.2.1.1.2.2 - CONTROL (control carried out at 93% for a total amount of 1 639 928 000 by PERFED II programme)
North network437 354450 901DR/SDR

DPTP/SR
RF

PERFEDII
103%1 contract cancelled at DPTP/SWControl assigned to DPTP/SWControl underway: 10 projets
ADAMAWA (780 98 km)148 962DR/SDR

DPTP/SR
RF

PERFEDII
100%Control underway: 10contracts
NORTH (1056.13 km)115 193DR/SDR

DPTP/SR
RF

PERFEDII
100%Control underway
FAR NORTH (659.32) km)173199DR/SDR

DPTP/SR
RF

PERFEDII
100%Control underway
West network456 239RF

PERFED II
86%Control underway: 4 contrats
LITTORAL (272.6 km)105 078DPTP/SR

SUBTP
RF

PERFEDII
61%Control underway
NORTH-WEST (467.47 km)181 293DPTP/SR

SUBTP
RF

PERFEDII
25%Control resumed after cancellation of certain contracts
WEST ( 456.42 km)169 868DPTP/SR

SUBTP
RF

PERFEDII
60%Control resumed after cancellation of certain contracts
SOUTH-WEST (526.35 km)000DPTP/SR

SUBTP
RFControl resumed by DPTP after cancelation of contract with BET
South network746 33592%Control underway: 3 contracts
CENTRE (1 356.47 km)237 696DR/SDR

DPTP/SR
RF99%Control underway
EAST (387.05 km)249 815DR/SDR

DPTP/SR
RF95%Control underway
SOUTH (242.14 km)258 824DR/SDR

DPTP/SR
RF87%Control underway
II.1.1.3 - ROUTINE MAINTENANCE OF RURAL ROADS
II.1.1.3.1 - IDA WORKS
ROUTINE MAINTENACE (1 456 km)DR/CRR

SUBTP
RF80%Works received (01 contract) or closed (01 contract)
PERIODICAL MAINTENANCE (250 km)1 500 000DR/CRR

SUBTP
RF96.92%-works of phase 2 about to start
CENTRE182 462145 211DR/CRR

SUBTP
RF80%Works received (01 contract) or closed (01 contrat)
SOUTH36 31736 317DR/CRR

SUBTP
RF103%Works received
II.1.1.3.2-WORKS
Rural roads (3 895.04 km)2 556 633DR/CRR

SUBTP
RF27.34%-Works underway to start phase 2:

56 projets
Rural roads in the SOUTH (2 407.84 km)1 489132DR/CRR

SUBTP
RF24.18%-Works underway to start phase 2:

32 projects
Rural roads in the WEST (1 487.2 km)1 067 502DR/CRR

SUBTP
RF31.75%-Works underway to start phase 2:

24 projects
II.1.1.3.3 - CONTROL AND SENSITISATION
Rural roads (3 895.04 km)891 152DR/CRR

SUBTP
RF34.5%-Works underway to start phase 2:

56 projects
Rural roads in the South (2 407.84 km)465 025DR/CRR

SUBTP
RF33%-Works underway to start phase 2:

32 projects
Rural roads in the West (1 487.2 km)426 127DR/CRR

SUBTP
RF36%-Works underway to start phase 2:

24 projects
II.2 - WORKS ON NON PRIORITY NETWORKS (Main and rural network: 2 500 km)
II.2.1 - WORKS ON NON PRIORITY NETWORK (Main and rural network: 2 500 km)
Emergency interventions150 000DPTP SUBTPPIBCredits assigned to DPTP for rapid and emergency operations
Special emergency interventions3 600 000DPTP SUBTPPIBCredits assigned for special and emergency operations
CENTRE
Rehabilitation of the NDIKINIMEKI-NINDJE road (36km)56 781056 781DPTP SUBTPPIB100%NONEWorkscompleted
Rehabilitation of the NGONGTOCK-Mawele road (5.5km)2 7662 766100%NONEWorkscompleted
Improvement of the Ahala 2-Afanoyoa-Ebang-Mengong road (15km)25 00025 000100%NONEWorkscompleted
Rehabilitation of the Songbengue—Ngambe-Ninje road (70km)100 000100 000100%Delays due to long distance from the projectWorkscompleted
Rehabilitation of the Akak-Nkobikok road (8.5km)29 93729 937SUBTP-Lekié0%Awaiting invitation to tender
SOUTH
Rehabilitation of the Melangue 1-Ngoazick- Melangue 3—Ofumbi-Mebande roads (38km)84 246

100 000
84 246

100 000
SUBTP-Mvila100%No bill settledWorkscompleted
Rehabilitation of the Bitum-Nkoemvon-Nkoladom road (5km)121 095121 095100%No bill settledWorkscompleted
Rehabilitation of the Bitum road-DJA stretch157 503157 503SUBTP-MYSLA100%No bill settledWorkscompleted
Improvement of farm roads in Meyomessala, lot No. 1156 073156 073100%No bill settledWorkscompleted
Improvement of farm roads in Meyomessala lot No.2104 506104 506
ADAMAWA
Maintenance of the Ngaoundéré

-Bélel road (130 km)
50 00050 000DPTP0%Contract award underway
NORTH
Opening of the DJALINGO-WANGAI-ALINI 2- farm road at the Nigeria borders50 00050 000DPTP0%Elaboration of tender file underway
SOUTH-WEST
Treatment of damaged sections of the Buea-Sasse road (5.5 km) and Muntenguene - Mile 17 road (6.4 km) and weeding7 5007 500DPTP100%Contract for tracing second stretch cancelledPM’s visit to Sasse
NORTH-WEST
Maintenance of the MUTEFF-AKEH road25 00025 000SUBTP-Boyo0%Tnder launched
Maintenance of the Bamenda station-Medankwe-Fon palace road36 56136 561SUBTP-Ndop0%Preparation offender underway
Maintenance of rural roads NP489 971150 000DPTP44%-insufficient means deployed by the cotractor50 000 falls beyond disbursement period 87,5 % of period expired
1.2.2 - SPECIAL EMERGENCY INTERVENTIONS ON STRUCTURES OF THE NON PRIORITY NETWORK (6 OA)
CENTRE
Construction of the FALA bridge in AKOEMAN (40 m)100 000100 000DPTP DR/SDRPIB100%Many additional works2 contract amendments signedWorkscompleted
ADAMAWA
Studies on the reconstruction of the VINA bridge40 00040 000DPTP DR/SDRPIB0%Project near completion
NORTH-WEST
Completiion works on the IBAL bridge, and Babungo-Oku bridge14 17014 170DPTP DR/SDRPIB0%Preparation of tender files underway
Construction of an aquaduct on the Batibo-Widikum road18 95718 957DPTP DR/SDRPIB0%Preparation of tender files underway
Repair works on Mile 37 bridge on the highway RN1122 65622 656DPTP DR/SDRPIB0%Preparation of tender files underway
Development of a sandbank at CBC NKWEN14 17014 170DPTP DR/SDRPIB0%Preparation of tender files underway
Bridges and crossings: 30DPTP DR/SDRPIB
I.2.3 - MAINTENANCE OF STRUCTURES (BRIDGES AND CROOSINGS) (64 TENDERS)
North networkWorks underway
15 tenders97 743 515097 743 515MINTP D.RPIB10%Late awarding of correspondingAcceleration of procedures toFAR-NORTH (2 tenders)
100 530 5910100 530 59110%NORTH (4 tenders)
56 439 476056 439 476RF10%ADAMAWA (2 tenders)
155 491 0650155 491 06510%FAR-NORTH (3 tenders)
112 385 7540112 385 75410%NORTH (4 tenders)
I-4-2 West networkWorks underway
28 tenders104 098 7130104 098 713MINTP D.RPIB10%LITTORAL (4 tenders)
74 843 911074 843 91110%OUEST (4 tenders)
96 074 593096 074 59310%NORTH-WEST (4 OA)
50 328 800050 328 80010%contractsaward contractsSOUTH-WEST (2 tenders)
120 693 3290120 693 329RF10%LITTORAL (5 tenders)
113 419 6310113 419 63110%WEST (6 tenders)
76 639 842076 639 84210%SOUTH-WEST (3 tenders)
1-4-3 South networkWorks underway
21 tenders137 371 5100MINTP D.RPIB10%CENTRE (4 tenders)
83 221 757010%SOUTH (3 tenders)
68 444 794010%EST (3 OA)
135 884 1990RF10%CENTRE (5 tenders)
146 233 652010%SOUTH (3 tenders)
95 902 478010%EAST (3 tenders)
d) MAINTENANCE/ OPERATION OF FERRIES
CENTRE province420 0000420 000DR/SDR

DPTP

SUBTP
PIB100%11 ferries maintained
South province100%2 ferries maintained
East province100%9 ferries maintained
III- MISCELLANEOUS WORKS
III.1 - HIPC PROGRAMME
31.Works under HIPC PROGRAMME (490 km of road in the Centre and South provinces )4 149 360HIPC Multilateral80 %-01 entreprise défaillante

-retard pris dans I’exécution des travaux

-Difficultés de paiement
-marché résilié et attribué à une autre entreprise

-Avenants signés pour la

prolongation des délais des entreprises

(04/06/03) et de la MDC (26/02/03)
Travaux

- 8 marchés sont en cours d’achèvement:

Contrôle

-2 marchés ont été attribués et sont en cours d’achevément
III.2 - SUPERVISION OF NETWORK
Supervision of network Priority network: 26 422 km6 400S/DER DPTP STPBudget MINTP50%Les ressources actuelles ne permettent pas d’attendre les objectifs globaux fixesII y a necessite d’augmenter le budget d’entretienroutierInspection underway
Knowledge of network Non priority network 2 500 KM162 000EDF
Road databank (RDB)81 000Road FundLes informations sur I’Etat du Reseau sont peu disponibles
13 000TOTAL BUDGET RF

22 000 000 000
26 000
Demarcation and location of network with setting up of a ‘geographical information system’ (GIS)100 0000100 000DR/CPROGPIB50%NONEBornage et reperage en cours
ROAD COUNTING159 2510159 251DR/CPROGPIB100%NONEPrestations de la TC1 (campagne 2003) terminées (10 projets)
COUNTING OF DAMAGED SECTIONS71 821071 821DR/CPROGPIB100%NONEPrestations de la TC1 (campagne 2003) terminées (4 projets)
DEFLEXION MEASURES29 319029 319DR/CPROGPIB100%NONEPrestations de la TC1 (campagne 2003) terminées (2 projets)
REINFORCEMENT STUDIES300 6260300 626DR/CPROGPIB0%NONEContrats signés et notifiés aux 4 BET
III.3 - NATIONAL STRATEGY FOR THE PROTECTION OF THE ROAD PATRTRIMONY
Road weighing375 000375 000CISOPRF PIB50%
MANAGEMENT OF RAINGATES48 267048 267SDR-NORTH

DPTP/SR
PIB25%Several raingates in poor conditionSeveral raingates constructed during the first phaseTC1 works (2003 season phase 2)underway

(15 annual projects on the priority network)

(03 triennial projects on the priority network)
MANAGEMENT OF RAINGATES52 319052 319SDR-SOUTH

DPTP/SR
PIB25%Several raingates in poor conditiontSeveral raingates constructed during the first phaseTC1 works (2003 season phase 2)underway

(17 projects on the priority network)
MANAGEMENT OF RAINGATES51 317051 317SDR-WEST

DPTP/SR
PIB25%Several raingates in poor conditionSeveral raingates constructed during the first phaseTC1 works (2003 season phase 2)underway

(17 annual projects on the priority network)

(02 triennial projects on the priority network)
III.4 - PROTECTION OF THE ENVIRONMENT
Road maintenance worksDR/CPE-PIB
construction/rehabilitation of roadsDR/CPEPIB
Supply of the road and environment databank (ROUEN)DR/CPEPIB
Improvement of the knowledges of cadre in matters of environmental sciencesDR/CPEPIB
TrainingDR/CPEPIB
IV- ROAD NETWORK IN TOWNS OF LESS THAN 100 000 INHABITANTS
Distribution of roles among MINTP, MINUH, MINVILLE and the Councils1 000PM

MINTP/CAB, DR
PIB
Identification of towns of less than 100 000 inhabitants1 000PM

MINTP/CAB, DR
PIB
Classification of roads3 000DR

+ Road Subd
PIB
Studies and control of road projects150 000DR

MINTP/CAB, DR, CMM BET/DR
PIB

PIB+ RF + Council Budget
Urban road project for 10 towns
Works2 50 000MINTP/CAB

+CMM Contractor + DR
PIB

B.I.P + F.R

+ Council Budget
For construction and

maintenance works in 10 towns
Identification of classified urban roads15 000DR + DELTP +

Road Subd.
B.I.P
MINSTRY OF MINES, WATER RESOURCES AND ENERGY
Initial allocationCredit transferCurrent allocationEngagement/ExpenditureAmountsTotal expenditureLevel of

expenditure
Level of physical execution,

% (Observations)
Project: Study and follow-up of sector strategy
65 000.000.0065 000.004

925.

575
61 046.0093.9225

Lack of finances to recruit a consultant
4

925.

575
4 866.700
MO928
  • 30 cartridges of ink - tonner E30
4925

.575
  • Car rental and mileage
4

999.

274
4851

043
  • 770 reams of duplicating paper - clairalfa
4988

557
  • Data processing and office equipment for day to day use
4905

.635
  • 20 tonner for HP, 500 envelops GM, 500 medium size envelops, 10 fluorescent lamps, 10 bulbs, 5 dust bins, etc.
4851

.043
  • Data processing and office equipment for day to day use
4855

.155
4992

.047
  • Data processing and office equipment for day to day use
4939

.250
  • 805 reams of duplicating paper, size A4
4984

.071
  • 30 cartridges of ink - tonner E30
4

149.

600
Feasability studies on decentralized networks - BT4 866.700
39 cartridges of ink - tonner E304 149.600
MO960.000
Project: Development of mineral resources
20 000,000.0020 000,00MO1

170
19 776.0098.88Data available
MO1

511,.

7
MO720
MO1

053
MO800
MO1170
MO640
MO480
  • 9 cartridges of ink - HP laser Jet
  • 8 cartridges of ink -Tonner for CANON
  • LBP8I
  • 37 reams of paper - multicopy
  • 5 cartridges of black ink
3546

.850
  • Micro -computers compact Laser printer - 1100 Standing fans
4484.760
Project: Control of quality for petroleum product and water
40 000, 000,0040 000,00Camair air ticket1

752.

3
38 416,0096.04Data available
Camair air ticket1

639.

6
Ink - 202

184.

080
Office equipment + ink - 82

281.

022
MO630
MO876. 3
MO640
MO450
MO206.

8
MO640
MO400
MO400
MO375
4.996.035
4996.035
10 000
CAMAIR air ticket7 737.700
MO13 745.300
  • 300 reams of paper-Clairalfa
  • 270 light file jackets
2651

.300
  • Car rental for inspection of works
3703

.257
  • 150 reams of duplicating paper, size A4
  • 450 reams of paper - Clairfontaine, 80g
  • 100 strap jackets
  • 60 packs of 100 hard file jacket
4996

.035
500 strap file jackets

5000 hard file jackets

676 markers - CONTE
4995

.370
3798

.430
8 cartridges of black ink - HP

8 cartridges of ink - Canon NP3050
2184.080
Stationery2281.022
Project: Preparation, supervision/assessment of projects
MO500,00
MO100,00
MO60,00
MO90,00
MO720,00
Rental for a land cruiser vehicle4 985.400
Typing, duplication, photocopy, binding of documents4 999.964
Project: Inspection of classified establishments
30 000,000,0030 000,00Camair air ticket1611

.627
29 994,0099.9899.98
OM1 053
4993

,925
  • 200 reams of paper - Clair Fontaine 2800
  • Laser
  • 15 registers of 400 pages
  • 30 registers of 500 pages
  • 20 registers of 600 pages
  • 300 Post It -big size
  • 700 color strap file jacket
4933

2.67

3
90 registers of 400 pages

50 registers of 500 pages

50 registers of 600 p
4999

.525
1519

.954
4991

.384


MO
500,

000
MO125,00
MO80,00
MO100,00
MO125,00
Project: Updating of project on rutile, Akonolinga
10 000,000,010 000,00Conference at the Hilton Hotel2 500,002 500,0025
Data available
2000, 00
Car rental4985.400
AIR TICKET7737.700
Car rental4985.400
MO992,00
MO13 745.300
Stationery for geological map including ink - 204 976.792
Project: Human resource development
35 000,000,0035 000,00AIR TICKET350.20034 723.5099.21Data available
25 cartridges of ink - model 4152, 50 black ink HP C4844A, 10 ball pens4919.284
MO120,00
MO384.00
MO300,00
MO4000,000
50 cartridges of black ink - HP C4844

25 cartridges of ink - model 4152
4 919.288
500 reams of duplicating paper - size A4

200 markers - CONTE 159

300 roll of toilet tissue - Sita

100 ball pens
4 975.653
2 buffets, drinks (Champaign, Whisky, Bordeaux wine)
Miscellaneous equipment, installation of SG, 45 bottles of Champaign, 600 whiskies4 999.385
  • Participation fees of seminar in France (Paymaster AMBACAM PARIS)
4

592
  • Participation fees of seminar in France (Paymaster AMBACAM PARIS)
4

592
MO384
MO312
MO742
MO384
MO384
4 999.941
4 999. 385
4 975. 653
Ink - 754 919.288
MO640
MO480
MO300
MO480
MO300
MO200
MO120
MO120
MO120
MO120
MO200
MO300
Project: Information system and databank on website
30 000,000,0030 000,00221 rolls of black tracing paper - DIAZO4989.45929 847,0099.49Data available
MO340,00
Creation of website4 054,900
Training in data processing4 785,694
4 785,894
Office equipment, including ink - 674 940 887
Project: Study on security belt around the petroleum depots
15 000,000,0015 000,004000.0 013 927.5092.85Data available
  • 3 cartridges of black ink -Tonner HP
  • 4 cartridges of black ink -Toner HP
  • 10 cartridges of black ink - HP
1402.559
4985.400
3539.635
Project: Water suppfy in peripheral urban areas and small towns
30 000,000,0030 000,004999.9 8829 811,0099.37
4992. 047
4995.3 70
4866.7 00
Feasability studies for the extension of the water supply system at Messa Mendongo4999.9 88Control of physical execution has not yet taken place due to lack of funds
Maintenance and renovation of the electricity network4

999.98 8
30 cartridges of ink - CANON NP 1550

35 cartridges of ink CANON NP 6012
4 955,725
Project: Control of physical works of projects
20 000,000,0020 000,00
  • MO
625,0019 884,0099.42
  • MO
150,00
MO225,0000
MO625,00
2 670,

750
  • Car rental
4965.2 21
  • Car rental
4998,00
4 985.400
MO640
Project: PIB Follow-Up Unit and PBS
20 000,0010 000,0030 000,00AIR TICKET2964.70029 835,0099.4598,00
MO250,00
MO375,00
MO150,00
MO500,00
4 999.964
MO320
MO276
Other projects
85 000,0085 000,00

+ 60 000,00

(charging to 932 951 credit line)
230 000,00Disbursement of funds - Aids control18 000 000192 188,0083.56Control of physical execution has not yet taken place due to lack of funds
600,00
Air ticket133.600
4866.700
250,00
210,00
8100,00
Maintenance and renovation of the electricity network2995.941
Electrical works at MINMEE4890.440
8000,00
12 cartridges of Tonner ink for Canon printer LBP or HP 92298
500 strap fie jackets

5000 file jackets

676 markers - CONTE
4 995.370
Repair of data processing equipment4997.270
  • Delivery of office equipment
4 014,34 3
Miscellaneous deliveries4 997.680
New Year Wishes ceremony (presents+decorations)4 999.881
Feasability studies of rural electrical networks Ntoude I (Yabassi)4866.7 00
Feasability studies of electrical structures (BT)4 748 000
Feasability studies in KOBA4 866 700
4 866,70 0
Feasability studies of networks in Salapoumbé and Mayo Darle4 866 700
Electrical feasability studies in Nkolmbana-Mvomnam (Lékié)4 866.700
Feasability studies in Ndom I4 866 700
Environmental impact assessment of electrical plants MV/LV4 997 270
Stationery4914 331
4 967.99 0
Ink - 504 999 644
OM742.50 0
Printer + Toner + Ink4 997,36 4
Ink - 464 914.180
4996.035
Car rental4 985.4
Office equipment4 996.035
Miscellaneous deliveries - 215 bottles of Champaign4 973.921
Drinks - 48 Chivas+36 Chateau Giscours4 984.277
4 886.700
Miscellaneous deliveries - 120 Champaign + 72 Chivas4 997.680
Miscellaneous deliveries - 215 bottles of Champaign4 993.921
2 635.023
Repair of vehicle - IT 03114RC4 994.335
Car rental4 999.226
OM18 000
Miscellaneous deliveries
Car rental (Direction Energie)4 995 504
Office equipment4 014 343
Disbursement of funds18 000 000
485 000,00170 000,00655 000,00601 013.9691.75Total projects
Project: Water supply system in Garoua Boulai, Kaélé and Ngaoundéré
50 000,000,0050 000,000,000,000,00
Project Extension of MT network
200 000,000,00200 000,00Automatic assignment of credits to the provinces200 000,00100,00Contract award underway
Projet: Rural electrification
1 317 000,00,001 317 000,0Automatic assignment of credits to the provinces1 317 000100,000,00

Contract award underway
Project: Rural water system
1 035 500,00,001 035 500,01 035 39699.990,00

0,00

Contract award underway
Project: Rehabilitation SCAWATER stations
130 500,000,00130 500,00100,00Control of physical execution did not take place due to lack of funds
Other water and electricity infrastructures
150 000,0090 000,00 (charging to 932 939)240 000,00Maintenance and renovation of the electrical in NKOLNGUET/EVODOULA4999.988186 504,0077.71Control of physical execution did not take place due to lack of funds
Electrification works at Mme MVONDO’s funeral site, Nkolbikogo (Mfou) on Presicam’s instruction4946.823
4992.047
4892.814
Rural electrification at TEKMO (Meyomessala)4962.071
4890.440
4999.644
Feasability studies of rural decentralized networks4866.700
Construction of electricity network of about 0.850km in Bansoa4999.810
740.690
Supply of poles for the electrification of the segment Bertoua-Dondi4950,000
Electrification of OLEMBE via Bengbis4992.522
Potable water supply network in Yaounde (Nkolzie)4985.400
4985.400
Construction of electricity network of about 0.850km in Bansoa4999.810
Extension works on electricity network at DJEUPOH, Bangou Subdivision, West Province4937.920
Construction of electricity network of about 1 km4999.988
Car rental for HIPC control team and others4985.400
Rural elctrification works at Nkolangoung4956.319
Rural elctrification works at BAKOA4956.319
Development of compensating reservoir at Makak4 990.148
4 999,941
Construction of a community sea wall in Dibamba4 997 555
Electrification works in BAKOA4 973 957
Electricity works1 424 400
3-phased power generator4 961 923
Preparation workshop on drilling4 793 799
MO320
MO672
MO270
4 866.700
4 998.433
Repair and supply of spare parts4 998 433
Electrification of Bagba4 998.650
Hydraulic studies and assessment of TSELA nrtwork4 961.636
2 883 000,090 000,002 973 000,02 367 003,076,62Total infrastructures
Project: Fitting up of buildings
200 000,000,00200 000,00Delegate, Ministry of Mines4 777.440199 600,0099.8099.80
Fittng up of the building of the Dpt of Energy

(Electricity and paint)
4 999.287
Fittng up of the building of the Dpt of Energy (Paint)4 996.083
Fittng up of the building of the Dpt of Energy (Repair of roof)4 997.285
Fittng up of the building of the Dpt of Energy (plumbing)4 985.400
Fittng up of the building of the Dpt of Energy (Paint)3 482.658
Fittng up of the building of the Dpt of Energy (Concrete and wood work)4 985.281
Fittng up of the building of the Dpt of Energy3 651.805
4 999.644
4 982.400
20 conference chairs4 985.400
Repair works in the conference hall of MINMEE, floor + paint4 872 635
Repair works in the conference hall of MINMEE, floor + paint4 872 635
4 872.635
Repair works in confernce hall - ceiling with iroko slat4 635 235
Habillement salle de conference du MINMEE4 990.150
Interior trim in the conference hall of MINMEE4 990.150
Wall of the back fence4 436.591
Varnish3 995.822
4 992.400
Repair works in offices of the Dpt of Mines4 970.023
Paint on fence and porter’s lodge - MINMEE4 811 039
Plumbing3 869.620
Improvement of parking lot4 154.500
200 000,000,00200 000,00199 600,0099.80Total works
Expropriation around the Nsam petroleum depot, Yaounde
200 000,000,00200 000,00Tranfer CAA200 000200 000,00100,00Control of physical execution did not take place due to lack of funds
Equipment of services
192 000,000,00192 000,00182 284.8094.94
Vehicles
175 000,000,00175 000,00Repair of vehicle IT 03608RC499.881174 982.5099.9999.99
Repair of vehicle CE 9309B4 998,538
2 00,000
Car rental4 999.999
Car rental4 985.400
Car rental4 999.999
4 999.965
Maintenance and repair of vehicle4 945.656
4 998,000
Repair of vehicle4 999.940
Repair of vehicle CE 9310B4 999.883
4 994.303
Repair of vehicle CE 931 IB4 987.604
Rehabilitation of drilling workshop MINMEE (servicing of 1 engine)4 391.900
4 510.600
4 975.627
3 800,000
Tyres4 510.600
Rehabilitation of drilling workshop MINMEE (servicing of 2 engines)4 391.900
Tyres4 510.600
4 391.900
Repair works in drilling worshop4 793.799
Rehabilitation of drilling workshop (fournitures)4 919.793
Repair of vehicle IT 03608 du Cab3 927.763
4 999.988
Car maintenance4 998
Car maintenance4 940.198
Car maintenance4 998
Maintenance and repair of vehicle CE4 950. 411
Maintenance and repair of vehicle4 940.949
Car spare parts4 975.627
Rehabilitation of drilling workshop4 919.793
Rehabilitation of drilling workshop in the northern provinces4 919.793
Rehabilitation of drilling workshop3 561, 000
Rehabilitation of drilling workshop4 793.799
Degassing of lake Nyos and monitoring of Mount Cameroon
50 000,000,0050 000,004 999.76349 925,0099.85Le contrôle de l’exécution physique n’apas encore eu lieu faute de moyens financiers
4 999.988
4 972.105
4 936.548
775, 000
1 240, 000
775,000
155,000
155,000
4 264. 513
MO880
MO250
MO1 320
MO250
MO330
MO5 000
Acquisition of data processing equipment
40 000,000,0040 000,00Data processing equipment4 991.33539 632,0099.08Le contrôle de l’exécution physique n’apas encore eu lieu faute de moyens financiers
HP2400 printer + ink4 700.520
Computer+ backup battery + ink4 991.335
HP2400 printer + ink4 985.400
HP2400 printer + ink4 991.335
HP2400 printer + ink4 991.335
HP2400 printer + ink4 991.335
HP2400 printer + ink4 991..335
HP2400 printer + ink4 991..335
457 000,000,00457 000,00449 985.0598.47Total Equipement
Electricity Regulation Agency
50 000,000,0050 000,000,000,000,00
Rural electrification Agency
50 000,000,0050 000,0049 99599.9999.99
Organisation and private management for gold collection
100 000,000,00100 000,00Mining craft industry Support Unit75 000,00 099 792,0099.79Le contrôôle de l’exôécution physique n’apas encore eu lieu
4 999.710
Installation CAPAM4999,94 1
Installation CAPAM4 999.941
Ink 104 898.189
Ink 304 893.935
SNEC assistance in the renovation of potable water stations
150 000,000,00150 000,00SNEC transfer150 000150 000,00100100
470 000,000,00470 000,00352 241.5074.95Total Subventions d’investissements
Micro electrification rurale (Japan)
20 000,000,0020 000,00Car rental for visiting delegations4 992,37 719 966,0099.83Le contrôle de l’exécution physique n’apas encore eu lieu faute de moyens financiers
4 993,37 7
Rental of land cruiser vehicle No 125/NA/EMG/20034 985,40 0
Car rental for visiting delegations4 993,377
AEP: Mokolo - Mora line
100 000,000,00100 000,00Tranfer of compensation funds of the rural water supply project to CAA85 726,49 1100 000,00100,00Les donnäes ne sont pas disponibles

Le controle de l’exécution physique n’apas encore eu lieu faute de moyens financiers
Camair air ticket3 172,80 0
OM200
OM1000
4 958.630
Reactivation of water of water points in the North, Adamawa and Far North provinces
100 000,000,00100 000,00Camair air ticket267100 000,00100,000,00
400 Water drillings in 7 provinces (IDB)
80 000,0000,0080 000,00Tranfer by IDB of compensation funds of the rural water supply project to CAA80 000,00 080 000,00100,00100
Water supply SOA (Belgium)
80 000,000,0080 000,000,000,000,00
Rehabilitation of public water pumps in the Sanaga Maritime Division (Belgium)
40 000,000,0040 000,000,000,000,00
Rehabilitation of AEP Maroua (Belgium)
60 000,0060 000,000,00Dotation virée dans l’imputation 901 019 (autres etudes)60 000,00100,000,00
Water supply project in secondary towns
30 000,000,00030 000,004 800.13329 952,0099.840,00
1 000,000
1 350,000
Stationery1 994.327
Camair air ticket5 256,90 0
Camair air ticket1 752.300
Camair air ticket2 104.600
MO1 521.00 0
MO7418.4 00
MO1521,000
MO1521,000
MO1521,000
510 000,0060 000,00450 000,00337 314.3774.96Total Contributions
Arrears
150 000,0050 000,00200 000,004 866.344198 600,0099.30
4 989.636
4 999.997
Restoration of the water supply points: North, Adamawa, Extreme North
100 000.000.00100 000.00Camair airticket267100 000.00100.000.00
400 wells in 7 provinces (DIB)
80 000.0000.0080 000.000Payment of the village water project compensation funds financed by DIB, to the Autonomous Fund80 000.00080 000.000100.00100
SOA Water supply (Belgian Govrnment)
80 000.0000.0080 000.0000.000.000.00
Rehabilitation of Public taps in the Sanaga Maritime (Belgian Government)
40 000.000.0040 000.000.000.000.00
Rehabilitation of the Maroua AEP (Belgian Government)
60 000.00600.00Transferred to the 901019 budget line60 000.00100.000.00
000.00(Miscellaneous studies)
Project for secondary drinking water centres
30 000.000.00030 000.004 800.13329 952.0099.840.00
1 000 000
1 350 000
Supplies1 994 327
Camair airticket5 256 900
Camair airticket1 752 300
Air ticket Camair2 104 600
MO1 521 000
MO7 418 400
MO1 521 000
MO1 521 000
MO1 521 000
510 000.0060 000.00450 000337 314.3774.96Total Contribution
Outstanding dues
150 000.0050 000.00200 000.004 866 344198 600.0099.30
4 989 636
4 999 997
4 925 575
4 925 575
4 999 998
4 999 953
4 625 185
4 973 957
4 930 500
4 950 835
3 749 021
4 998 694
4 999 644
New Year wishes: 216 Champ4 981 957
4 999 758
3 749 553
4 999 644
New Year wishes: Cakes and Hot drinks4 993 129
4 999 975
New Year wishes: 3 buffets4 999 940
4 999 274
MINMEE Press Conference of 7/2/20034 985 723
4 995 015
4 999 924
New Year wishes: Cocktail + Heavy buffets4 999 644
4 688 906
4 686 503
4 999 472
2 444 358
4 992 913
Ink: 204 952 292
Hot drinks: 1744 998 715
2 499 727
3 749 553
Miscellaneous supplies4 999 644
4 990
Supply of assorted fruit drinks2 499 727
1 994 327
Ink: 464 914 130
4 999 644
Ink: 404 984 277
3 902 001
3 749 553
4 886 344
Industrial electricity supply (Lorn Pangar-Nachtigal)
165 000.00150 000.0015 000Transfer to another budget line15 00.000.00 0.00
Rural water project II (HPIC)
2 000 000.00.002 000 000.0Contract NO. 002/A0MINMEE/CMP/03 for the construction of drinking water supply points in CHUNGHE27 223.845114 300.002.54On-the-spot control has not yet been done because of the lack of funds.
Contract No. 001/AOMINMEE/CMP/03 OF 6/5/03 for the construction of drinking water supply points in KURUBEI38 607.175
Budget line 934 132 Rural Electrification II (HIPC)
2 500 000.00.002 500 000.00.000.00Contract award currently going on.
4 665 000.0150 000.004 515 000.0114 300.002.54Overall special projects (HIPC)
10 020 000520 000.009 500 0004 820 057.8850.73Overall total
Sources: Speical financial control unit at MINMEEMINEPAT (DPP/SC)List on the execution PIB, MINFIBKey: MO=Mission Order
Sources: Speical financial control unit at MINMEEMINEPAT (DPP/SC)List on the execution PIB, MINFIBKey: MO=Mission Order
MINISTRY OF THE ENVIRONMENT AND FORESTRY
Previous

Budget line
TitleService

Code
2003

allocation
EngagementsBalanceRateObservations
SettledPendingTotal
901Studies
33-0-901-001Evaluation of PIB projects & functioning30 000 00030 000 00030 000 0000100.00%
33-0-901-003PIB implementation and Preparation25 000 00024 971 24724 971 24728 75398.88%
33-0-901-010Drafting of sectorial strategies15 000 00013 024 4761 975 52415 000 0000100.00%
33-0-901-014Setting up a project data bank30 000 00024 808 3005 191 70030 000 0000100.00%
33-0-901-015PIB + PPBS chain follow up unit25 000 00025 000 00025 000 0000100.00%
33-0-901-016Centralization of the central mail service25 000 00019 850 1384 999 96824 850 106149 89494.40%
33-0-901-103Setting up of local and network and creation of a web site15 000 00010 149 8924 850 10815 000 0000100.00%
33-0-901-105Promoting secondary essences in Cameroon.10 000 00010 000 00010 000 0000100.00%
Sub-total Article 901175 000 000122 832 80651 988 547174 821 353178 64799.90%
902INFRASTRUCTURE
33-0-902-002Rehabilitation of agro-sylvo-pastorial facilities60 000 00060 000 00060 000 0000100.00%
33-0-902-003Rehabilitation of protected areas110 000 000110 000 000110 000 0000100.00%
33-0-902-004Access roads to protected areas110 000 000110 000 000110 000 0000100.00%
Sub-total Article 902280 000 0000280 000 000280 000 0000100.00%
903CONSTRUCTION AND DEVELOPMENT
33-0-903-002Development of edifices124 000 000124 000 000124 000 0000100.00%
33-0-903-003Construction and rehabilitation of forestry posts312 000 000312 000 000312 000 0000100.00%
Sub-total Article 903436 000 0000436 000 000436 000 0000100.00%
Engagements
906EQUIPMENT
AllocationEngagement
33-0-906-100Equipping Offices100 000 0002 890 51197 054 39699 944 90755 09399.94%
33-0-906-200Acquisition of rolling stocks145 000 000145 000 000145 000 0000100.00%
Sub-total Article 906245 000 0002 890 511242 054 396244 94490755 09399.98%
931INVESTMENT SUBSIDIES
33-0-931-104Mvog-Betsi zoo40 000 00040 000 00040 000 0000100.00%
33-0-931-121National School for Water and Forestry, Mbalmayo40 000 00040 000 00040 000 0000100.00%
33-0-931-150Wildlife Conservation Authority15 000 00015 000 00015 000 0000100.00%
Sub-total Article 93195 000 00095 000 000095 000 0000100.00%
932CONTRIBUTIONS
33-0-932-104National Biodiversity Management Programme (GEF, GTZ, Netherlands91 000 00091 000 00091 000 0000100.00%
33-0-932-108Sustainable management of Cameroon forests (ACDI)10 000 00010 000 00010 000 0000100.00%
33-0-932-109Korup Project (GTZ, STABEX)6 000 0006 000 0006 000 0000100.00%
33-0-932-111CIDE (Netherlands)40 000 00040 000 00040 000 0000100.00%
33-0-932-112Development of Mefou reserve20 000 00020 000 00020 000 0000100.00%
33-0-932-113Regional programme for the computerization of environmental management (ACDI)12 000 00012 000 00012 000 0000100.00%
33-0-932-756National environmental management programme (UNDP)50 000 00050 000 00050 000 0000100.00%
33-0-932-121Forestry and Agro-forestry Support (BAD)110 000 000109 375 250109 375 250624 75099.43%
33-0-932-122Community Forest Development Project (UK)20 000 00020 000 00020 000 0000100.00%
33-0-932-123WAZA-LOGONE Project (Netherlands)10 000 00010 000 00010 000 0000100.00%
33-0-932-007Convention on Biodiversity (UNDP)10 000 00010 000 00010 000 0000100.00%
33-0-932-125PROFA Project (Akwaya-Mamfe)80 000 00080 000 00080 000 0000100.00%
33-0-932-126Marine ecosystem, Gulf of Guinea (FAC)15 000 00015 000 00015 000 0000100.00%
Engagements
AllocationEngagements
33-0-932-562Clearing House Mechanism (GTZ)10 000 00010 000 00010 000 0000100.00%
33-0-932-130Ex SITU conservation of tropical forest species in school10 000 00010 000 00010 000 0000100.00%
33-0-932-133PROFOR Project (UNDP)30 000 00030 000 00030 000 0000100.00%
33-0-932-135Conservation of the Meigame Gorilla reserve20 000 00020 000 00020 000 0000100.00%
33-0-932-136Protection of the Ozone layer10 000 00010 000 00010 000 0000100.00%
33-0-032-137OIBT/National Forestry Authority Programme50 000 00050 000 00050 000 0000100.00%
33-0-932-160Community forest management around the Dja North reserve20 000 00020 000 00020 000 0000100.00%
33-0-932-672National Forum of forest products25 000 00025 000 00025 000 0000100.00%
33-0-932-103Conservation and rational exploitation of the forestry ecosystem in Central Africa (ECOFAC)20 000 00020 000 00020 000 0000100.00%
Sub-total Article 932669 000 000668 375 2500668 375 25062475099.91%
330TOTAL1 900 000 000889 098 5671 010 042 943858 49099.95%
MINISTRY OF WOMEN’S AFFAIRS
TITLEAnnual Allocation

(in thousands)
Consumption rate (%)
Supervision of the actual execution of projects2 00091
Finalization and dissemination of the sectorial strategy7 00091
Miscellaneous project study and evaluation8 000100
PIB and DPBS follow up unit3 000100
Legal and co-operation framework with NGOs and Associations for the promotion15 00072
of the woman
Statistics on women’s affairs5 000100
Drafting of an administrative procedure manual20 000100
Integrating gender in development actions, projects and programmes15 00094
Drawing up of periodic reports on the implementation of CEDEF5 000100
Identifying women’s needs and drafting HIPC projects33 00099
Studies on the introduction of NICTs5 000100
Building Edifices134 00099
Equipping internal and external services107 00098
Support to specialized institutions273 000100
Support to the integration of the woman in micro enterprises50 000100
Miscellaneous support to specialized institutions35 000100
Programme to improve rural household income in the Northern provinces20 00095
Poverty reduction and pro-women actions in the Far-North25 000100
Productive micro projects for women10 000100
Sub programme for the promotion of women, gender and development55 000100
Campaign against AIDS15 00088
Informal education of the woman and the girl child15 000100
Gender and Development in the Commonwealth8 000100
Global programme for the promotion of the woman and gender equality65 000100
Outstanding dues for the previous financial year5 000100
MINISTRY OF JUSTICE
Budget lineTitleAllocationPhysical ExecutionEngagementEngagement rateExecution rate
08-901-001Drawing of sectorial strategy15 000 000Drafting terms of referenceCredit transferred100%10%
08-901-006Evaluation of PIB projects & execution20 000 000Drafting technical documents for the construction of the Adamawa Court of Appeal9 998 50049.99%100%
08-901-007Supervision of the physical execution of projects20 000 000Supersion of all court buildings construction works.7 240 000 (8 000 000 transferred)76.20%100%
08-901-009PIB + PPBS chain follow up unit25 000 000PIB execution follow up25 000 000100%100%
08-903-001Development of edifices247 000 000Repairs carried out in the Tibati, Yaounde-Ekounou, Ngoumou, Dla-Bonanjo courthouses and the Guider, Mbengwi, Fumban, Ambam, Bengbis Courts of Appeal and the Chancellery.246 998 42199.99%100%
08-903-002Construction of Court houses1 561 000 000Commissioning of the Yabassi courthouse and the Mungo high court building.1 372 088 08887.90%100%
4 000 000Commissioning of the fence of the Littoral Appeal coirt and the adjoining building of the Yaounde courthouse.100%
95 000 000Nkongsamba High court: construction work has reached the roof.30%
15 000 000Bafia court premises: Tiling of the floor is almost completed. Only painting is remaining.90%
205 000 000Mora court premises: Tying of the upper section of the head office completed. Only the main court room is remaining.20%
43 000 000Batouri court premises: walls have been raised to the level of tying26%
100 000 000Kumbo court premises: the foundation is almost completed10%
Eseka court premises: Walls raised to the level of tying26%
Adamawa court of Appeal: the call for tender has already been launched and award procedure is going on.0%
08-904-001Acquisition of buildingsRenting of Kaele court premises4 000 000100%100%
08-906-001Equipping central servicesContract award procedure going on00%0%
08-906-003Equipping the Court houseEquipment of the Ngoumou and Ambam court house15 000 000100%100%
08-906-004Rolling StocksContract award procedure going on00%0%
08-906-006Computerizing legal proceduresContract signing currently going on00%0%
08-932-001Support to the NGPBAD project compensation funds transferred to the account at CAA73 000 000 (27 000 000 transferred)100%100%
MINISTRY OF AGRICULTURE
ARTICLETITLEAllocation (x1000)Consumption rate (%)AchievementsImpactObservations
901Studies510 00099-organization of a 2 months mission on the monitoring of budget execution and supervision of physical projects -continuation of work on the drafting of the operation framework on the implementation of rural development strategies

-setting up of a PPBS chain in MINAGRI

-launching of some regional development projects
-the control mission played a pedagogic role. Managers pledged to provide information pertaining to budget management and especially to responsibly manage the means put at their disposal

-agricultural programmes and projects are disseminated with more transparency
It is necessary to harmonize budget execution control.



It is necessary to improve on the operational framework and proceed to the drafting of medium term expenditure framework
902Infrastructure315 00098-Experiments on micro-irrigations are continuing in the Centre and Far North provinces

-recovery of loans granted under the micro agricultural and community project is continuing

-creation of small irrigation schemes are continuing

-some construction works are under studies
-some agricultural operators have shown no interest in micro-irrigation

-peasant groups have pledged to reimburse their remaining loans

-Off-season crops are on the rise
The demand for small scale irrigated land is rapidly increasing.
903Construction

And

Development
750 00099-the premises of several rural training centres have been rehabilitated

-construction of provincial and divisional delegations is continuing

-15 agricultural posts are under construction
-improvement of working conditions for staff

-provision of a sedentary lifestyle to people transferred to rural areas
Premises in which field staff is working is in a dilapidated state. About 1300 agric post need to be constructed.
906Equipment510 00098.8-equipping of offices is continuing through the purchase of computers and the increase of internet facilities

-agricultural equipment have been purchased and distributed to farmers
-Personnel computer skills are improving

-several new plantations have been opened as a result of the material distributed
Efforts to continue equipping offices must continue to improve the services of personnel. More regular assistance must be given to farmers
931Investment Subsidies1 090 000100-Training of farmers is continuing

-some private operators who have created groups have been given material assistance
Several subsidized projects are just about to start receiving their subventions.
932Contributions1 325 000100-High-yielding seeds have been provided to some farmers

-research of famine control and early warning systems are continuing

-food aid has been given to less privileged areas

-technical training of farmers is continuing

-extension workers have been given transport facilities

-several projects have started
-better training prospects for farmers in the provinces

-because of better management of food reserves, some peasant in the Northern parts of Cameroon no longer experience hard times due to fluctuations

-Increase in the number of trained farmers due to the increased mobility of training staff.
934HIPC Projects3 000 00054.76-HIPC projects have been launched

-rolling stocks have been purchased

-tenders for phytosanitary products, fertilizers and water pumps have been launched

-programmes to inform and sensitize the beneficiaries have been launched
Because of the difficulties faced in obtaining funds, HIPC programmes and projects have recorded at lot of set back in their take-off.
TOTAL7500 00092.8
TitleAllocationExecution levelAmountExecution rate
Finalization of the initial draft of the individual and family code10 000 000Settled10 000 000100%
Protection of the child: continuation studies in the CE, ES, IT, S provinces20 000 000Pending8 000 00040%
Supervision of the physical execution and evaluation of projects5 000 000-00%
PIB and PPBS chain preparation and follow up unit5 000 000Settled5 000 000100%
Finalization of the sectorial strategy85 000 000Pending55 000 00065%
Draft revision of law No. 83/013 of 21 July 198318 400 000Settled18 400 000100%
Creation of the Ngoundere social centre17 000 000Contract not awarded00%
Creation of the Ngomedzap social centre17 000 000Commissioned17 000 000100%
Creation of the Abong Mbang social centre17 000 000Contract not awarded00%
Creation of the Yagoua social centre17 000 000Commissioned17 000 000100%
Creation of the Douala IV social centre17 000 000Contract awarded00%
Creation of the Touboro social centre17 000 000Contract awarded00%
Creation of the Mbengwi social centre17 000 000Pending00%
Creation of the Bangante social centre17 000 000Contract awarded00%
Creation of the Akom II social centre17 000 000Almost finished17 000 000100%
Creation of the Kumba social centre17 000 000Commissioned17 000 000100%
Creation of the Mfoundi DDAS16 000 000Contract awarded16 000 0000%
Creation of the East DDAS18 000 000Pending00%
Creation of the Littoral DPAS13 600 000Contract awarded00%
Creation of the Mungo DDAS16 000 000Contract awarded00%
Creation of the Sanaga Maritime DDAS16 000 000Contract awarded00%
Creation of the other structures20 000 000Settled and commissioned20 000 000100%
Creation of auxiliary social affairs services55 000 000Commissioned55 000 000100%
Closing of the Djoungolo CRECHE10 000 000Contract awarded00%
ICE BETAMBA equipment7 000 000Contract awarded00%
Bobine d’or13 000 000Commissioned13 000 000100%
Construction of wells (CAED, Nkomo)5 000 000Commissioned5 000 000100%
ICE BETAMBA: construction of classrooms70 000 000Contract awarded00%
Construction of sidewalks: RIB Buea10 000 000Cancelled00%
ICE MAROUA: bovine project10 000 000Commissioned10 000 000100%
Purchase of materials for local workshops10 000 000Commissioned10 000 000100%
CAED Garoua: female underwear and medical equipment5 000 000Commissioned5 000 000100%
CAO Bafoussam: plantation10 000 000Commissioned10 000 000100%
Borstal Institute Buea: Purchase of equipment10 000 000Contract awarded00%
Borstal institute Buea: construction of workshops10 000 000Contract awarded00%
Implementation of the computerized master plan30 000 000Commissioned30 000 000100%
Service equipment77 000 000Commissioned77 000 000100%
Rolling stocks145 000 000Commissioned145 000 000100%
Solidarity loft25 000 000Pending00%
Provision for the payment of outstanding dues30 000 000Pending29 252 00098%
TOTAL885 000 000589 652 00067%
MINISTRY OF TRANSPORT
CodeProject titleInitial AmountAmount consumedActivityExecution level
46-901-004Miscellaneous studies in the transport sector100 000 CFAF100 000 CFAF-Securing vehicle registration certificates 40 000

-Securing transports card (carte bleu) 20 000

-securing driving licences 40 000
Contract has been awarded and the report is expected
46-901-001Drawing up of the MTNTRANSPORTS sectorial strategy100 000 CFAF100 000 CFAF-Consultancy fees 50 000

-Seating allowance 20 000
Contract has been awarded and the sectorial strategy document is expected
46-901-016Sensitization of road users136 000 CFAF136 000 CFAF-Sensitization in the Bafia area 30 000

-Sensitization in Nanga-Eboko 30 000

-Sensitization in Yakadouma 16 000

-Sensitization in Bertoua 30 000

-Sensitization in Edea 30 000
Funds have been sent to the different areas for accident prevention and road safety activities.
46-901-017Studies on the extension of the Ministry of Transport40 000 CFAF40 000 CFAF-Draw up of tender s 10 000

-Architectural plans 20 000

-Geotechnical studies 10 000
Contract awarded
46-902-001Dredging of the Douala Port channel30 000 0002 950 0002 000 000 allocated to PAD for reimbursement on dredging works carried out on the Douala port channel.

950 000 for the rehabilitation of the runway of the Maroua Salak airport
Funds have already been made available to this structure
46-902-102Rehabilitation of the meteorological stations that have not been privatized120 000120 000Ngoundere Station 20 000

Minta Station 30 000

Bamenda Station 50 000

Kumbo Station 20 000
Funds have already been made available for repair works and meteorological equipment
46-903-100Raising the Nsimalen Airport to ASECNA standards550 000550 000Training cost 80 000

Recorder 80 000

Generator 50 000

VSAT 200 000

Service vehicles 30 000

Standard MTO

equipment 9 000

Technical control

and standard monitoring 50 000
Funds have already been made available to the Civil Aviation Authority. Contract awarded
46-903-103Developing edifices225 000225 000Kounkhy divisional office 30 000

Nanga-Eboko divisional office 30 000

Wouri divisional office 15 000

Bamenda provincial service 50 000
Funds have already been made available for repair works
Construction of the main building100 000100 000Internal and external painting works

-Paving the floor

-Waterproofing
Contract awarded Work already done
46-904-103Equipping services360 000360 000Nanga-Eboko divisional service 15 000

Edea divisional service 5 000

Bamenda provincial service 20 000
Funds already made available to these services for the acquisition of equipment and furniture
MINTRANSPORTS

Central services 70 000

Acquisition of pick-ups

for provincial delegates 250 000
Supply contract awarded (computers and split)



Contract awarded and executed
46-906-206Meteo and environmental monitoring80 00080 000Acquisition of weather observation equipmentContract awarded and executed
46-932-153Acquisition of various MMDM-OM equipment80 00080 000Acquisition of VSAT and accessoriesContract awarded and executed
46-933-002Outstanding dues139 000139 000Payment of outstanding dues to CAMI-TOYOTAEngagement already done
46-901-001Evaluation of the actual execution of projects30 00030 000Joint control missionsMission already conducted
46-901-013PIB and PPBS chain follow up unit40 00040 000Follow up of PIB executionFollow up already done

REPORT ON THE EXECUTION OF THE 2003 PUBLIC INVESTMENT BUDGET (MINISTRY OF NATIONAL EDUCATION)

As of 30 November 2003, the PIB level of execution based on engagements, as presented on the table below revealed the following:

  • Allocated budget……………………15 500 000 000 CFAF
  • Engagements………………………..13 954 560 238 CFAf
  • Balance………………………………… 1545 560 238 CFAF
  • Level of execution………………………90%
Budget lineTitleInitial allocationEngagementBalanceExecution level
901Studies550 000 000430 114 467119 885 53378%
903Construction and repairs10 220 000 0009 524 196 476595 803 52494%
905Compensation and expropriation100 000 00076 472 56623 527 43476%
906Equipment2 550 000 0001 907 409 922642 590 07875%
932Contributions1 550 000 0001 486 684 62463 315 37696%
933Outstanding dues530 000 000529 561 707438 29399.99%
Total15 500 000 00013 954 439 7621 545 560 23890%

Details of operations

  • 1 - Line 901: Training
  • Initial allocation…………………………………..550 000 000
  • Engagements……………………………………..430 114 467
  • Balance………………………………………………119 885 533 CFAF
  • Execution rate………………………………………….78%

The table below summarizes the operation details line after line:

Budget lineTitleAllocationEngagementsBalanceExecution rate
901 STUDIES
15-0-901-008Studies and production of prototype using local materials50 000 00050 000 0000100%
15-0-901-010Project follow up and evaluation50 000 00013 213 70036 786 30026%
15-0-901-012Continuation of school map250 000 000250 000 0000100%
15-0-901-015Studies and school construction standards35 000 00035 000 0000100%
15-0-901-018PIB preparation or follow up unit30 000 00030 000 0000100%
15-0-901-019Implementation of PIB preparation10 000 0009 900 76799 23399%
15-0-901-150Sectorial strategy and PDP follow up25 000 000025 000 0000%
15-0-901-444Reinforcing the programming/budgeting capacities25 000 00025 000 0000100%
15-0-901-555Auditing of infrastructures and equipment in EP and ESG75 000 00017 000 00058 000 00023%
Sub-total for studies550 000 000430 114 467119 885 53378%

2 - 903 Construction and Repairs

  • Initial allocation…………………………..10 250 000 000
  • Revised allocation………………………..10 220 000 000
  • Engagements………………………………..9 524 196 476
  • Balance…………………………………………….595 803 524 CFAF
  • Execution rate………………………………………..93%

The table below presents details on the construction and repairs budget line:

Budget lineTitleAllocationEngagementBalanceExecution

rate
903 CONSTRUCTION AND REPAIRS
15-0-903-001Insurance for school buildings600 000 000600 000 0000100%
15-0-903-005Construction of main buildings310 000 000310 000 0000100%
15-0-903-006Repair of ESG1 674 000 0001 674 000 0000100%
15-0-903-008Repair of ENIEG300 000 000300 000 0000100%
15-0-903-011Construction of Government schools4 116 000 0004 099 000 00017 000 00099.99%
15-0-903-013Extension of the MINEDUC building700 000 000128 154 880471 845 12033%
15-0-903-015Construction of DPENs1 350 000 0001 350 000 0000100%
15-0-903-016Repair of edifices300 000 000230 699 36369 300 63777%
15-0-903-018Electricity supply150 000 000113 684 33836 315 66276%
15-0-903-155Construction of DDEN150 000 000150 000 0000100%
15-0-903-415Emergency570 000 000568 657 8951 342 10599.98%
Sub-total Construction and repairs10 250 000 0009 524 196 476595 803 52493%

3 - Line 905 Compensation and expropriation: line 15-0-905-001 “Eviction Compensation”

  • Initial allocation……………………….100 000 000
  • Engagement………………………………..76 472 566
  • Balance……………………………………….23 527 434 CFAF
  • Execution rate……………………………….76.47%

4 - Line 906 Equipment

  • Initial allocation……………………….2 550 000 000
  • Engagement…………………………….1 907 409 922
  • Balance………………………………………647 590 078 CFAF
  • Execution rate……………………………..75%

The table below presents the situation on the line for equipment:

Budget lineTitleAllocationEngagementBalanceExecution

rate
906 EQUIPMENT
15-0-906-003Equipment for ESG400 000 00015 200 000384 800 0004%
15-0-906-005Equipment for EP650 000 000650 000 0000100%
15-0-906-006Rehabilitation of lifts250 000 000250 000 0000100%
15-0-906-008Service equipment300 000 000263 795 12936 204 87188%
15-0-906-009Computer400 000 000399 776 769223 23199.99%
15-0-906-010Rolling stocks250 000 000250 000 0000100%
15-0-906-150Acquisition of backup generator300 000 00078 638 024221 361 97626%
Sub-total Equipment2 550 000 0001 907 409 922642 590 07875%

5 - Line 932 Contributions

  • Initial allocation………………….1550 000 000
  • Engagement………………………..1 486 684 642
  • Balance…………………………………63 315 376 CFAF
  • Execution rate…………………………96%

The table below presents the situation for the line on contributions:

Budget lineTitleAllocationEngagementBalanceExecution rate
932 CONTRIBUTIONS
15-0-932-001Education II (ADB)600 000 000600 000 0000100%
15-0-932-002World Food Programme (compensation)50 000 00050 000 0000100%
15-0-932-266Construction and Equipping of primary schools (Japan)825 000 000792 055 66763 315 37696%
15-0-932-267Education Programme (UNICEF) 1999/200025 000 00025 000 0000100%
15-0-932-271Education Reform Support Programme (PARE)50 000 00050 000 0000100%
Sub-total Contributions1 550 000 0001 486 684 64263 315 37698%

6 - Line 933 Outstanding dues

  • Initial allocation…………………………500 000 000
  • Revised allocation…………………………530 000 000
  • Engagements………………………………..529 561 707
  • Balance……………………………………………438 293 CFAF
  • Execution rate………………………………….99.99%

VI - CONCLUSION

As of 30 November 2003, the volume of engagements made on the PIB 2003 stood at 13 954 479 762 CFAF for the initial allocation of 15 500 000 000 CFAF, an execution rate of 90% and a significant balance of 1 545 560 238 CFAF; rejected vouchers by the Ministry of finance and the Budget stood at 1 101 365 071 CFAF, representing 71% of the balance.

ANNEXE 3: REGIONAL EXECUTION

ADAMAWA PROVINCE

Core area No. 2: Consolidation of growth through economic diversification Rural Development
Measures/ActionsMonitoring indicatorsPeriod of executionLevel of Execution
Increasing access by the peasant population to modern cultural and high yielding techniques through the dissemination of agronomic research findingsNumber of peasant organization that have attained the expected agricultural research resultsPermanentTraining of 65 PO in the manufacture of lime stones, managed and financed entirely by GESEP and UGICETA; and training of 210 OP on the manufacture of improved beehives by PNVRATraining on keeping books; training seminar on the mastery of cooperative and CIG laws sponsored entirely by UGICETA and the GESEP training on the setting up and management of fish ponds (PNVRA)
Promotion of community developmentImplementation of PNDP and PADCPermanentThese projects are not implemented in the Adamawa
Promotion and support to professional and interprofessional development organizationsDrawing up a joint promotion and development strategy for peasant organizationsHanding over to 18 diary farmers (PO) of 3640m of barbed wire. 6 gas cookers and medication sponsored by the State (PIB 2003), through PNVRA at the cost of 19 746 550 F of the 26 micro-projects by PO in infrastructure and equipment.
Number of organizations supportedPermanent
Launching of special priority support programmes to development and the organization of priority areas.Commencement of the implementation of specific programmes2003-PARFAR has appointed personnel but difficulties are encountered in the disbursement of funds for setting up infrastructure and purchasing equipment

-In reality, the programme is conducted on experimental sites of about. 25 hectares in Meiganga, Ngoundere, Ngangassao, on which corn and cassava have been planted. 3 sheepfolds, 3 fish ponds and 3 poultry are being experimented in the above three pilot sites.

-The fight against major food pest is financed by HIPC funds. To date, the Adamawa has mobilized 13 sprayers to give a fresh drive to the village team charged with fighting this phenomenon.
Organization of sensitization seminars in the 10 provinces on the involvement of young graduates in tourist activitiesOrganization of sensitization seminars in the provinces2003-2005-An open day and seminar to sensitize youths on job opportunities were organized

-The different tourist sites were repaired and others are currently going on, especially: Lakes Pagnere, Mbella Assom

The Ngangassoau falls

Construction of DP/AD
Standardize tourist establishments and agenciesNumbers of standardized tourist establishments and agencies2004-2005-Hotels and other establishments

-Restaurant: 2

-Entertainmentfacilities: 8

-Tourist agencies: 9

-Files under study:

-Lodging establishments: 8

-Restauration facilities: 2
Core area No. 4: Building Economic Infrastructure and Developing Natural Resources Development of Telecommunications and Information and Communication Technologies
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Opening of community multimedia centres in the ten provinces

Redesigning school curricula and series in general and technical education as well as in professional school by introducing computer classes
At least ten centres equipped with computer facilities are operationalAs from 2003Purchase of 12 computer for technical schools
Setting up new radio and community television stations in rural areasNumber of television stations createdAs from 2003Creation of a community television centre in Bankim
Intensification of water projects (Wells, developed sources, fountains, small scale water supply networksNumber of structures builtAs from 2003
  • BINIDANG
  • Mayo Boutali-Mayo-Darle
  • Bourkina quarters (Ngaoundere)
  • Mbarang
  • Bontadji-Bekti
  • Allot Mengak
Look for investors in the mining and hydrocarbons sector

Development and extension of rural electrification programmes
Volume of investment carried out

Access rate to electricity in rural areas
Permanent
  • Lanre- Belel
  • Dang-Bini
  • Atta-Nyamboya
  • Dir-Gba Koungue
  • Djohong
  • Tourningal-Ngangassao
  • Djett-Nganha
  • Likok-toubaka-Tello sponsored by HIPC funds
  • Mbe tradition palace sponsored by PIB 2003
  • Tchim-Nyamboya-Dieki sponsored by HIPC funds
  • Allot Ngoum


These are project with real social impact, however, MINMEE projects in the Adamawa since the 2003 budget year have been inexistent.
Increasing the capacity and quality of telecommunication infrastructures (increasing fixed and mobile telephone networks)Number of structures built2003-2005Studies to digitalize the Ngaoundere telephone exchange cnetre
Increase in the coverage of fixed and mobile telephone networks2003-2005
  • - Capacity increase since the passing from 6 to 7 digits
  • - Extension of MTN networks to Ngaoundal, Tibati and Sanyo by December 2004
Setting up new radio and community television stations in rural areasNumber of rural radios createdAs from 2003
Number of television centres createdAs from 2003Creation of a pilot community television centre in Bankim. Tender for its construction has already been launched
Human Resource Management: Making access to power supply easier for all
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Setting up a rational distribution network for cooking gas in the most ecologically fragile areasIdentificationof ecologically fragile areas2003-2005
Rate of access to cooking gas in these areas2003-2005
Extension of the optical fibre installed along the Doba-Kribi pipeline route to Douala and Bafoussam, so as to create a high-speed triangle and make the communication cost for private operators to drop.Actual intallation of the optical fibre in Douala and Bafoussam2003-2004Studies phase had started since 2003
Drawing up and implementation of a marketing policy on the use of the optic fibre2003-2004
Core area No. 6: Reinforcement and Enhancement of Human Resources Other Social Development Policies and Strategies
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Rehabilitation of social centres for the training of handicapped childrenNumber of centres rehabilitated2004Training facilities in public places split up into two educational programmes
Promotion of social services in public places for minors who need social protectionExecution of annual action plan: Number of minors taken care of, trained and integratedPermanent
  • follow up of 48 handicap children
  • Integration of 30 children into the community
  • 3 received professional training
  • 1 provided employment in a professional environment
  • 4 are self-employed under supervision
Promote the development of local initiatives on mutual assistance, support and family welfareDrawing up and implementation of strategies for the promotion and development of local initiativesPermanentA legalized organization of girl mothers has been created

A legalized organization of widows has been created

A call has been made to street children (MATER) who are given a

financial support of 150 000francs

A rehabilitation centre for abandoned children has been subsidized with the sum of200 000frs.
Number of support initiative annuallyPermanent
Implementation of the Education Strategy
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Ensure the effective presence of qualified teachers in all schools, including the most under privileged areasEffective presence of teachersPermanent377part-time teachers have been recruited

90 ENS graduates posted to the Adamawa
Widen the scope of action of the Government in private institutions. (subsidies, posted of teaching staff, improvement of infrastructures)Number of government teachers posted to private institutions2004
Introduce the regular publication of statistical records at all levels of the educational systemPeriodic publication of statistical directory at according to levels2004A directory of professional teachers has been published
Promote access to information and communication technologies in the educational systemNumber of pilot high schools with computer facilities:

Number of students given computer lessons
2004A pilot industrial high school has been opened in our province
Ensure technical, technological and professional training of teachersNumber of training conducted
Number of students trained
Provide computer facilities to universitiesNumber of equipped institutions
Access rate of students to computer lessons
Implementation of the Health Strategy: Fight against Malaria
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Training and organization of refresher courses for health personnel on the handling patients in the health districtAt least 90% of health personnel are given further training on the handling of malariacases2003Nil
Provision of first aid kits to 44 households in the health districtAt least 50% of household have a first aid kit at home2003Not executed
Gradually raise to 80% the number of trained health personnel on the management of malariaAt least 50% of the training institution have a document on the norms of managing malariaAs from 2003Executed. 40% have a document on the norms of managing malaria
Training of members of communication structures and community agents on the techniques of using treated mosquito netsNumber of trained community agents200320 community agents trained
Providing treated mosquito nets to at least 50% of pregnant womenEffective distribution of 150 000 treated mosquito nets in 2002 and commencement of the distribution of 600 000 more nets acquired in 20032003-2004842 women received treated mosquito nets in 2003
Implementation of the Health Strategy: Endemic Emergencies and Catastrophes
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Set up and make an operational national centre and at least two secondary emergency centres.Create national and secondary centres and make mem operational203Not executed
Implementation of the Health Strategy: STI/AIDS
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Promote the use of preservatives among truck drivers, port employees, soldiers and prostitutesPurchase and distribution of condoms2003Estimates: 5 000 000preservatives

Executed: 450 000 preservatives
Create an AIDS counseling and test centre in all provincesNumber of created provincial centres that are operationalEstimates: 2

Executed: 1 centre (Ngaoundere provincial hospital day hospital)
Provide reagents, consumables and ARV to private nonprofit making hospitals.Number of non-profit making private hospital provided with reagents, consumables and ARV2003Estimates: 3private hospitals

Ngaoundere protestant hospital

Ngaoundab protestant hospital

Bankim potestant health centre
Provide HIV/AIDS testing facilities to health centresNumber of sercives, units or blood transfusion centres, blood depots and banks with test facilities for HIV, Hepatitis B and C and syphilis2003Estimates: 15 centres

Executed: 15 health centres
Implementation of the Health Strategy: Fight Against Tuberculosis
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Carry out studies for the construction of a diagnosis and treatment centre that will be operational and capable of handling 50 000 to 100 000 patients in all the provincesStudies available in each province2003Available sample plan
Spread the use of guided techniques in the handling of patients in diagnosis and treatment centresNumber of diagnosis and treatment centres provided with a technical guided for the handling of tuberculosis patients.

Number of tuberculosis cases identified and treated
2003
Equipping diagnosis and treatment centres (CDT) with microscopes mat are in working orderNumber of CDTs with a microscope in working condition20038
Train and organize refresher courses for doctors, nurses, lab technicians handling tuberculosis cases in the existing CDTsNumber of doctors, nurses and lab technicians who have been trained and sent for refresher courses in each existing CDT20032 doctors

2 lab technicians

1 nurse
Draft and adopt a national communication plan on tuberculosisAvailable plan and its operating methods2003BCG-90%

DTC3-69%

VAR-58%
Implementation of the Health Strategy: Extended Immunization Programme (PEV)
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Extend the vaccination coverage to DTC3Vaccination coverage rate2003BGC-90%

BDG-90%

DTC3-69%

VAR-58%
Provide health centres with cooling facilitiesNumber of health centres with operational cooling facilities2003100% of Health centres have cooling facilities
Reinforce the logistics of the vaccination teamsNumber of motorcycles acquired; Number of vaccination teams with motorcycles2003Execution is close to 60%
Implementation of the Health Strategy: Basic drugs, reagents and medical facilities
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Making basic drugs, especially generic ones, available in health centres, as well as reagents and other basic medical facilitiesNumber of health centres with basic drugs, reagents and basic medical facilties200340% of health centres have basic drugs
Drafting and providing health centres with therapy guidesAvailability of guide in health centre2003Available
Drafting and providing all health centres with the national formula on basic drugsNumber of health centres mat have received the national formula on medication2003All health centres have the formula
Implementation of the Health Strategy: Financing of Helath Care
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Drafting of a mutual CodeDrafting, publishing and dissemination of the mutual code2003Not executed
Implementation of the Health Strategy: Mother, Child and Adult Health
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Promoting the vaccination of pregnant women consulted for tetanus infectionsNumber of women consulted and vaccinated against tetanus200390% consulted and vaccinated
Increase the number of deliveries conducted by trained personnelNumber of deliveries handled in the presence of trained personnel200375% of deliveries conducted
Conduct systematic diagnosis of mammary and cervix cancerNumber of mammary and cervix cancers identified and treated2003None identified
Implementation of the Health Strategy: Promoting the integrated handling of children diseases
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Introducing PCIME in all health centresNumber of health districts using the PCIME20033 Health Districts
Train Chief district medical officers and Centre chiefs involved in the PCIMENumber of Chief district medical officers and Centre chiefs that have been trained on PCIME20037 Trained doctors
Implementation of the Health Strategy: Food and Nutrition
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Give children of between 6 months and 5 years vitamin A capsules, two times a yearNumber of children of between 6 months and 5 years who have received vitamin A capsules two times a year2003Currently being executed
Get first class health service to monitor the growth of young childrenAt least 25% of first class health service monitor the growth or young children2003Not executed
Implementation of the Health Strategy: Improving the supply of Services
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Rehabilitation of training centresAt least 25 % of health training centres that have been rehabilitated and made operational200325% executed
Construction of new integrated health centres in health areas that have not been coveredNumber of integrated health centres constructed20035 Integrated health centres
Implementation of the Health Strategy: Management Process
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Train heads of district health services, chief medical officers for hospital districts, sub-directors in central and external services on drafting and management techniques of integrated budgets according to objectivesAt least 25% of heads of district health services, chief medical officers of district hospitals and sub-directors of central and external services trained2003Not executed
Construct service houses for medical officers working in difficult areas.At least 100 service houses constructed for medical officers working in difficult areas2003Not executed
Poverty Reduction in Urban Areas
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Rehabilitation of waste water purification and treatment stationsNumber of rehabilitation stationsAs from 2003No purification station in Ngaoundere became of the lack of service houses
Cleaning the primary drainage networks; rehabilitation of waste water purification and treatment stationsLinear of the drained networkPermanentCleaning of gutters and civil engineering works in 2003for about 5km due to the lack of funds
Rehabilitate basic infrastructures (public road networks and lighting)Rehabilitated linearPermanentDual layer surfacing of the priority urban network: 21 227m2(2003)
Structuring of urban extension zones and secondary urban centresRestructured surface area and drafted development plan2005Proposal to restructure Gadamabanga in 2004
Consolidate the partnership between the State and decentralized administrative units to ensure a better management of townsNumber of urban contract signed and implemented2005No urban contract was signed
Creation of access roads to quarters with poor road networks and restructuring of poorly constructed neighbourhoodsLinear of the rehabilitated or new access road2005Construction of slabs and filling of roads to create access to Gadamabanga (PIB 2003);Plans to restructure Gadamabanga in 2004
Number of poorly constructed neighbourhoods restructured in collaboration with the population2005Restructuring of two quarters in 2004: Burkina and Gadamabanga
Creation of rehabilitation centres for street childrenNumber of street children trained and reintegrated2003-2005
Build waste dumps for the disposal of domestic wastesNumber of waste dumps built2005Project carried forward to 2004: Construction of a waste dump along the Belel road with a surface area of 100 h

CENTRE PROVINCE

Core area No. 2: Reinforcing growth through the Diversification of Economic Activities Development of the Rural Sector
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Increasing access of the peasant population to modern cultural and high-yielding techniques, through the vulgarization of agronomic research results.Number of peasant organizations that have access to agronomic research resultsPermanenta)Assistingpeasant organizations (OP): 2 280 Ops were assisted out of2 397planned, that is 95%

b)Gender approach: 491feminine Ops were assisted out of535 planned, that is 95%

c)Infrastructural and material support: out of 125 requests from OPs from a total of

282 468 580 CFAF:

-76 were funded entirely:

-8 at 70%

-2 at 40%

38 are pending:

Out of the 125 OPs, 30 are for women
Promotion of community developmentImplementation of PNDP and PADCPermanentThe provincial coordination of PADC has just been launched: Selection of the first suppliers is currently going on.

The Provincial coordinator of PNDP has been appointed

Granting of forest concessions: 26 forests have been awarded for a surface area of about 130 000 h.
Promoting and supporting professional and inter-professional development organizationsDrawing up of joint strategies on the promotion and development of peasant organizations;

Number of organizations supported
PermanentCocoa sector

Palmoil sector: 2 055 planters benefited from 180 000 palmoil seedlings;

Banana and plantain sector: out of 3 214 files submitted, 1 973 were selected among which 238 producers are women and 195 CIG. The surface area covered by these plantations stands at 1 824.5 hectares and the amount of rejected bananas distributed stands at 2 553 600

Pineapple sector: A convention was signed on 28 July 2003; selection of bidders has already been done; Two agronomic engineers have already been recruited in the provinces.

They have effectively assumed duty at CETAC
Development of Tourism, Cultural and Support Services to Production: Promotion of Tourist Activities and Cultural Services
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Launching of specific support priority programmes to development and the organization of priority sectors



Make the Forest/Environment sectorial programme (PSFE) operational.
Commencement of the implementation of specific programmes



Implementation of the PSFE
2003-the village palm plantation programme is about to begin

-the B plantation programme has just began

-the phyto programme to distribute 105001 of pesticides has been conducted

(Protection of orchards)

-the Grand Mbam basin project

-NYSAN programme: Finalizing of feasibility studies going on

1-Gradual introduction of ANAFOR

-Instituting law signed

-Officials appointed

-Modalities for the relaunching of activities currently going on (Studies on 4 tenders) 2-PTA drafted and being executed: activity report for first semeter and that of the 2003 financial year available. 2004 PTA drafted.

3-Workshop for capacity on management and communication for DPEF officials.
Finalizing and implementation of the laws on the stabilization fundLaws finalized, published and implemented2003-2004Distribution of forest revenue following that of the previous finance law (10% to the local population. 40% to the community concerned and 50% to the public treasury.
Drafting and implementing a master plan on rural water supplyDrafting and publication of the master plan on rural water supply2003
Implementation of the law on community forestsPublication and dissemination the law20031-adoption of a law on the right to pre-emption

2-enforcing the right to pre-emption within the framework of tender No. 1130/MINEF/SG/DF/SDAFF of15/9/2003for the award of marketing rights

3-Revision of the procedure manual completed (final version and approving authority)

4-Enforcing the law on the exploitation modalities of community forests
Regulate the exploitation of non leguminous forest productsLaw adopted, published and implemented
Improve the periodicity of fishing through the introduction of new species of young fishNumber of young fish introduced
Organize sensitization seminars on the integration of young graduates in tourist activities in the 10 provincesOrganization of sensitization seminars in the provinces2003-2005OPERA TION PHASE

- Choice of topics and presenters

- Planning of field trips to the 10 divisions of the Centre
Standardize tourist establishments and agenciesNumber of tourist establishments and agencies standardized2004-2005STATISTICS

39 tourist establishments;

3 tourist agencies
Core area No. 4: Development of Economic Infrastructures and Natural Resources Development of Telecommunication and Information and Communication Technologies
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Opening of community multimedia centres in the ten provinces Redesigning of school series and currilcula for secondary general and technical education as well as professional training by introducing computer studiesAt least ten centres are already operational Computer facilities availableAs from 2003136 computers are available in two pilot schools: Lycee General Leclerc and Lycee Biligue de Yaounde

Increasing computer facilities in some technical schools (42 computers purchased)
Setting up new radio stations and creating community television centres in rural areasNumber of television centres createdAs from 2003Two radios are already operational in Mbalmayo and Esse. One is currently being created in Nanga
Improving the capacity and quality of telecommunication facilities

(increasing fixed and mobile telephone lines)
Number of projects realized2003-2005Renovation of the Evodoula and Okola telephone facilities Rehabilitation of some CAMTEL exchange centres
Increase of fixed and mobile telephone network coverage2003-2005Effective increase of rural telephone networks (facilities have been repaired), including mobile telephone (Makenene, Matomb, Ndiki, Ayos..)
Number of television centres createdAs from 2003A telephone centre created in Makenene is not yet operational
Natural Resource Management: Making Access to Power Supply Easier for All
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Setting up a rational distribution network for cooking gas in the most ecologically fragile areasIdentificationof ecologically fragile areas2003-2005
  • - Savanna and Steppes areas
  • - Peripheral urban areas
  • - Rural and small urban areas
  • - Improving the feeling capacities of bottles
Rate of access to cooking gas in these areas2003-2005
  • - Supplying the market through importation
  • - Increasing the bottle production capacity
  • - 1% liberalization in progress
Extension of the optical fibre installed along the Doba-Kribi pipeline route to Douala and Bafoussam, so as to create a high-speed triangle and make the communication cost for private operators to drop.Actual intallation of the optical fibre in Douala and Bafoussam2003-2004Installation of the optical fibre between Douala and Yaounde is not yet done
Drawing up and implementation of a marketing policy on the use of the optic fibre2003-2004No policy available
Increasing water projects (Wells, developed sources, fountains small-scale water supply systems)Number of projects realizedAs from 2003
  • - 88 fountains (HIPC 2002 to 2003)
  • - 25 fountains (200 million)
  • - 30 well (195 million)
  • - 3AEP (60 million)
4 APE rehabilitation project (600 million)
Search for investors in the mining and hydrocarbons sector

Develop and extend rural electrification projects
Volume of projects realized Access rate of rural population to electricityPermanent
  • Support to traditional mining activities (CAPAM)
  • - New licences to the petroleum sector
  • - AVAL
  • - 50 localities electrified in 2003 under PIB (400 million)
HIPC 2003: 21 localities (600 million)
Core aarea No. 6: Reinforcement and Enhancement of Human Resources Other Social Development Policies and Strategies
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Rehabilitation of social centres for the training of handicapped childrenNumber of centres rehabilitated2004Auditing conducted and completed in the National Centre foe the Rehabilitation of the Handicap, from 1st October to December 2003 Rehabilitation of the disabled (CNRH) from 1st October to 31 December 2003

Rehabilitation of the main building of the Cameroon Children’s Institute (ICE) in Betamba, completed at the cost of 10 million CFA Provision of basic drugs to the ICE health Unit in Betamba at the cost of 7 million CFA
Promotion of social services in public places for minors who need social protectionExecution of annual action plan: Number of minors taken care of, trained and integratedPermanentIn 2003, theCentre d’Ecouterecorded 800 street children and reintegrate 335 in several domains (school and socio-professional) since October 2003; 5 young children were sent to ICE Betamba and 15 others are undergoing training in various fields.
Promote the development of local initiatives on mutual assistance, support and family welfareDrawing up and implementation of strategies for the promotion and development of local initiativesPermanentFollow up of the organization of 10 solidarity funds in the Nyong and

So ‘o, Mfoundi and Mefou and Akono

Aid grant to local initiative groups worth 5 million

Grant of 40 aid packages for the socio-economic reintegration of families in extreme need and disabled person, worth 1 900 000 CFAF
Number of support initiative annuallyPermanent
Implementation of the Education Strategy
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Setting up in collaboration with UMCEF, UNESCO and NGOs, a means of informing and sensitizing parents and communities on the advantages of educating childrenDrafting and implementation of a joint strategy on the sensitization of parents and communities. Setting up of ad hoc units for the information and sensitization of parents20032 weeks of training in PTA bureaus on the concept of “School a friend to girls” and on the vulgarization of the PTA manual

Existence of 29 “Loving Mother” Associations made up of mothers and young girls

“friend to girls”
Ensure the effective presence of qualified teachers in all schools, including the most under privileged areasEffective presence of teachersPermanentRecruitment of 624 part-timers in August 2003, all holders of the CAPIEMPH
Widen the scope of action of the Government in private institutions.

(subsidies, posted of teaching staff, improvement of infrastructures)
Number of government teachers posted to private institutions2004- Private institutions continue to receive annual operation subsidies

- Draft project on Government/Private education partnership
Introduce the regular publication of statistical records at all levels of the educational systemPeriodic publication of statistical directory at according to levels2004Annual production of statistics directory and a provincial list
Promote access to information and communication technologies in the educational systemNumber of pilot high schools with computer facilities:

Number of students given computer lessons
2004- 2 pilot high schools: Lycee General Leclerc and Lycee Bilingue

- 8 040 students trained each year in the two pilot High schools
Ensure technical, technological and professional training of teachersNumber of training conducted2003-200472 disciplines in the State Universities
Number of students trained200312 827 students
Provide computer facilities to universitiesNumber of equipped institutions2003Information centre for student in all State Universities
Access rate of students to computer lessons2003Average rate: 1 computer to 100 students
Implementation of the Health Strategy: Fight against Malaria
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Training and organization of refresher courses for health personnel on the handling patients in the health districtAt least 90% of health personnel are given further training on the handling of malariacases2003Planned and currently being executed

Number: about 20 in the Centre

Some are about to be reorded
Provision of first aid kits to 44 households in the health districtAt least 50% of household have a first aid kit at home2003Commencement in the Centre province on 25/4/2003

Activity currently going on

• Number: 7 400 + 23 550 to date in the Centre
Gradually raise to 80% the number of trained health personnel on the management of malariaAt least 80% of the training institution have a document on the norms of managing malariaAs from 2003Currently going on
Training of members of communication structures and community agents on the techniques of using treated mosquito netsNumber of trained community agents2003
Providing treated mosquito nets to at least 50% of pregnant womenEffective distribution of 150 000 mosquito nets in 2002 and the commencement of distribution of 600 000 others in 20032003-2004Not executed
Providing treated mosquito nets to at least 50% of pregnant womenEffective distribution of 150 000 treated mosquito nets in 2002 and commencement of the distribution of 600 000 more nets acquired in 20032003-2004842 women received treated mosquito nets in 2003
Implementation of the Health Strategy: Endemic Emergencies and Catastrophes
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Set up and make an operational national centre and at least two secondary emergency centres.Create national and secondary centres and make them operational2003Some documents were drafted and given to district chiefs in the Centre
Implementation of the Health Strategy: STI/AIDS
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Promote the use of preservatives among truck drivers, port employees, soldiers and prostitutesPurchase and distribution of condoms2003More than 341 882 preservatives distribyted
Create an AIDS counseling and test centre in all provincesNumber of created provincial centres that are operational16 centres
Provide reagents, consumables and ARV to private non-profit making hospitals.Number of non-profit making private hospital provided with reagents, consumables and ARV20036
Provide HIV/AIDS testing facilities to health centresNumber of sercives, units or blood transfusion centres, blood depots and banks with test facilities for HIV, Hepatitis B and C and syphilis200316
Implementation of the Health Strategy: Fight Against Tuberculosis
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Carry out studies for the construction of a diagnosis and treatment centre that will be operational and capable of handling 50 000 to 100 000 patients in all the provincesStudies available in each province2003A voluntary diagnosis centre is underconstruction in the Nanga Eboko health district
Spread the use of guided techniques in the handling of patients in diagnosis and treatment centresNumber of diagnosis and treatment centres provided with a technical guided for the handling of tuberculosis patients.

Number of tuberculosis cases identified and treated
200328 diagnosis and treatment centres are operational in the Centre province and all these centres have a technical manual on the handling of tuberculosis
Equipping diagnosis and treatment centres (CDT) with microscopes that are in working orderNumber of CDTs with a microscope in working condition2003All the 28 CDTs have microscopes
Train and organize refresher courses for doctors, nurses, lab technicians handling tuberculosis cases in the existing CDTsNumber of doctors, nurses and lab technicians who have been trained and sent for refresher courses in each existing CDT20039 doctors, 16 nurses and 12 lab technician were trained in 2003
Draft and adopt a national communication plan on tuberculosisAvailable plan and its operating methods2003
Implementation of the Health Strategy: Enlarged Vaccination Programme (PEV)
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Extend the vaccination coverage to DTC3Vaccination coverage rate2003As of September, the vaccination coverage of DTC3 in the province stood at 76.64%
Provide health centres with cooling facilitiesNumber of health centres with operational cooling facilities200322 refrigerators were provided in December 2002. 32 refrigerators and 7 freezers sponsored by HIPC funds, are expected in 2003.
Reinforce the logistics of the vaccination teamsNumber of motorcycles acquired; Number of vaccination teams with motorcycles200322 motorcycles were given to vaccination centres and 30 more are expected in 2003.
Implementation of the Health Strategy: Basic drugs, reagents and medical facilities
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Making basic drugs, especially generic ones, available in health centres, as well as reagents and other basic medical facilitiesNumber of health centres with basic drugs, reagents and basic medical facilties2003Coverage of pharmacies in the province stands at about 90In 2003,229 health centres received a consignment of basic drugs, sponsored by HIPC funds
Drafting and providing health centres with therapy guidesAvailability of guide in health centre2003
Drafting and providing all health centres with the national formula on basic drugsNumber of health centres that have received the national formula on medication2003
Implementation of the Health Strategy: Financing of Helath Care
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Drafting of a mutual CodeDrafting, publishing and dissemination of the mutual code2003Feasibility studies are going on in some districts of the province
Implementation of the Health Strategy: Mother, Child and Adult Health
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Promoting the vaccination of pregnant women consulted for tetanus infectionsNumber of women consulted and vaccinated against tetanus2003129 373 women
Increase the number of deliveries conducted by trained personnelNumber of deliveries handled in the presence of trained personnel2003No indicators available in the province
Conduct systematic diagnosis of mammary and cervix cancerNumber of mammary and cervix cancers identified and treated2003No personnel has been trained under this programme.
Implementation of the Health Strategy: Promoting the integrated handling of children diseases
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Introducing PCIME in all health centresNumber of health districts using the PCIME2003Only 1 pilot health district uses the PCIME
Train Chief district medical officers and Centre chiefs involved in the PCIMENumber of Chief district medical officers and Centre chiefs that have been trained on PCIME20031 Chief district officer

6 Heads of health centres
Implementation of the Health Strategy: Food and Nutrition
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Give children of between 6 months and 5 years vitamin A capsules, two times a yearNumber of children of between 6 months and 5 years who have received vitamin A capsules two times a year2003As of September, 41 500 children of between 6 and 11 months received vitamin A by December 2003
Get first class health service to monitor the growth of young childrenAt least 25% of first class health service monitor the growth or young children2003All health centres implementing the enlarged vaccination programme and monitoring the growth of young children
Implementation of the Health Strategy: Improving the supply of Services
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Rehabilitation of training centresAt least 25 % of health training centres mat have been rehabilitated and made operational2003In 2003, two government schools received funding for rehabilitation and equipment
Construction of new integrated health centres in health areas that have not been coveredNumber of integrated health centres constructed200310
Implementation of the Health Strategy: Management Process
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Train heads of district health services, chief medical officers for hospital districts, sub-directors in central and external services on drafting and management techniques of integrated budgets according to objectivesAt least 25% of heads of district health services, chief medical officers of district hospitals and sub-directors of central and external services trained2003No training carried out in the province
Construct service houses for medical officers working in difficult areas.At least 100 service houses constructed for medical officers working in difficult areas2003Nil
Poverty Reduction in Urban Areas
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Rehabilitation of waste water purification and treatment stationsNumber of rehabilitation stationsAs from 2003Studies carried out in 2004
Cleaning the primary drainage networks; rehabilitation of waste water purification and treatment stationsLinear of the drained networkPermanentStudies carried out in 2004
Rehabilitate basic infrastructures (public road networks and lighting)Rehabilitated linearPermanent1 -Emombo-Nkomo-Kon road (3km)

2-Mvog-Betsi ring road (3km)

3-Obili road (2km)

4-Biym-Assi avenue (2.5km)
Structuring of urban extension zones and secondary urban centresRestructured surface area and drafted development plan2005
Consolidate the partnership between the State and decentralized administrative units to ensure a better management of townsNumber of urban contract signed and implemented2005Currently going on at the Yaounde urban council
Creation of access roads to quarters with poor road networks and restructuring of poorly constructed neighbourhoodsLinear of the rehabilitated or new access road2005Maintenance and rehabilitation of 7 linear roads of 6.3km
Number of poorly constructed neighbourhoods restructured in collaboration with the population2005
Creation of rehabilitation centres for street childrenNumber of street children trained and reintegrated2003-2005Included in the 2004 budget
Build waste dumps for the disposal of domestic wastesNumber of waste dumps built20051 waste dump at Nkolofoulou (Soa)

EAST PROVINCE

Core area No. 2: Reinforcing growth through the Diversification of Economic Activities Development of the Rural Sector
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Increasing access of the peasant population to modern cultural and high-yielding techniques, through the vulgarization of agronomic research results.Number of peasant organizations that have access to agronomic research resultsPermanent1038 producer organizations were trained on the implementation of linear micro projects.

245 producer organizations were supported in their micro-project system

22 producer organizations were supported in the development cassava and piscicultural activities
Promotion of community developmentImplementation of PNDP and PADCPermanentFeasibility studies have been completed; setting up of structures in view
Promoting and supporting professional and inter-professional development organizationsDrawing up of joint strategies on the promotion and development of peasant organizations; Number of organizations supportedPermanent1130 OPs for 2245 producers

Introduction of project for the promotion of professional agriculture (PROMOPA) 330 common initiative groups recorded at the level of the provincial service for COP/GIC
Development of Tourism, Cultural and Support Services to Production: Promotion of Tourist Activities and Cultural Services
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Launching of specific support priority programmes to development and the organization of priority sectors



Make the Forest/Environment sectorial programme (PSFE) operational.
Commencement of the implementation of specific programmes



Implementation of the PSFE
2003Effective start of the Plantain relaunching programme (1 175 support files are under studies

Commencement of cassava production in the Lorn and Djerem and Kadey

Selection offiles for development assistance to slumps is going on Imminent start of the slump project

Acquisition of 246 litres of brustan for the Cocoa/Coffee orchard

Effective start of the CHACIM project in the Beare-Oya and Abong Mbang health district

The national vulgarization programme is continuing its activities and the introduction of 36 infrastructure and support equipment to micro-projects worth 64 608 713 CFAF
Finalizing and implementation of the laws on the stabilization fundLaws finalized, published and implemented2003-2004
Drafting and implementing a master plan on rural water supplyDrafting and publication of the master plan on rural water supply2003
Implementation of the law on community forestsPublication and dissemination the law2003
Regulate the exploitation of non leguminous forest productsLaw adopted, published and implemented
Improve the periodicity of fishing through the introduction of new species of young fishNumber of young fish introduced
Organize sensitization seminars on the integration of young graduates in tourist activities in the 10 provincesOrganization of sensitization seminars in the provinces2003-2005-
Standardize tourist establishments and agenciesNumber of tourist establishments and agencies standardized2004-2005
Core area No. 4: Development of Economic Infrastructures and Natural Resources Development of Telecommunication and Information and Communication Technologies
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Opening of community multimedia centres in the ten provinces



Redesigning of school series and currilcula for secondary general and technical education as well as professional training by introducing computer studies
At least ten centres are already operational



Computer facilities available
As from 2003The Ministry of Communication plans to set up an information mediation centre which has nothing to do with UNESCO

Inclusion into primary, teachers training and general education school programmes

Teaching of computer lessons from form 1 to 5 for secondary schools and in ENIEG.

Providing general and technical schools in the East province with 19 computers
Setting up new radio stations and creating community television centres in rural areasNumber of television centres createdAs from 2003A rural radio is under construction in BOUAM (Lorn and Djerem division)
Natural Resource Management
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Setting up a rational distribution network for cooking gas in the most ecologically fragile areasIdentificationof ecologically fragile areas2003-2005No project carried out
Rate of access to cooking gas in these areas2003-2005No project carried out
Extension of the optical fibre installed along the Doba-Kribi pipeline route to Douala and Bafoussam, so as to create a high-speed triangle and make the communication cost for private operators to drop.Actual intallation of the optical fibre in Douala and Bafoussam2003-2004
Drawing up and implementation of a marketing policy on the use of the optic fibre2003-2004
Number of television centres createdAs from 2003
Increasing water projects (Wells, developed sources, fountains small-scale water supply systems)Number of projects realizedAs from 2003
Search for investors in the mining and hydrocarbons sector Develop and extend rural electrification projectsVolume of projects realized Access rate of rural population to electricityPermanent52 equipped fountains 2 equipped wells

29 fountains built, with 28 having pumps and one abandoned

Restoration of pumps, channel and electric switchboards. In fact, the station

was completely rehabilitated

Acquisition of a new electric pump to replace the one that was stolen

As of 31 December 2003 no fountain had been built. The contractor

scheduled the work for January 2004
Core area No. 6: Reinforcement and Enhancement of Human Resources Other Social Development Policies and Strategies
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Rehabilitation of social centres for the training of handicapped childrenNumber of centres rehabilitated2004Rehabilitation of the welfare centre for minors in Bertuoa (CAMB) is going on
Promotion of social services in public places for minors who need social protectionExecution of annual action plan: Number of minors taken care of, trained and integratedPermanent82 minors were taken care of by 3 rehabilitation centres (AE) in the province (AE1, A/BTA and AE/BRI. Among these minors 18 were sent to school, 6 given professional training and 15 employed
Promote the development of local initiatives on mutual assistance, support and family welfareDrawing up and implementation of strategies for the promotion and development of local initiativesPermanentStrategy implemented as part of the annual action plan
Number of support initiative annuallyPermanent3 private centres receive assistance from the Delegation
Implementation of the Education Strategy
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Setting up in collaboration with UMCEF, UNESCO and NGOs, a means of informing and sensitizing parents and communities on the advantages of educating childrenDrafting and implementation of a joint strategy on the sensitization of parents and communities. Setting up of ad hoc units for the information and sensitization of parents2003There is a provincial coordination committee for the East, made up of female students from 25 friendly schools in Bertuoa and Abong Mbang

Some activities:

Organization of seminars on the training of teachers and at the level of the PTA;

Issuance of birth certificates of students;

Grant of school material;

Provision of desks and tables.

Scholarships to 523 technical high School students, CETIC/SM
Ensure the effective presence of qualified teachers in all schools, including the most under privileged areasEffective presence of teachersPermanentTransfer and redeployment of teachers (harmonization)

Recruitment and transfer of part-timer
Widen the scope of action of the Government in private institutions, (subsidies, posted of teaching staff, improvement of infrastructures)Number of government teachers posted to private institutions2004Posting of Trained teachers to private schools

State subsidy for the 2003financial year
Introduce the regular publication of statistical records at all levels of the educational systemPeriodic publication of statistical directory at according to levels2004Statistical studies with the available information

Production of the ESG and EMAN personnel directory by SAG
Promote access to information and communication technologies in the educational systemNumber of pilot high schools with computer facilities: Number of students given computer lessons2004Setting up of multimedia centres in the Bta Lycee Bilingue and Lycee technique

Gifts of computer facilities to public and private schools by the State and other organizations

Using of the official school programme on computer studies
Ensure technical, technological and professional training of teachersNumber of training conducted2003-2004
Number of students trained2003
Provide computer facilities to universitiesNumber of equipped institutions2003
Access rate of students to computer lessons2003
Implementation of the Health Strategy: Fight against Malaria
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Provision of training and retraining to health personnel in case management in health districtsAt least 90%) of health personnel retrained in case management2003
Ensuring the availability of home management kits in households in 44 health districtsAt least 50%) of households in possession of a home management kit2003
Gradually raising to 80% the rate of health units having a malaria management protocolAt least 80%) of health units have malaria management protocol documentsFrom 2003
Provision of training to members of dialogue structures and community workers in mosquito net impregnation techniquesNumber of community workers trained2003
Provision of insecticide-treated mosquito nets to at least 50% of pregnant womenEffective distribution of 150 000 mosquito nets in 2002 and commencement of distribution of 660 000 others acquired in 20032003-2004
Implementation of the Health Strategy: Endemic Emergencies and Catastrophes
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Set up and make an operational national centre and at least two secondary emergency centres.Create national and secondary centres and make them operational203
Implementation of the Health Strategy: STI/AIDS
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Promote the use of preservatives among truck drivers, port employees, soldiers and prostitutesPurchase and distribution of condoms2003
Create an AIDS counseling and test centre in all provincesNumber of created provincial centres that are operational
Provide reagents, consumables and ARV to private non-profit making hospitals.Number of non-profit making private hospital provided with reagents, consumables and ARV2003
Provide HIV/AIDS testing facilities to health centresNumber of services, units or blood transfusion centres, blood depots and banks with test facilities for HIV, Hepatitis B and C and syphilis2003
Implementation of the Health Strategy: Fight Against Tuberculosis
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Carry out studies for the construction of a diagnosis and treatment centre that will be operational and capable of handling 50 000 to 100 000 patients in all the provincesStudies available in each province2003
Spread the use of guided techniques in the handling of patients in diagnosis and treatment centresNumber of diagnosis and treatment centres provided with a technical guided for the handling of tuberculosis patients.

Number of tuberculosis cases identified and treated
2003
Equipping diagnosis and treatment centres (CDT) with microscopes that are in working orderNumber of CDTs with a microscope in working condition2003
Train and organize refresher courses for doctors, nurses, lab technicians handling tuberculosis cases in the existing CDTsNumber of doctors, nurses and lab technicians who have been trained and sent for refresher courses in each existing CDT2003
Draft and adopt a national communication plan on tuberculosisAvailable plan and its operating methods2003
Implementation of the Health Strategy: Basic drugs, reagents and medical facilities
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Making basic drugs, especially generic ones, available in health centres, as well as reagents and other basic medical facilitiesNumber of health centres with basic drugs, reagents and basic medical facilties2003
Drafting and providing health centres with therapy guidesAvailability of guide in health centre2003
Drafting and providing all health centres with the national formula on basic drugsNumber of health centres that have received the national formula on medication2003
Implementation of the Health Strategy: Financing of Helath Care
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Drafting of a mutual CodeDrafting, publishing and dissemination of the mutual code2003
Implementation of the Health Strategy: Mother, Child and Adult Health
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Promoting the vaccination of pregnant women consulted for tetanus infectionsNumber of women consulted and vaccinated against tetanus2003
Increase the number of deliveries conducted by trained personnelNumber of deliveries handled in the presence of trained personnel2003
Conduct systematic diagnosis of mammary and cervix cancerNumber of mammary and cervix cancers identified and treated2003
Implementation of the Health Strategy: Promoting the integrated handling of children diseases
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Introducing PCIME in all health centresNumber of health districts using the PCIME2003
Train Chief district medical officers and Centre chiefs involved in the PCIMENumber of Chief district medical officers and Centre chiefs that have been trained on PCIME2003
Implementation of the Health Strategy: Food and Nutrition
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Give children of between 6 months and 5 years vitamin A capsules, two times a yearNumber of children of between 6 months and 5 years who have received vitamin A capsules two times a year2003
Get first class health service to monitor the growth of young childrenAt least 25% of first class health service monitor the growth or young children2003
Implementation of the Health Strategy: Improving the supply of Services
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Rehabilitation of training centresAt least 25 % of health training centres that have been rehabilitated and made operational2003
Construction of new integrated health centres in health areas that have not been coveredNumber of integrated health centres constructed2003
Implementation of the Health Strategy: Management Process
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Train heads of district health services, chief medical officers for hospital districts, sub-directors in central and external services on drafting and management techniques of integrated budgets according to objectivesAt least 25% of heads of district health services, chief medical officers of district hospitals and sub-directors of central and external services trained2003
Construct service houses for medical officers working in difficult areas.At least 100 service houses constructed for medical officers working in difficult areas2003
Poverty Reduction in Urban Areas
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Rehabilitation of waste water purification and treatment stationsNumber of rehabilitation stationsAs from 2003
Cleaning the primary drainage networks; rehabilitation of waste water purification and treatment stationsLinear of the drained networkPermanent
Rehabilitation of basic infrastructures (public road networks and lighting)Rehabilitated linearPermanent
Structuring of urban extension zones and secondary urban centresRestructured surface area and drafted development plan2005
Consolidate the partnership between the State and decentralized administrative units to ensure a better management of townsNumber of urban contract signed and implemented2005
Creation of access roads to quarters with poor road networks and restructuring of poorly constructed neighbourhoodsLinear of the rehabilitated or new access road2005Entirely completed
Number of poorly constructed neighbourhoods restructured in collaboration with the population2005
Creation of rehabilitation centres for street childrenNumber of centres created2003-2005Rehabilitation and lighting of 23 km of tarred and 150 km of untarred roads
Number of street children trained and reintegrated
Number of waste dumps built
Build waste dumps for the disposal of domestic wastes2005

FAR NORTH PROVINCE

Core area No. 2: Reinforcing growth through the Diversification of Economic Activities Development of the Rural Sector
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Increasing access of the peasant population to modern cultural and high-yielding techniques, through the vulgarization of agronomic research results.Number of peasant organizations that have access to agronomic research resultsPermanent1289 producer organizations out of 17000 producers, including 39% of women Vulgarization of Senegalese acacia or gum tree for the production of grade A arabica gum

3 fishermen CIG in Maga and 1 women’s smoke-fish CIG in Maga founded on responsible fishing and finance management practices

Training of 3 agro/animal husbandry CIGs

Provision of technology on food cultivation through adaptation of varieties to 60 peasant organizations

30 pilot peasants are trained in 5 different villages and 3500 persons benefit from the programme on the fight against ills of subsistent agriculture in the Lake Chad Basin A pilot village in the Mayo Sava benefit from the promotion of renewable energies and the preservation of flora in arid regions
Promotion of community developmentImplementation of PNDP and PADCPermanent-Basic training to service providers;

-50 villages identified in the Mayo-Sava, Mayo-Danay and Logone et Chari
Promoting and supporting professional and inter-professional development organizationsDrawing up of joint strategies on the promotion and development of peasant organizations;Permanent-Regrouping of CIGs in the Mayo-Sava

-3 CIGs in the MayoKani

-4 fishermen and women smoked-fish CIGs assisted in Maga, as well as the Ouazzang piscicultural organization
Number of organizations supportedPermanent5 organizations supported, this is 93 persons as part of the process to enhance skills in the planning and management of IEC/SR activities and communication for development
Launching of special priority support programmes for the development and organization of priority sectorsCommencement of the implementation of special programmes2003-Reference situation established

-6 groups of CIGs legalized (1200 persons)

-Organigramme of the producers ‘federation approved

-No seminar was organized
Development of Tourism, Cultural and Support Services to Production: Promotion of Tourist Activities and Cultural Services
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Make the Forest/Environment sectorial programme (PSFE) operational.Implementation of the PSFE
Finalizing and implementation of the laws on the stabilization fundLaws finalized, published and implemented2003-2004
Drafting and implementing a master plan on rural water supplyDrafting and publication of the master plan on rural water supply2003
Implementation of the law on community forestsLaw adopted, published and implemented2003
Regulate the exploitation of non leguminous forest productsPublication and dissemination the law
Improve the periodicity of fishing through the introduction of new species of young fishNumber of young fish introduced
Organize sensitization seminars on the integration of young graduates in tourist activities in the 10 provincesOrganization of sensitization seminars in the provinces2003-2005No Seminar was organized
Standardize tourist establishments and agenciesNumber of tourist establishments and agencies standardized2004-2005Authorization to build:

- Hotel Palmier in Kaele

- Hotel Savano in Maroua

- Cachette inn in Amchide Banki

Authorization to operate:

- Hotel Alpha in Maroua

- Hotel Matos in Maroua

2 tourist agencies

-Fatus voyage in Maroua

-Amadtours in Maroua
Core area No. 3: Boosting Private Sector Activities Boosting Private Sector Activities
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Undertake major construction works to provide support to the industrial sector (Wouri Bridge, urban road networks in Douala and Yaounde, integration highways)Identifying priority projects in collaboration with the private sector Mobilization of funds and carrying out of projectsAs from 2003The construction of the Makabaye bridge over the Mayo-Tsananga and the maintenance of the Maroua-Kousseri highway contribute to the development of economic activities in the province. The cooking gas refill station under construction in Maroua will develop the energy needs of the province. Once all these actions are carried out, will contribute to the smooth development of the province, while at the same time fight against poverty
Core area No. 4: Development of Economic Infrastructures and Natural Resources Development of Telecommunication and Information and Communication Technologies
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Opening of community multimedia centres in the ten provinces



Redesigning of school series and currilcula for secondary general and technical education as well as professional training by introducing computer studies
At least ten centres are already operational



Computer facilities available
As from 2003Computer lessons are taught only in 10% of general education schools in the province

16 computers bought for technical secondary schools

This include Lycee technique de Maroua that was equipped with 10 computers of which only three are working presently
Setting up new radio stations and creating community television centres in rural areasNumber of new rural stations createdAs from 2003Nil
Number of television centres createdAs from 2003A community television centre was created in Fotokol (Logone and Chari) in January 2003 The project is currently going on
Natural Resource Management
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Setting up a rational distribution network for cooking gas in the most ecologically fragile areasIdentificationof ecologically fragile areas2003-2005The entire province
Rate of access to cooking gas in these areas2003-2005A domestic refilling station under construction
Extension of the optical fibre installed along the Doba-Kribi pipeline route to Douala and Bafoussam, so as to create a high-speed triangle and make the communication cost for private operators to drop.Actual intallation of the optical fibre in Douala and Bafoussam2003-2004
Drawing up and implementation of a marketing policy on the use of the optic fibre2003-2004
Improving the capacity and quality of telecommunication infrastructures (increasing fixed and mobile telephone lines)Number of projects realized2003-2005-the telephone wire network in Maroua have been rehabilitated-the rehabilitation of a rural telephone network in Mora, Waza and Salak is goingon
Increasing the coverage of both fixed and mobile telephones2003-2005-the Yagoua region is provided with mobile telephone coverage by Orange-MTN extended its telephone network coverage in 2003 to Maroua and its environs
Increasing water projects (Wells, developed sources, fountains small-scale water supply systems)Number of projects realizedAs from 20032764fountains, 2247modern wells and 16 dams were constructed
Search for investors in the mining and hydrocarbons sector Develop and extend rural electrification projectsVolume of projects realized Access rate of rural population to electricityPermanentAccess rate in the province is 6%
Core area No. 6: Reinforcement and Enhancement of Human Resources Other Social Development Policies and Strategies
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Rehabilitation of social centres for the training of handicapped childrenNumber of centres rehabilitated2004Nil
Promotion of social services in public places for minors who need social protectionExecution of annual action plan: Number of minors taken care of, trained and integratedPermanentMany actions aimed at protecting children, rehabilitating minors, psychological and social guidance to the family and young girls, were undertaken in the social centres
Promote the development of local initiatives on mutual assistance, support and family welfareDrawing up and implementation of strategies for the promotion and development of local initiativesPermanentDevelopment of local initiatives were encouraged

Many NGOs are working in this direction: AFEP, AGIR
Number of support initiative annuallyPermanentNone by the MINAS delegation
Implementation of the Education Strategy
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Setting up in collaboration with UNICEF, UNESCO and NGOs, a means of informing and sensitizing parents and communities on the advantages of educating childrenDrafting and implementation of a joint strategy on the sensitization of parents and communities. Setting up of ad hoc units for the information and sensitization of parents2003Ad hoc units for the information and sensitization of parents exist within the framework of the PTA
Ensure the effective presence of qualified teachers in all schools, including the most under privileged areasEffective presence of teachersPermanentAt the beginning of each school year, PIP go to the field to ascertain the effective resumption and presence of teachers. More than 90% of teachers are on duty
Widen the scope of action of the Government in private institutions, (subsidies, posted of teaching staff, improvement of infrastructures)Number of government teachers posted to private institutions2004
Introduce the regular publication of statistical records at all levels of the educational systemPeriodic publication of statistical directory at according to levels2004The service in charge of prospection produces the statistics directory at all levelsand it is presently at its data collection phase. Information sheets have already been distributed on the field
Promote access to information and communication technologies in the educational systemNumber of pilot high schools with computer facilities: Number of students given computer lessons2004The Maroua Lycee Classique was selected for this purpose, but has no equipment yet. It is difficult ot determine the number of children trained as the courses are mainly theoretical
Ensure technical, technological and professional training of teachersNumber of training conducted
  • - Practicals: overseeing of European and Cameroonian trainees
  • - Continuous training of rural development official on participative diagnosis and local planning
Number of students trained30 Cameroonian trainees

9 European trainees

60 rural instructors
Provide computer facilities to universitiesNumber of equipped institutions1
Access rate of students to computer lessons100%
Implementation of the Health Strategy: Fight against Malaria
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Training and organization of refresher courses for health personnel on the handling patients in the health districtAt least 90% of health personnel are given further training on the handling of malaria cases2003Currently going on
Provision of first aid kits to 44 households in the health districtAt least 50%) of household have a first aid kit at home2003Nil
Gradually raise to 80% the number of trained health personnel on the management of malariaAt least 80% of the training institution have a document on the norms of managing malariaAs from 2003Currently going on
Training of members of communication structures and community agents on the techniques of using treated mosquito netsNumber of trained community agents2003
Providing treated mosquito nets to at least 50%) of pregnant womenEffective distribution of 150 000 mosquito nets in 2002 and the commencement of distribution of 600 000 others in 20032003-2004Currently going on
Implementation of the Health Strategy: Endemic Emergencies and Catastrophes
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Set up and make an operational national centre and at least two secondary emergency centres.Create national and secondary centres and make them operational2003
Implementation of the Health Strategy: STI/AIDS
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Promote the use of preservatives among truck drivers, port employees, soldiers and prostitutesPurchase and distribution of condoms2003Distribution going on
Create an AIDS counseling and test centre in all provincesNumber of created provincial centres that are operational2
Provide reagents, consumables and ARV to private non-profit making hospitals.Number of non-profit making private hospital provided with reagents, consumables and ARV20036 hospitals in (Tomokombere, Pette, Zidim, Meskini, Koza, CNPS Maroua)
Provide HIV/AIDS testing facilities to health centresNumber of services, units or blood transfusion centres, blood depots and banks with test facilities for HIV, Hepatitis B and C and syphilis2003All hospitals
Implementation of the Health Strategy: Fight against Tuberculosis
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Carry out studies for the construction of a diagnosis and treatment centre that will be operational and capable of handling 50 000 to 100 000 patients in all the provincesStudies available in each province2003Studies available
Spread the use of guided techniques in the handling of patients in diagnosis and treatment centresNumber of diagnosis and treatment centres provided with a technical guided for the handling of tuberculosis patients. Number of tuberculosis cases identified and treated200314 diagnosis and treatment centre with a clinical guide on the management of tuberculosis



1374 cases of diagnosis and treatment
Equipping diagnosis and treatment centres (CDT) with microscopes that are in working orderNumber of CDTs with a microscope in working condition200314 CDTs with a microscope in working condition
Train and organize refresher courses for doctors, nurses, lab technicians handling tuberculosis cases in the existing CDTsNumber of doctors, nurses and lab technicians who have been trained and sent for refresher courses in each existing CDT200311 doctors 17 nurses20 laboratory technicianstrained under the implementation of the PNLT
Draft and adopt a national communication plan on tuberculosisAvailable plan and its operating methods2003Nil
Implementation of the Health Strategy: Extended Immunization Programme (PEV)
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Extend the vaccination coverage to DTC3Vaccination coverage rate200375%
Provide health centres with cooling facilitiesNumber of health centres with operational cooling facilities2003
Reinforce the logistics of the vaccination teamsNumber of motorcycles acquired; Number of vaccination teams with motorcycles2003Nil
Implementation of the Health Strategy: Basic drugs, reagents and medical facilities
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Making basic drugs, especially generic ones, available in health centres, as well as reagents and other basic medical facilitiesNumber of health centres with basic drugs, reagents and basic medical facilties2003All health centres are operational
Drafting and providing health centres with therapy guidesAvailability of guide in health centre2003
Drafting and providing all health centres with the national formula on basic drugsNumber of health centres that have received the national formula on medication2003
Implementation of the Health Strategy: Financing of Helath Care
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Drafting of a mutual CodeDrafting, publishing and dissemination of the mutual code2003
Implementation of the Health Strategy: Mother, Child and Adult Health
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Promoting the vaccination of pregnant women consulted for tetanus infectionsNumber of women consulted and vaccinated against tetanus200397 120 representing 68.3% of expected pregnant women
Increase the number of deliveries conducted by trained personnelNumber of deliveries handled in the presence of trained personnel2003
Conduct systematic diagnosis of mammary and cervix cancerNumber of mammary and cervix cancers identified and treated2003
Implementation of the Health Strategy: Promoting the integrated handling of children diseases
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Introducing PCIME in all health centresNumber of health districts using the PCIME2003Nil
Train Chief district medical officers and Centre chiefs involved in the PCIMENumber of Chief district medical officers and Centre chiefs that have been trained on PCIME2003Nil
Implementation of the Health Strategy: Food and Nutrition
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Give children of between 6 months and 5 years vitamin A capsules, two times a yearNumber of children of between 6 months and 5 years who have received vitamin A capsules two times a year200375% coverage
Get first class health service to monitor the growth of young childrenAt least 25% of first class health service monitor the growth or young children200350%
Implementation of the Health Strategy: Improving the supply of Services
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Rehabilitation of (raining centresAt least 25 % of health training centres that have been rehabilitated and made operational200380%

8 health centres rehabilitated (PIB)
Construction of new integrated health centres in health areas mat have not been coveredNumber of integrated health centres constructed20037 new integrated health centres (CSI) constructed
Implementation of the Health Strategy: Management Process
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Train heads of district health services, chief medical officers for hospital districts, sub-directors in central and external services on drafting and management techniques of integrated budgets according to objectivesAt least 25% of heads of district health services, chief medical officers of district hospitals and sub-directors of central and external services trained2003
Construct service houses for medical officers working in difficult areas.At least 100 service houses constructed for medical officers working in difficult areas2003
Poverty Reduction in Urban Areas
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Rehabilitation of waste water purification and treatment stationsNumber of rehabilitation stationsAs from 2003None
Cleaning the primary drainage networks; rehabilitation of waste water purification and treatment stationsLinear of the drained networkPermanentAbout 15 km of network drained
Rehabilitation of basic infrastructures (public road networks and lighting)Rehabilitated linearPermanentAbout 12 km of road networks
Structuring of urban extension zones and secondary urban centresRestructured surface area and drafted development plan2005About 45 km2structured
Consolidate the partnership between the State and decentralized administrative units to ensure a better management of townsNumber of urban contract signed and implemented2005Nil
Creation of access roads to quarters with poor road networks and restructuring of poorly constructed neighbourhoodsLinear of the rehabilitated or new access road2005A bout 18 km
Number of poorly constructed neighbourhoods restructured in collaboration with the population200520 neighbourhoods reorganized
Creation of rehabilitation centres for street childrenNumber of centres created2003-20058 centres created and operating fairly well
Number of street children trained and reintegrated250 children
Build waste dumps for the disposal of domestic wastesNumber of waste dumps built2005Only one waste dump built
Littoral Province Core area No 2.: Reinforcing growth through the Diversification of Economic Activities Development of the Rural Sector
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Increasing access of the peasant population to modern cultural and high-yielding techniques, through the vulgarization of agronomic research results.Number of peasant organizations that have access to agronomic resultsPermanent6090 producers from 400 OPs were supervised in their technical domain of activities throughout the period.

84% organ. 11% Marketing. 2.4% and environment 2.5%

- The vulgarization of 13 AVZ, 2 TS and funds worth 986 000 CFAF in the Ndom and Ngambe area in the Sanaga-Maritime division, was given to the NGO, FEMEC.

-2 engineers were provided to CETAM to spread pineapple techniques
Promotion of community developmentImplementation of PNDP and PADCPermanent2 community forests are operational

3 communty forests have been reserved
Promoting and supporting professional and inter-professional development organizationsDrawing up of joint strategies on the promotion and development of peasant organizations;Permanent-2 engineers were provided to CETAM to spread pineapple techniques. These temporary workers receive salaries and allowances worth 144 000 F per month and regular training

- The vulgarization of 13 AVZ, 2 TS and funds worth 986 000 CFAF in the Ndom and Ngambe area in the Sanaga-Maritime division, was given to the NGO, FEME, by PNVRA



77 requests for assistance were received by CPSA to the tune of 200 027 474 CFA. PNVRA subsidies are evaluated at 160 768 1 70 CFAF. The funds disbursed, worth 62 441 570 CFA, made it possible to offer infrastructures and equipment to 37 OPs.



9 Professional organizations (OP) are being monitored
Development of Tourism, Cultural and Support Services to Production: Promotion of Tourist Activities and Cultural Services
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Launching of specific support priority programmes to development and the organization of priority sectorsCommencement of the implementation of specific programmes2003Programme to revamp the plantain production (PRFP) 5 programmes and projects created
Make the Forest/Environment sectorial programme (PSFE) operational.Implementation of thePSFE
Organize sensitization seminars on the integration of young graduates in tourist activities in the 10 provincesOrganization of sensitization seminars in the provinces2003-2005
Standardization of tourist establishments and agenciesNumber of tourist establishments and agencies standardized2004-2005Three tourist sites have been constructed or under construction.

Creation of access roads to the twin lakes Manenguba and the Ekom-Nkam falls is going on.

Creation of an access road to the Yoyo beach is completed
Core area No. 3: Stimulating Private Sector Activities Stimulating Private Sector Activities
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Undertake major construction works to provide support to the industrial sector (Wouri Bridge, urban road networks in Douala and Yaounde, integration highways)Identifying priority projects in collaboration with the private sector Mobilization of funds and carrying out of projectsAs from 2003A good number of roads in Douala are being rehabilitated (Camp Bertaud Street, Bessengue gare Street, Decage Street)

The contract for the rehabilitation of the Wouri bridge has been signed. It effectively took off on 18 March 2004
Core area No. 4: Development of Economic Infrastructures and Natural Resources Development of Telecommunication and Information and Communication Technologies
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Opening of community multimedia centres in the ten provinces Redesigning of school series and currilcula for secondary general and technical education as well as professional training by introducing computer studiesAt least ten centres are already operational Computer facilities availableAs from 2003Provision of computer halls in technical high schools in partnership with French institutions.Provision of 34 complete computers by MINETFOB
Improving the capacity and quality of telecommunications infrastructures (Increasing the numer of fixed and mobile telephone lines)Number of projects realized2003-2005
Increase in the coverage of fixed and mobile telephone lines2003-2005
Setting up new radio stations and creating community television centres in rural areasNumber of new rural stations createdAs from 2003
Number of television centres createdAs from 2003
Natural Resource Management
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Setting up a rational distribution network for cooking gas in the most ecologically fragile areasIdentification of ecologically fragile areas2003-2005
Rate of access to cooking gas in these areas2003-2005
Extension of the optical fibre installed along the Doba-Kribi pipeline route to Douala and Bafoussam, so as to create a high-speed triangle and make the communication cost for private operators to drop.Actual intallation of the optical fibre in Douala and Bafoussam2003-2004
Drawing up and implementation of a marketing policy on the use of the optic fibre2003-2004
Increasing water projects (Wells, developed sources, fountains small-scale water supply systems)Number of projects realizedAs from 2003The last report was drafted in November 2003 when no funds were allocated
Search for investors in the mining and hydrocarbons sector Develop and extend rural electrification projectsVolume of projects realized Access rate of rural population to electricityPermanent
Core area No. 6: Reinforcement and Enhancement of Human Resources Other Social Development Policies and Strategies
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Rehabilitation of social centres for the training of handicapped childrenNumber of centres rehabilitated2004Bepanda rehabilitation and observation centre. 10% of projects available; Douala Home workshop (15%) sponsored by French cooperation. Projects available
Promotion of social services in public places for minors who need social protectionExecution of annual action plan: Number of minors taken care of, trained and integratedPermanentIdentification process for the location of street children and other commited groups. About 1600 children have been identified in the town of Douala
Promote the development of local initiatives on mutual assistance, support and family welfareDrawing up and implementation of strategies for the promotion and development of local initiativesPermanentCommunity programme for the management of the less privileged (solidarity funds) is going on
Number of support initiative annuallyPermanentProvision of technical assistance to 10 private institutions. Financial assistance granted to 4 private social services to the tune of 300 000 CFAF per institution
Implementation of the Education Strategy
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Ensure the effective presence of qualified teachers in all schools, including the most under privileged areasEffective presence of teachersPermanentRecruitment of qualified teachers from ENIEG
Widen the scope of action of the Government in private institutions. (subsidies, posted of teaching staff, improvement of infrastructures)Number of government teachers posted to private institutions2004Posting of government trained teachers to private schools
Introduce the regular publication of statistical records at all levels of the educational systemPeriodic publication of statistical directory at according to levels2004Work carried out at the provincial levels by the forecasting service
Promote access to information and communication technologies in the educational systemNumber of pilot high schools with computer facilities: Number of students given computerlessons2004Two wouri
Ensure technical, technological and professional training of teachersNumber of training conducted

Number of students trained
Provide computer facilities to universitiesNumber of equipped institutions

Access rate of students to computer lessons
Implementation of the Health Strategy: Fight against Malaria
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Training and organization of refresher courses for health personnel on the handling patients in the health districtAt least 90%) of health personnel are given further training on the handling of malaria cases2003Nil
Provision of first aid kits to 44 households in the health districtAt least 50%) of household have a first aid kit at home2003Nil
Gradually raise to 80% the number of trained health personnel on the management of malariaAt least 80%) of the training institution have a document on the norms of managing malariaAs from 2003Currently going on
Training of members of communication structures and community agents on the techniques of using treated mosquito netsNumber of trained community agents2003Nil
Providing treated mosquito nets to at least 50%) of pregnant womenEffective distribution of 150 000 mosquito nets in 2002 and the commencement of distribution of 600 000 others in 20032003-2004Nil
Implementation of the Health Strategy: Endemic Emergencies and Catastrophes
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Set up and make an operational national centre and at least two secondary emergency centres.Create national and secondary centres and make them operational2003Currently going on
Implementation of the Health Strategy: STI/AIDS
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Promote the use of preservatives among truck drivers, port employees, soldiers and prostitutesPurchase and distribution of condoms2003Not executed
Create an AIDS counseling and test centre in all provincesNumber of created provincial centres that are operationalNot executed
Provide reagents, consumables and ARV to private non-profit making hospitals.Number of non-profit making private hospital provided with reagents, consumables and ARV2003Currently going on
Provide HIV/AIDS testing facilities to health centresNumber of services, units or blood transfusion centres, blood depots and banks with test facilities for HIV. Hepatitis B and C and syphilis20032
Implementation of the Health Strategy: Fight against Tuberculosis
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Carry out studies for the construction of a diagnosis and treatment centre that will be operational and capable of handling 50 000 to 100 000 patients in all the provincesStudies available in each province2003The province has 21 CDTs (12 state and 9 private) that are ooperational for 2.1 million inhabitants (2003)
Spread the use of guided techniques in the handling of patients in diagnosis and treatment centresNumber of diagnosis and treatment centres provided with a technical guided for the handling of tuberculosis patients. Number of tuberculosis cases identified and treated2003The 21 CDTs have at least 63 monitors

(3 per CDT) 4200 cases identified and handled
Equipping diagnosis and treatment centres (CDT) with microscopes that are in working orderNumber of CDTs with a microscope in working condition2003All CDTs (21)
Train and organize refresher courses for doctors, nurses, lab technicians handling tuberculosis cases in the existing CDTsNumber of doctors, nurses and lab technicians who have been trained and sent for refresher courses in each existing CDT200321 doctors

21 Nurses

21 lab technicians
Draft and adopt a national communication plan on tuberculosisAvailable plan and its operating methods2003Plan available and partly implemented
Implementation of the Health Strategy: Extended Imminization Programme (PEV)
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Extend the vaccination coverage to DTC3Vaccination coverage rate200372%
Provide health centres with cooling facilitiesNumber of health centres with operational cooling facilities2003All SSDs have cold rooms. However, there is a noticeable imbalance in the distribution of refrigerators and freezers used for keeping vaccines.
Reinforce the logistics of the vaccination teamsNumber of motorcycles acquired; Number of vaccination teams with motorcycles200372/151
Implementation of the Health Strategy: Basic drugs, reagents and medical facilities
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Making basic drugs, especially generic ones, available in health centres, as well as reagents and other basic medical facilitiesNumber of health centres with basic drugs, reagents and basic medical facilties2003
Drafting and providing health centres with therapy guidesAvailability of guide in health centre2003
Drafting and providing all health centres with the national formula on basic drugsNumber of health centres that have received the national formula on medication2003
Implementation of the Health Strategy: Basic drugs, reagents and medical facilitie
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Drafting of a mutual CodeDrafting, publishing and dissemination of the mutual code2003
Implementation of the Health Strategy: Mother, Child and Adult Health
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Promoting the vaccination of pregnant women consulted for tetanus infectionsNumber of women consulted and vaccinated against tetanus2003
Increase the number of deliveries conducted by trained personnelNumber of deliveries handled in the presence of trained personnel2003
Conduct systematic diagnosis of mammary and cervix cancerNumber of mammary and cervix cancers identified and treated2003
Implementation of the Health Strategy: Promoting the integrated handling of children diseases
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Introducing PCIME in all health centresNumber of health districts using the PCIME2003
Train Chief district medical officers and Centre chiefs involved in the PCIMENumber of Chief district medical officers and Centre chiefs that have been trained on PCIME2003
Implementation of the Health Strategy: Food and Nutrition
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Give children of between 6 months and 5 years vitamin A capsules, two times a yearNumber of children of between 6 months and 5 years who have received vitamin A capsules two times a year200333%
Get first class health service to monitor the growth of young childrenAt least 25% of first class health service monitor the growth or young children2003
Implementation of the Health Strategy: Improving the supply of Services
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Rehabilitation of training centresAt least 25 % of health training centres that have been rehabilitated and made operational2003
Construction of new integrated health centres in health areas that have not been coveredNumber of integrated health centres constructed2003
Implementation of the Health Strategy: Management Process
Measures/ActionsMonitoring indicatorsScheduleState of Execution
Train heads of district health services, chief medical officers for hospital districts, sub-directors in central and external services on drafting and management techniques of integrated budgets according to objectivesAt least 25% of heads of district health services, chief medical officers of district hospitals and sub-directors of central and external services trained2003Not executed
Construct service houses for medical officers working in difficult areas.At least 100 service houses constructed for medical officers working in difficult areas2003Not executed
Rehabilitation of waste water purification and treatment stationsNumber of rehabilitation stationsAs from 2003
Cleaning the primary drainage networks; rehabilitation of waste water purification and treatment stationsLinear of the drained networkPermanent
Rehabilitation of basic infrastructures (public road networks and lighting)Rehabilitated linearPermanentRue King Akwa 70% / Wouri bridge Rue Jau 90% / Bd de I‘Independence; Bd Leclerc
Structuring of urban extension zones and secondary urban centresRestructured surface area and drafted development plan2005
Consolidate the partnership between the State and decentralized administrative units to ensure a better management of townsNumber of urban contract signed and implemented2005
Creation of access roads to quarters with poor road networks and restructuring of poorly constructed neighbourhoodsLinear of the rehabilitated or new access road2005
Number of poorly constructed neighbourhoods restructured in collaboration with the population2005
Creation of rehabilitation centres for street childrenNumber of centres created2003-2005
Number of street children trained and reintegrated
Build waste dumps for the disposal of domestic wastesNumber of waste dumps built2005

NORTH PROVINCE

Core area No. 2: Strengthening of growth through diversification of the economy. Development of the rural sector
Measures/ActionsFollow-up indicatorTimetableState of Execution
Improvement of access by the rural population to modern farming and high-yield techniques through the popularization of the results of agronomic research.Number of farmers’ organizations having accessed the results of agronomic researchPermanent729 FO including 7885producers out of which 2128 women have had access to technological innovations within the framework of PNVRA. These innovations are contained in some fifty technical forms being popularized at PNVRA-NORTH. A total 57 of these FO have received funding for infrastructure and equipment for their production micro-projects to the tune of FCFA 39 million.
Promotion of community developmentImplementation of NRDP and CDSPPermanent-commencement of the pilot phase of NRDP in the Mayo-Louti Division

-Setting up of NRDP Provincial Focal Team (PRT) chaired by the North Provincial Delegate of MINEPAT followed by a session to acquaint members with their Fole.

-Identification of two pilot councils (Guider and Figuil) and villages, that is, five per council

-setting up of two Joint Council-level Approval and Supervision Communities (CPAC) (one in Guider and one in Figuil chaired by the mayors of these councils).

-briefing and training session organized by the PRT at Guider for the members of the two CPAC).

-Examination for the identification of micro-projects and mechanism of mobilization of contra required for NRDP financing at the level of village communities (10 communities) by CPAC members.

-reception of some files by the PRT chairman for forwarding to the National Unit of NRDP

-publication of results of recruitment test for officials of the Provincial Unit of NRDP
Promotion of and support to the development of professional and interprofessional organizationsElaboration of concerted strategy for the promotion and development of farmers’ organizationsPermanent- Guidance to Environmental NGOs, unions of hunting guides, exploiters of firewood and plank
Number of organizations having received supportPermanent- Out of 729 FO, supervised within the framework of PNVRA, more than 100 FO have legal status. In addition, some FO dealing in maize and onion have received structuring support to become Professional Producers’ Associations (PPA) (Ngong, Lagdo, Poli). These PPA all have a legal status and have received support in the area of management.

- A total 57 of these FO have received funding for infrastructure and equipment for their production micro-projects to the tune of FCFA 39 million

- the 2 maize and onion production sectors are currently being established in the Benue and Faro divisions

- 7 organizations of the forest sector are receiving support
Improvement of fishing productivity through the introduction of new alevin speciesNumber of restocking fish introduced2003-2004Capacity building forrestocking fish producers of the Gounougou/Lagdo Fishing Centre

Production of25 000 alevins in the Gounougou/Lagdo Fishing Centre Support to fish farmers for the creation offish ponds Implementation of the fish farming component of the Special Food Security Programme (SFSP)
Launching of specific priority programmes to support the development and organization of priority sectorsCommencement of implementation of specific programmes2003
Development of tourism, cultural services and support services for the productive sector: Promotion of the tourism sector and cultural sectors
Measures/ActionsFollow-up indicatorTimetableState of Execution
Organization in the ten provinces of awareness seminars on the integration of young graduates in tourism professions.Organization of awareness seminars2003-20050
Standardization of tourism establishments and agenciesNumber of tourism establishments and agencies standardized2004-200619 establishments, Benoué Hotel, Tourist Motel, Relais St Hubert, Daoula Hotel, Christella Hotel la Cité, Hotel Central, Hiala Village, Auberge Chic, Hotel le Quilombo, Hotel le Sure, Auberge le Salam I,. Auberge le Salam II, Hotel le FigaFo, les Falls Bergeres, Auberge de la Gare Foutiere, Welcome Hotel,

10 tourism agencies: Cameroon Safari Agency, Lasal Voyages, Norga Voyages, MTA Mouwayne Travel, Auto Location de la Benoué, Auto Location BAO
Core area 3: Boosting of the private sector
Measures/ActionsFollow-up indicatorTimetableState of Execution
Continuation of the fight against dumping and smuggling.Measures to fight dumping and smuggling identified and implemented.Permanent- setting of a Provincial Unit for the fight against the smuggling of pet Foleum products

- setting up of a Provincial Committee for the fight against the smuggling of sugar

- protection of the cotton sector: operation against the illegal export of cotton seed and importation of poor quality table oil

- team of Trade inspectors at major points of entry of imported goods
Execution of major infrastructure construction works in support of the industrial sector (Wouri bridge, urban road networks in Yaounde and Douala, unifying roadsIdentification of priority projects in consultation with the private sector Sourcing for resources and carrying out of worksFrom 2003
Core area No. 4: Development of economic infrastructure and natural resources Development of telecommunications and information and communication technologies
Measures/ActionsFollow-up indicatorTimetableState of Execution
Setting up of community multimedia centres in the ten provinces Reorganization of school disciplines and curricula in secondary general and technical education to include computer literacy coursesAt least ten centres are functional Computer equipment availableFrom 2003- computer equipment in the Garoua Government Technical High School where there is a multimedia centre (39 computers, two servers, 17printers, 1 scanner, 1 engraver, 1 backup battery, 12 software, 1 mixing window).

- 12 new computers and 12 new printers were acquired in the course of December 2003for the following establishments:

Government Technical High School: Garoua, Guider

GTC: Garoua, Garoua Djamboutou, Poli, Tchollire, Pitoa, Figuil;

SAP/JSM: Garoua, Poll, Guider, Touboro

- teaching of computer literacy effective in the second cycle and gradual inclusion in the curricula of the 1st cycle
Improvement of the capacity and quality telecommunication of infrastructure (increase in fixed and mobile telephone lines)Number of structures set up2003-20051 earth station in Garoua by CAMTEL establishment of Orange networks in Guider and Figuil

1 MTN transmitter under construction in Garoua
Increase in fixed and mobile telephone line coverage2003-2005CAMTEL:

Garoua: 10 000

Guider: 5000
Establishment of new rural radio stations and setting up of community tele-centres in rural areasNumber of rural radio stations set upFrom 20031 rural radio station, FM Benoué in Garoua with transmitter broadcasting over a radius of about 50km
Number of tele-centres set upFrom 20038 tele-centres: Bibemi, Bidzar, Doumo, Golombe, Lam, Mousgoy, Rey-Bouba, Touboro
Natural resources management: ease access by all to energy
Measures/ActionsFollow-up indicatorTimetableState of Execution
Establishment of a rational cooking gas distribution network in ecologically fragile regionsEcologically fragile areas identified2003-2005Faro, Mayo-Rey and Mayo-Louti Divisions
Rate of access to cooking gas in there areas2003-2005Access rate:
  • - Faro: 0
  • - Mayo-Louti
  • - Mayo-Rey: 0
Strengthening of inspection of dangerous industrial establishmentsNumber of periodic inspections carried out and revenue generatedPermanent2 periodic inspections per establishment and 72 establishments inspected revenue generated: FCFA 54 714 000
Extension of the fibre-optic cable along the Doba-Kribi pipeline, to Douala and Bafoussam in order to set up a high-output triangle and reduce the cost of communication for private individuals.Fibre-optic cable effectively installed and installation thereof in Douala and Bafoussam2003-2004
Fibre-optic cable marketing policy elaborated and implemented2003-2004
Intensification of water supply programmes (wells, constructed water sources, boreholes, mini water supply schemes)Number of structures realizedFrom 200332 boreholes with HIPC funds

52 structures with IDB funds

2 structures constructed using PIB

0 structure realized by the Water points Reactivation Project (PRPE)
Sourcing for investments in the mining and hydrocarbons sectors Development of the rural electrification project.Volume of investments made Rate of access to electricity in the rural areasPermanent0

rate of access: 2%
Core area No. 6: Reinforcement and development of human resources Other social development policies and strategies
Measures/ActionsFollow-up indicatorTimetableState of Execution
Capacity building for field actors in the area of promotion of women’s affairs within the framework of specialized centres for the promotion of women’s affairs and centres for applied technologiesCapacity building programme elaborated and implemented Organization of seminars and training courses

Number of field actors trained
2003-2005- evaluation of 90 community activity leaders in Garoua and Guider

- setting up of 5 community education centres taking care of250 children

- setting up of 120 associations of mothers of pupils/students

- training seminar for 600 adolescent girls undergoing early stimulation (300 in Garoua and 200 in Guider)

- training of 87 girls and women out of which 21 in home economics, 18 in secretarial duties and office automation and 48 in literacy at the Garoua CPR

- 240 health education sessions at the Garoua CPR
Rehabilitation of welfare institutions for socially disabled childrenNumber of institutions rehabilitated20044 private institutions currently under rehabilitation

- CRESAS (Centre for the Rehabilitation of Deaf Children and Social Welfare)

- CRJR (Josephine Rodofi Rehabilitation Centre): Approval in principle

- CRDV (AdvancedRehabilitation Centre)
- ISDA (Specialized Institute for the Hard of Hearing): Elaboration of Statutes ongoing
Promotion of social welfare services in open milieus for minors in need of social protectionService plan executed every year Number of minors taken care of, trained and integratedPermanent200
Promotion of the development of local mutual assistance initiativesStrategy for the promotion of the development of local initiatives drawn up and implementedPermanent0
Number of initiatives provided support each yearPermanent- 20 persons provided help to the tune of FCFA 30 000 per person

- 32 tricycles given out to the disabled in the PRovince at a total amount of FCFA 6 400 000 and prosthesis costing FCFA 100 000 to one disabled person

- 25 children in distress helped with pharmaceutical products and layette for a total of FCFA 650 000

-150 disabled persons and indigents helped (food) for a total amount of FCFA 600 000

- technical and financial support to:

* Welfare centre for children in distress (MINAS structure)

*A farmers’ CIG provided guidance by the Langui social experimental centre.

A CIG of the blind in the Benoué (FCFA 225 000)
Implementation of education strategy
Measures/ActionsFollow-up indicatorTimetableState of Execution
Seeing to the effective presence of quality teachers in all schools, including the most disadvantaged regionsEffective presence of teachersPermanentTeachers at their stations for the most part
Extend the scope of state intervention in private schools (subvention, posting of teaching staff, improvement of infrastructure)Number of public sector teachers posted to private schools2004
Institution of regular production of static rosters at all levels of the education sectorPeriodic production of statistical directory per level2004- 2002-2003 statistical directory produced

- 2003-2004 statistical directory underway

- Rosters produced by primary schools and other establishments yearly
Promotion of access to information and communication technologies in the educational systemNumber of pilot government high schools equipped with computer units; Number of students trained in computer literacy2004- 1 government high school equipped with multimedia centre: Garoua Government High School and 1175 students trained

- Garoua Grammar School equipped with a resource and multimedia centre and 2534 students trained
Provision of technical, technological and vocational trainingNumber of training sessions provided
Number of students trained
Equipment of university institutions with computer equipmentNumber of institutions equipped
Rate of student access to computer
Implementation of health strategy: malaria control
Measures/ActionsFollow-up indicatorTimetableState of Execution
Provision of training and retraining to health personnel in case management in health districtsAt least 90%) of health personnel retrained in case management20037 Provincial trainers trained
Ensuring the availability of home management kits in households in 44 health districtsAt least 50%) of households in possession of a home management kit20030
Gradually raising to 80% the rate of health units having a malaria management protocolAt least 80%) of health units have malaria management protocol documentsFrom 2003Activity partly carried out in 2003
Provision of training to members of dialogue structures and community workers in mosquito net impregnation techniquesNumber of community workers trained20030
Provision of insecticide-treated mosquito nets to at least 50%) of pregnant womenEffective distribution of 150 000 mosquito nets in 2002 and commencement of distribution of 660 000 others acquired in 20032003-2004- 3650 mosquito nets distributed (Garoua urban area: 2900; Guider: 500; Pitoa: 250)

- 8350 are currently being distributed in 9 districts
Implementation of health strategy: endemic emergencies and disasters
Measures/ActionsFollow-up indicatorTimetableState of Execution
Setting up and operation of a national centre and at least two secondary emergencies management centresNational centre and secondary centres set up and functional20030
Implementation of health strategy: STIs/AIDS
Measures/ActionsFollow-up indicatorTimetableState of Execution
Promotion of condom use among truck drivers, port employees, military personnel and sex workersPurchase and distribution of condoms20030
Setting up of an HIV testing and counselling centre in each provinceNumber of Provincial centres set up and functionalI voluntary testing centre functional in Garoua
Putting reagents, consumables and ARVs at the disposal of private not-for-profit hospitalsNumber of private not-for-profit hospitals provided with reagents, consumables and ARVs20030
Putting HIV/AIDS testing equipment at the disposal of health centresNumber of blood transfusion services, units, blood storage facilities and banks having tests for HIV, Hepalilis B and C and syphilis2003I2 health centres and district hospitals have tests and equipment.
Implementation of health strategy: Tuberculosis control
Measures/ActionsFollow-up indicatorTimetableState of Execution
Carrying out architectural studies towards the building of a functional diagnosis and treatment centre for 50 000 to 100 000 inhabitants, in each provinceStudy available for each province20030
Popularization of the use of the Technical tuberculosis management Manual in diagnosis and treatment centresNumber of diagnosis and treatment centres having a tuberculosis management Manual; Number of tuberculosis cases detected and treated2003
  • - 11 centres
  • - 218 tuberculosis cases
Equipment of DTC with functional microscopesNumber of DTC with functional microscope200311
Training and retaining of doctors, nurses, laboratory technicians in tuberculosis management in each existing DTCNumber of doctors, nurses, laboratory technicians trained and retrained in each existing DTC2003
  • - 1 doctor/DTC
  • - 1 nurse/DTC
  • - I lab. Technician/DTC
Elaboration of a national communication plan on tuberculosisPlan available and operational20030
Implementation of health strategy: Extended Immunization Programme
Measures/ActionsFollow-up indicatorTimetableState of Execution
Improvement of DPT3 immunization coverageRate of immunization coverage200327.2%
Equipment of health units with cold chainsNumber of health units with functional cold chain200350% of health units
Reinforcement of logistical resources for vaccination teamsNumber of motorbikes acquired; Number of vaccination teams having a motorbike.200326 motorbikes for 13 teams
Implementation of health strategy: essential drugs, reagents and medical supplies
Measures/ActionsFollow-up indicatorTimetableState of Execution
Rendering available in all health units essential drugs, preferably under their generic form, reagents and medical suppliesNumber of health units having essential drugs, reagents and medical supplies2003172
Drawing up and rendering available in all health units the therapeutic guideGuide available in health units2003Still to be done
Drawing up and rendering available in all health units the national essential drugs formularyNumber of health units having received the national drugs formulary.2003154
Implementation of health strategy: healthcare financing
Measures/ActionsFollow-up indicatorTimetableState of Execution
Elaboration of the mutual health insurance codeElaboration, publication and dissemination of mutual health insurance code2003Still to be done
Implementation of health strategy: health of the mother, the adolescent and the elderly
Measures/ActionsFollow-up indicatorTimetableState of Execution
Promotion of immunization of pregnant women in consultation against tetanusNumber of pregnant women consulted and immunized against tetanus2003TT: 24,353
Improvement of rate of deliveries attended to by qualified health staffNumber of deliveries attended to by qualified health staff2003
Carrying out systematic screening for breast and cervical cancerNumber of breast and cervical cancers identified and treated20030
Implementation of health strategy: promotion of the integrated management of childhood diseases
Measures/ActionsFollow-up indicatorTimetableState of Execution
Institution of IMCD in health districtsNumber of health districts implementing IMCD20030
Training of district medical officers and heads of integrated health centres in IMCDNumber of district medical officers and heads of integrated health centres trained in IMCD20030
Implementation of health strategy: food and nutrition
Measures/ActionsFollow-up indicatorTimetableState of Execution
Administration of vitamin A capsules to children between 6 months and 5 years twice yearlyNumber of children between 6 months and 5 years having received vitamin A capsules twice yearly200324,799
Bringing first-level health services to monitor the growth of childrenAt least 25% of Bringing first-level health services monitor the growth of children2003100%
Implementation of health strategy: improvement of healthcare provision
Measures/ActionsFollow-up indicatorTimetableState of Execution
Rehabilitation of training institutionsAt least 25%) of training institutions are rehabilitated and functional200350 (renovation/equipment of Garoua SENS)
Construction of new integrated health centres in health areas not coveredNumber of IHC built20037
Implementation of health strategy: managerial process
Measures/ActionsFollow-up indicatorTimetableState of Execution
Training of district medical officers, chief medical officers of district hospitals, sub-directors of central and external services on the techniques of drawing up and management of integrated budgets by objectivesAt least 25% of district medical officers, chief medical officers of district hospitals, sub-directors of central and external services are trained20030
Building of staff residences for medical officers working in difficult areasAt least 100 staff residences built for medical officers working in difficult areas20030
Poverty reduction in urban areas
Measures/ActionsFollow-up indicatorTimetableState of Execution
Rehabilitation of waste water purification and treatment plantsNumber of plants rehabilitatedAs from 20030
Ensuring the cleaning up of primary drainage networks, rehabilitation of waste water purification and treatment plantsNetwork lines drainedPermanent4737
Rehabilitation of basic infrastructure (public highways and lighting)Network rehabilitatedPermanent22km of Roads rehabilitated.
Structuring of urban extension zones and secondary urban centresAcreage restructured and development plan drawn up2005Contract signed and awarded for the drawing up of the Lagdo urban development plan
Contracting partnership between the state and decentralized local government units for better urban managementNumber of town management contracts signed and implemented20050
Opening up difficult-to-access neighbourhoods and restructuring of zones of disorderly occupationAccess roadways rehabilitated or created2005
  • - study available for 5 km of Roads
  • - Kakoumi street
  • - Yadado Kilba street
  • - Mamadi Kota street
  • - Carrefour May-Chai street
  • - Invitations to tender launched, contracts awarded for the tarring of 2 km of the Lainde main street
Number of disorderly neighbourhoods restructured in consultation with the population20050
Setting up of rehabilitation centres for the welfare of street childrenNumber of street children trained and rehabilitated2003-2005-
Set up dumps for household refuseNumber of refuse dumps set up2005-

NORTH-WEST PROVINCE

Core area No. 2: Strengthening of growth through diversification of the economy. Development of the rural sector
Measures/ActionsFollow-up indicatorTimetableState of Execution
Improvement of access by the rural population to modern farming and high-yield techniques through the popularization of the results of agronomic research.Number of farmers’ organizations having accessed the results of agronomic researchPermanent
  • 1638 (out of which 124 are made up exclusively of women) FO supervised in 2003 and trained in 5 topics on techniques of improving yields at 83%
  • 157 farmers’ organizations trained 100% on 7 specific themes
  • 12 pesticide sellers/retailers counselled on how to better help farmers
  • production of improved varieties of basic seed maize and Irish potato
  • training of specialized technicians and farmers’ organizations in seed multiplication skills
  • training of specialized technicians and farmers’ organizations in milk production and processing techniques
  • training offarmers in ethnovet techniques for the protection of animal health, 20%
  • popularization of research findings through trials in farmers’ milieus to apprise 305 farmers with foodstuff protection techniques
  • training and putting in place 25 farmers for the rearing of Aulocades
Promotion of community developmentImplementation of NRDP and CDSPPermanent
  • 6 Development Committees organized: 60%
  • 15 groups trained on the conduct of income-generating activities, action, maintenance
  • good progress of work on rural roads under maintenance (2 roads, 5 bridges, 3 embankments)
  • 12 drinking water supply projects executed at more than 60% in general
  • good progress of construction of 11 community buildings, 70% carried out, 3 rooms, 3 health centres and 5 primary schools
  • project initiated for rehabilitation of water dam-Mbatu (CDSP)
  • sensitization took place (NRDP)
  • implementation of management plans ongoing (9) (KIFP+BHH)
  • agro-forestry trees supplied to farmers and planted (PAFRA)
Promotion of and support to the development of professional and interprofessional organizationsElaboration of concerted strategy for the promotion and development of farmers’ organizations



Number of organizations having received support
Permanent
  • organizational and managerial capacity building provided to more than 1000farmers’ organizations
  • 120 farmers’ organizations received financial support from the government within the framework of “assistance to farmers” component of the PNVRA totalling FCFA 87,515,225; 50% satisfied at 100% and 50% at 72%.
  • 2 unions of farmers’ organizations: BIPRU (Bui Irish Potato Farmers’ Union) all involved in the production of Irish potatoes are presently being followed up
  • assisted 20 producer organizations to formulate several micro-livestock production projects
Development of tourism, cultural services and support services for the productive sector: Promotion of the tourism sector and cultural sectors
Measures/ActionsFollow-up indicatorTimetableState of Execution
Launching of specific priority programmes to support development and the organization of priority sectorsCommencement of implementation of specific programmes2003
  • Irish potato sub-sector:
    • - Situation study for the sector carried out in Bui Division
    • - 93 producer organizations supervised: 100% realization
    • - 15 seed multipliers trained in Boyo Division
  • Milk sub-sector:
    • - Situation study for the sector carried out in Boyo Division
    • - 11 producer organizations are currently being organized and followed up (Boyo 6, Mezam 5)
  • Palm oil sub-sector
    • - Sensitization and registration of candidates ongoing (Bui, Momo,
    • - Donga Mantung, Ngoketunjia, Menchum)
    • - 19 NGOs and CIG identified for the production of plantlets
  • Plantain sub-sector:
    • - Sensitization and identification of farmers ongoing (Mezam, Boyo and Bui)
    • - 3 divisional supervisors appointed
    • - 1 NGO already identified for the multiplication of shoots
  • Swamps Development Programme
    • - Sensitization ongoing (province)
    • - Registration of beneficiary groups ongoing in the divisions 129 motor-pumps allocated to the North-West already executed
Rendering operational the Forest/Environment Sector Project (FESP)Implementation of FESP
Finalization and implementation of instrument on adjustment fundInstrument finalized and implemented.2003-2004
Drawing up and implementation of rural hydraulics master planRural hydraulics master plan drawn up and made public2003-
Application of instrument on community forestsInstrument on community forests adopted, published and implemented2003o
Regulation of the logging of non ligneous forest productsInstrument published and disseminatedo
Improvement of the periodicity of fishing through the introduction of new species of alevinsNumber of alevins introduced
Organization in the ten provinces of awareness seminars on the integration of young graduates in tourism professions.Organization of awareness seminars2003-20050
Standardization of tourism establishments and agenciesNumber of tourism establishments and agencies standardized2004-200619 establishments, Benoué Hotel, Tourist Motel, Relais St Hubert, Daoula Hotel, Christella Hotél la Cite, Hotel Central, Hiala Village, Auberge Chic, Hotel le Quilombo, Hotel le Saré, Auberge le Salam I,. Auberge le Salam II, Hotel le FigaFo, les Falls Bergéres, Auberge de la Gare Foutiére, Welcome Hotel, 10 tourism agencies: Cameroon Safari Agency, Lasal Voyages, Norga Voyages, MTA Moywavne Travel, Auto Location de la Benoué, Auto Location BAO
Core area No. 3: Boosting of the private sector
Measures/ActionsFollow-up indicatorTimetableState of Execution
Execution of major infrastructure construction works in support of the industrial sector (Wouri bridge, urban road networks in Yaounde and Douala, unifying roadsIdentification of priority projects in consultation with the private sector Sourcing for resources and carrying out of worksFrom 2003
  • Organization of Trade Fairs 100%
  • Organization of Handicraft Competitions 100%
  • Sensitization of actors of the Private Sectors on the need to improve on their business and 65%
  • Creation of business contacts for business men with partners abroad (encouraging) 65%
  • Promotion of Small and Medium Size Enterprises
  • Organizing the Informal Sector
  • Technological competition/Exhibition 100%
Core area No. 4: Development of economic infrastructure and natural resources Development of telecommunications and information and communication technologies
Measures/ActionsFollow-up indicatorTimetableState of Execution
Setting up of community multimedia centres in the ten provinces Reorganization of school disciplines and curricula in secondary general and technical education to include computer literacy coursesAt least ten centres are functional Computer equipment availableFrom 2003Private initiative in private schools, PHS Batibo, CCC Mankon, JMBC Ndu, St Joseph College Mbengwi, etc, where computer labs have been created as well as at TRC through French Cooperation. On the part of government institutions, GBHS Bamenda has just been equipped with a pilot computer centreNot yet implanted27computers supplied by MINETFOPNo programme on information technology indicated
Improvement of the capacity and quality telecommunication of infrastructure (increase in fixed and mobile telephone lines)Number of structures set up2003-2005
Increase in fixed and mobile telephone line coverage2003-2005
Establishment of new rural radio stations and setting up of community tele-centres in rural areasNumber of rural radio stations set upFrom 2003Building for rural radio prepared in Nkambe and Wum by population. No equipment vet
Number of tele-centres set upFrom 2003
Natural resources management
Measures/ActionsFollow-up indicatorTimetableState of Execution
Establishment of a rational cooking gas distribution network in ecologically fragile regionsEcologically fragile areas identified2003-2005
Rate of access to cooking gas in there areas2003-2005-
Extension of the fibre-optic cable along the Doba-Kribi pipeline, to Douala and Bafoussam in order to set up a high-output triangle and reduce the cost of communication for private individuals.Fibre-optic cable effectively installed and installation thereof in Douala and Bafoussam2003-2004
Fibre-optic cable marketing policy elaborated and implemented2003-2004
Intensification of water supply programmes (wells, constructed water sources, boreholes, mini water supply schemes)Number of structures realizedFrom 2003Ten (10) sources constructed
Sourcing for investments in the mining and hydrocarbons sectors Development and extension of the rural electrification project.Volume of investments made Rate of access to electricity in the rural areasPermanent32%
Core area No. 6: Reinforcement and development of human resources Other social development policies and strategies
Measures/ActionsFollow-up indicatorTimetableState of Execution
Rehabilitation of welfare institutions for socially disabled childrenNumber of institutions rehabilitated2004
Promotion of social welfare services in open milieus for minors in need of social protectionService plan executed every year Number of minors taken care of, trained and integratedPermanent
Promotion of the development of local mutual assistance, family support and guidance initiativesStrategy for the promotion of the development of local initiatives drawn up and implementedPermanent
Number of initiatives provided support each yearPermanent
Implementation of education strategy
Measures/ActionsFollow-up indicatorTimetableState of Execution
Institution in collaboration with UNICEF, UNESCO and NGOs a mechanism for the sensitization of parents and the community on the benefits of educating childrenConcerted strategy for the sensitization of parents and the community drawn up and implemented Setting up of ad hoc units for the sensitization of parents and the community2003No organ nor information centre to sensitize the parents
Seeing to the effective presence of quality teachers in all schools, including the most disadvantaged regionsEffective presence of teachersPermanent
Extension of the scope of state intervention in private schools (subvention, posting of teaching staff, improvement of infrastructure)Number of public sector teachers posted to private schools2004
Institution of regular production of static rosters at all levels of the education sectorPeriodic production of statistical directory per level2004
Promotion of access to information and communication technologies in the educational systemNumber of pilot government high schools equipped with computer units:

Number of students trained in computer literacy
2004
Provision of technical, technological andNumber of training sessions provided2003-2004
vocational trainingNumber of students trained2003
Equipment of university institutions with computer equipmentNumber of institutions equipped2003
Rate of student access to computer2003
Implementation of health strategy: malaria control
Measures/ActionsFollow-up indicatorTimetableState of Execution
Provision of training and retraining to health personnel in case management in health districtsAt least 90%) of health personnel retrained in case management2003
Ensuring the availability of home management kits in households in 44 health districtsAt least 50%) of households in possession of a home management kit2003
Gradually raising to 80% the rate of health units having a malaria management protocolAt least 80%) of health units have malaria management protocol documentsFrom 2003
Provision of training to members of dialogue structures and community workers in mosquito net impregnation techniquesNumber of community workers trained2003
Provision of insecticide-treated mosquito nets to at least 50% of pregnant womenEffective distribution of 150 000 mosquito nets in 2002 and commencement of distribution of 660 000 others acquired in 20032003-2004
Implementation of health strategy: endemic emergencies and disasters
Measures/ActionsFollow-up indicatorTimetableState of Execution
Setting up and operation of a national centre and at least two secondary emergencies management centresNational centre and secondary centres set up and functional20030
Implementation of health strategy: STIs/AIDS
Measures/ActionsFollow-up indicatorTimetableState of Execution
Promotion of condom use among truck drivers, port employees, military personnel and sex workersPurchase and distribution of condoms2003
Setting up of an HIV testing and counselling centre in each provinceNumber of Provincial centres set up and functional
Putting reagents, consumables and ARVs at the disposal of private not-for-profit hospitalsNumber of private not-for-profit hospitals provided with reagents, consumables and ARVs2003
Putting HIV/AIDS testing equipment at the disposal of health centresNumber of blood transfusion services, units, blood storage facilities and banks having tests for HIV, Hepatitis B and C and syphilis2003
Implementation of health strategy: Tuberculosis control
Measures/ActionsFollow-up indicatorTimetableState of Execution
Carrying out architectural studies towards the building of a functional diagnosis and treatment centre for 50 000 to 100 000 inhabitants, in each provinceStudy available for each province2003
Popularization of the use of the Technical tuberculosis management Manual in diagnosis and treatment centresNumber of diagnosis and treatment centres having a tuberculosis management Manual; Number of tuberculosis cases detected and treated2003
Equipment of DTC with functional microscopesNumber of DTC with functional microscope2003
Training and retraining of doctors, nurses, laboratory technicians in tuberculosis management in each existing DTCNumber of doctors, nurses, laboratory technicians trained and retrained in each existing DTC2003
Elaboration of a national communication plan on tuberculosisPlan available and operational2003
Implementation of health strategy: Extended Immunization Programme
Measures/ActionsFollow-up indicatorTimetableState of Execution
Improvement of DPT3 immunization coverageRate of immunization coverage2003